ONEOK NGL PIPELINE, LLC

(Operator ID:32109 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data since 2006. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

ONEOK NGL PIPELINE, LLC Federal Inspections
All Pipeline Systems(A)(1) : 2006-2018
2018 YTD 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 0 3 20 0 2 8 5 5 2 5 8 2 2 62
Days On-Site 0 26 157 0 10 8 35 30 8 20 23 3 4 323
System-Wide Program Inspection
Number 1 1 2 2 1 1 0 2 0 0 2 2 0 14
Days On-Site 9 0 81 69 0 13 0 50 0 0 9 25 0 255
Targeted Inspection/Investigation
Number 3 2 2 1 11 5 5 5 3 4 4 3 1 49
Days On-Site 97 0 0 31 35 89 86 62 3 16 38 119 0 574

Site-Specific Field Inspections - Includes inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines. These inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control; pipeline inspection, testing, and repairs; emergency safety devices and remote instrumentation; right-of-way marking; valve operability; equipment maintenance; interaction with emergency services officials; participation in One-Call Systems; personnel training and qualification; emergency response preparedness; and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Includes inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire pipeline system or network of pipeline facilities. These inspections/activities include those which cover operating, maintenance, and emergency procedures; integrity management, operator qualification, control room management, public awareness, and damage prevention programs; spill preparedness and response planning; and, procedures, processes, and plans covering other pipeline safety and compliance activities.

Targeted Inspections/Investigations - Includes inspections, investigations, and other activities related to specific pipeline safety issues or concerns, or areas which have been targeted for special review or emphasis. These inspections/activities include failure investigations, follow-up activities for identified compliance or safety issues, investigations into public concerns or complaints, new construction inspections, drug and alcohol program inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

ONEOK NGL PIPELINE, LLC Federal Inspections
All Pipeline Systems(A)(1) : 2006-2018
Start Date Category Type PHMSA Lead Region Days On-Site Total Days Enforcement Case(s) Initiated
08/01/18 System-Wide Program Inspection Integrated Program Inspection Southwest 9.0 18.8
08/01/18 Targeted Inspection/Investigation Construction Inspection Southwest 17.1 19.1
04/23/18 Targeted Inspection/Investigation Construction Inspection Central 34.8 35.2
03/20/18 Targeted Inspection/Investigation Construction Inspection Western 45.0 46.0
10/06/17 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 0.0 1.6
09/28/17 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 0.0 0.4
06/05/17 Site-Specific Field Inspection Specialized Field Inspection Central 3.0 6.0
03/27/17 System-Wide Program Inspection Integrated Program Inspection Western 0.0 10.0
02/12/17 Site-Specific Field Inspection Integrated Field Inspection Western 13.0 14.0
02/12/17 Site-Specific Field Inspection Integrated Field Inspection Western 10.0 14.5
12/12/16 Site-Specific Field Inspection Integrated Field Inspection Central 16.0 16.0
12/07/16 Site-Specific Field Inspection Integrated Field Inspection Central 16.0 16.3
11/28/16 Site-Specific Field Inspection Integrated Field Inspection Central 16.0 16.0
11/04/16 Site-Specific Field Inspection Integrated Field Inspection Central 5.2 5.4
11/04/16 Site-Specific Field Inspection Integrated Field Inspection Central 5.2 5.4
11/04/16 Site-Specific Field Inspection Integrated Field Inspection Central 5.6 5.9
10/27/16 Site-Specific Field Inspection Integrated Field Inspection Central 8.0 8.0
10/26/16 Site-Specific Field Inspection Integrated Field Inspection Central 4.0 4.0
10/24/16 Site-Specific Field Inspection Integrated Field Inspection Central 8.0 8.0
09/19/16 Site-Specific Field Inspection Specialized Field Inspection Western 5.0 6.0
09/09/16 Site-Specific Field Inspection Specialized Field Inspection Western 1.0 2.0
09/08/16 Site-Specific Field Inspection Specialized Field Inspection Western 1.0 2.0
09/07/16 Site-Specific Field Inspection Specialized Field Inspection Western 1.0 2.0
09/06/16 Site-Specific Field Inspection Specialized Field Inspection Western 1.0 2.0
07/26/16 Site-Specific Field Inspection Integrated Field Inspection Southwest 5.0 7.5
07/26/16 Site-Specific Field Inspection Integrated Field Inspection Southwest 5.0 7.2
07/26/16 Site-Specific Field Inspection Integrated Field Inspection Southwest 10.0 13.0
06/23/16 System-Wide Program Inspection Integrated Program Inspection Central 71.0 82.9 320175005
04/15/16 System-Wide Program Inspection Specialized Program Inspection Southwest 10.0 16.0 420175030W,420175031M
03/28/16 Site-Specific Field Inspection Specialized Field Inspection Southwest 0.0 10.9 420165014S
03/24/16 Site-Specific Field Inspection Integrated Field Inspection Southwest 6.0 17.2
03/21/16 Site-Specific Field Inspection Integrated Field Inspection Southwest 38.0 84.3
01/28/16 Targeted Inspection/Investigation Failure Investigation Central 0.0 3.5
01/04/16 Targeted Inspection/Investigation Failure Investigation Southwest 0.0 6.4 420165016W
12/21/15 System-Wide Program Inspection Integrated Program Inspection Southwest 32.0 72.0 420175028
07/06/15 Targeted Inspection/Investigation Construction Inspection Central 31.0 38.0
01/12/15 System-Wide Program Inspection Integrated Program Inspection Southwest 37.0 107.4
12/08/14 Targeted Inspection/Investigation Construction Inspection Central 3.0 6.8
10/14/14 Targeted Inspection/Investigation Failure Investigation Southwest 0.0 6.4 420165006W
09/15/14 Site-Specific Field Inspection Integrated Field Inspection Western 5.0 5.0
09/08/14 Site-Specific Field Inspection Integrated Field Inspection Western 5.0 5.0
05/22/14 Targeted Inspection/Investigation Construction Inspection Central 3.5 4.6
05/22/14 Targeted Inspection/Investigation Construction Inspection Central 1.0 1.1
04/21/14 Targeted Inspection/Investigation Construction Inspection Western 19.0 31.0
04/17/14 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 0.0 2.3
04/10/14 Targeted Inspection/Investigation Drug & Alcohol Inspection Western 3.0 9.0
04/08/14 Targeted Inspection/Investigation Construction Inspection Southwest 5.0 6.6
03/11/14 Targeted Inspection/Investigation Construction Inspection Southwest 0.0 3.0
01/14/14 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 0.0 2.7
01/06/14 System-Wide Program Inspection Integrated Program Inspection Western 0.0 12.0
01/02/14 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 0.0 11.0
11/20/13 Site-Specific Field Inspection Integrated Field Inspection Central 2.0 2.0
11/18/13 Site-Specific Field Inspection Integrated Field Inspection Central 2.0 2.0
11/04/13 Site-Specific Field Inspection Integrated Field Inspection Central 3.0 3.0
09/02/13 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 0.0 33.0
08/14/13 Site-Specific Field Inspection Integrated Field Inspection Central 0.1 0.1
08/14/13 Site-Specific Field Inspection Integrated Field Inspection Central 0.1 0.1
08/14/13 Site-Specific Field Inspection Integrated Field Inspection Central 0.1 0.1
08/14/13 Site-Specific Field Inspection Integrated Field Inspection Central 0.1 0.1
08/14/13 Site-Specific Field Inspection Integrated Field Inspection Central 0.1 0.1
06/17/13 System-Wide Program Inspection Integrated Program Inspection Central 12.5 20.7 320145011W
06/01/13 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 0.0 22.0
03/04/13 Targeted Inspection/Investigation Construction Inspection Southwest 67.5 104.9 420135020W,420145009
02/13/13 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 6.0 6.0
01/07/13 Targeted Inspection/Investigation Construction Inspection Western 15.0 35.0
12/19/12 Targeted Inspection/Investigation Failure Investigation Southwest 2.0 10.4
11/09/12 Targeted Inspection/Investigation Failure Investigation Central 3.0 3.0
11/09/12 Site-Specific Field Inspection Specialized Field Inspection Central 1.0 1.0
11/07/12 Site-Specific Field Inspection Unit Inspection Central 21.0 26.7 320135020
09/28/12 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 2.0 8.4
08/24/12 Site-Specific Field Inspection Unit Inspection Central 5.5 6.6
05/08/12 Targeted Inspection/Investigation Construction Inspection Western 66.0 80.0
05/08/12 Targeted Inspection/Investigation Construction Inspection Central 13.0 18.7
04/23/12 Site-Specific Field Inspection Unit Inspection Central 3.0 7.0 320135020
01/17/12 Site-Specific Field Inspection Integrated Field Inspection Southwest 4.0 16.3
12/13/11 Site-Specific Field Inspection Integrated Field Inspection Southwest 6.0 6.0
10/06/11 System-Wide Program Inspection Specialized Program Inspection Central 8.5 15.8 320121008M,320125021M
08/31/11 System-Wide Program Inspection Integrated Program Inspection Southwest 41.5 56.1 420125029M
08/22/11 Site-Specific Field Inspection Unit Inspection Central 4.0 5.3 320125012
08/08/11 Site-Specific Field Inspection Unit Inspection Central 8.0 20.8 320125012
08/08/11 Targeted Inspection/Investigation Failure Investigation Central 3.0 26.5
08/01/11 Targeted Inspection/Investigation Construction Inspection Western 29.0 53.0
07/24/11 Site-Specific Field Inspection Unit Inspection Central 6.0 7.2 320125012
07/18/11 Site-Specific Field Inspection Unit Inspection Central 6.0 8.6 320125012
07/14/11 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 10.5 15.5
02/24/11 Targeted Inspection/Investigation Failure Investigation Central 13.0 27.9 320115008S
02/17/11 Targeted Inspection/Investigation Failure Investigation Central 6.0 16.5
12/02/10 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 3.0 4.8
11/05/10 Targeted Inspection/Investigation Failure Investigation Southwest 0.0 2.0
11/01/10 Targeted Inspection/Investigation Failure Investigation Southwest 0.0 2.9 420105016S
09/21/10 Site-Specific Field Inspection Unit Inspection Western 3.0 3.0
08/30/10 Site-Specific Field Inspection Unit Inspection Western 5.0 5.0
10/21/09 Targeted Inspection/Investigation Drug & Alcohol Inspection Eastern 3.0 3.0
08/24/09 Targeted Inspection/Investigation Construction Inspection Western 10.0 10.0
06/10/09 Site-Specific Field Inspection Unit Inspection Central 3.0 3.0 320095019
06/07/09 Site-Specific Field Inspection Unit Inspection Central 3.0 3.0 320095019
06/01/09 Site-Specific Field Inspection Specialized Field Inspection Western 2.5 5.5
04/08/09 Site-Specific Field Inspection Unit Inspection Central 5.0 5.0 320095019
04/06/09 Site-Specific Field Inspection Unit Inspection Central 6.5 6.5
04/05/09 Targeted Inspection/Investigation Construction Inspection Central 0.0 5.0 320095007
03/19/09 Targeted Inspection/Investigation Other Inspection Southwest 3.0 4.1
12/09/08 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Western 1.0 1.0
10/20/08 Site-Specific Field Inspection Unit Inspection Central 4.0 4.0
09/02/08 Site-Specific Field Inspection Unit Inspection Central 3.8 3.8
09/02/08 Site-Specific Field Inspection Operator Qualification Field Verification Central 0.2 0.2
08/11/08 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Southwest 0.0 1.0
07/16/08 Site-Specific Field Inspection Specialized Field Inspection Central 1.0 1.0
07/07/08 Site-Specific Field Inspection Unit Inspection Southwest 5.0 5.0
06/23/08 System-Wide Program Inspection Specialized Program Inspection Central 5.0 5.0
06/11/08 Site-Specific Field Inspection Unit Inspection Southwest 2.5 2.8
06/09/08 Targeted Inspection/Investigation Construction Inspection Central 28.5 38.8
06/09/08 Site-Specific Field Inspection Unit Inspection Southwest 2.5 2.5
05/19/08 Targeted Inspection/Investigation Failure Investigation Central 8.1 189.4 320135014,320135015
05/19/08 Site-Specific Field Inspection Unit Inspection Southwest 4.0 4.5
05/05/08 System-Wide Program Inspection Specialized Program Inspection Southwest 4.0 4.0
10/22/07 Targeted Inspection/Investigation Construction Inspection Central 32.0 32.0 320095010
10/15/07 Targeted Inspection/Investigation Construction Inspection Western 48.0 48.0
07/16/07 System-Wide Program Inspection Specialized Program Inspection Southwest 15.0 17.5 420075037M
07/09/07 Site-Specific Field Inspection Specialized Field Inspection Central 1.0 1.0
04/16/07 Targeted Inspection/Investigation Construction Inspection Central 38.5 38.5
03/01/07 Site-Specific Field Inspection Integrity Management Field Verification Southwest 2.0 3.0
01/12/07 System-Wide Program Inspection Integrity Management Inspection Southwest 10.0 16.0 420075046M
12/20/06 Site-Specific Field Inspection Specialized Field Inspection Central 1.0 1.0
11/15/06 Site-Specific Field Inspection Operator Qualification Field Verification Southwest 3.0 3.0
09/21/06 Targeted Inspection/Investigation Compliance/Safety Issue Follow-Up Central 0.0 1.5

For more information on each enforcement type see the Enforcement Type Glossary.

ONEOK NGL PIPELINE, LLC Federal Enforcement Cases
All Pipeline Systems(A)(1) : 2006-2018
2018 YTD 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 0 4 3 0 2 4 5 1 1 3 0 2 1 26
Cases Resolved 1 4 3 1 2 6 1 0 0 0 2 0 2 22
Penalties Proposed 0 36,200 0 0 0 835,600 93,900 0 0 0 0 0 0 965,700
Corrective Action Orders Issued 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

ONEOK NGL PIPELINE, LLC Federal Enforcement Cases
All Pipeline Systems(A)(2): 2006-2018
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
420175028 09/05/17 / / Proposed Compliance Order
Warning Item
Corrosion Control - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST OPEN $0 Yes
420175031M 08/24/17 11/27/17 Notice of Amendment Control Room Management - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420175030W 08/24/17 08/24/17 Warning Letter Qualification of Pipeline Personnel - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
320175005 05/18/17 03/30/18 Proposed Civil Penalty
Proposed Compliance Order
Warning Item
Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Emergency Response - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines
CENTRAL CLOSED $36,200 $36,200 $36,200 Yes
420165014S 05/16/16 / / Notice of Proposed Safety Order
SOUTHWEST OPEN $0 No
420165016W 05/02/16 05/02/16 Warning Letter Procedure Manuals - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420165006W 03/31/16 03/31/16 Warning Letter Procedure Manuals - Hazardous Liquid Pipelines
Qualification of Pipeline Personnel - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
320145011W 10/09/14 10/09/14 Warning Letter Corrosion Control - Hazardous Liquid Pipelines
Damage Prevention - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 No
420145009 04/17/14 09/08/14 Proposed Compliance Order
Warning Item
Fire Protection - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Security - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 Yes
420135020W 09/26/13 09/26/13 Warning Letter Construction - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
320135020 07/03/13 / / Proposed Civil Penalty
Warning Item
Corrosion Control - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
Reporting, General - Hazardous Liquid Pipelines
CENTRAL OPEN $45,700 $22,500 $22,500 No
320135014 05/13/13 / / Proposed Civil Penalty
Proposed Compliance Order
Incident Reports - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
CENTRAL OPEN $559,100 $550,400 $550,400 Yes
320135015 05/13/13 / / Proposed Civil Penalty
Proposed Compliance Order
Corrosion Control - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines (withdrawn)
Procedure Manuals - Hazardous Liquid Pipelines
CENTRAL OPEN $230,800 $0   Yes
320121008M 09/14/12 05/01/13 Notice of Amendment Emergency Response - Gas Pipelines
Public Awareness - Gas Pipelines
CENTRAL CLOSED $0 No
320125021M 09/14/12 05/01/13 Notice of Amendment Procedure Manuals - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 No
420125028 09/12/12 04/22/13 Proposed Civil Penalty
Proposed Compliance Order
Warning Item
Corrosion Control - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $15,300 $15,300 $15,300 Yes
420125029M 09/12/12 01/23/13 Notice of Amendment Control Room Management - Hazardous Liquid Pipelines
Damage Prevention - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
320125012 06/15/12 12/29/16 Proposed Civil Penalty
Proposed Compliance Order
Warning Item
Annual Reports - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
CENTRAL CLOSED $78,600 $78,600 $78,600 Yes
320115008S 06/15/11 12/20/17 Notice of Proposed Safety Order
CENTRAL CLOSED $0 No
420105016S 11/10/10 02/26/15 Notice of Proposed Safety Order
SOUTHWEST CLOSED $0 No
320095019 10/26/09 03/13/12 Proposed Compliance Order
Warning Letter
Emergency Response - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 Yes
320095010 08/12/09 01/26/17 Proposed Compliance Order Corrosion Control - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 Yes
320095007 06/29/09 11/27/13 Proposed Compliance Order Corrosion Control - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 Yes
420075046M 11/29/07 08/12/08 Notice of Amendment Integrity Management - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420075037M 10/04/07 01/22/08 Notice of Amendment Procedure Manuals - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420065019W 05/02/06 05/02/06 Warning Letter Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
320055034 09/16/05 09/01/06 Letter of Concern
Proposed Civil Penalty

Procedure Manuals - Hazardous Liquid Pipelines
CENTRAL CLOSED $7,500 $7,500 $7,500 No
Totals        $973,200 $710,500 $710,500  

Notes

  1. In 2017, PHMSA modified its classification of Inspection activities slightly. These reclassifications were applied retroactively.

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of November 1, 2018.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of November 5, 2018.

For comments and questions on the information presented on this site, please send us feedback.

Feedback | FOIA | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2018 PHMSA | DOT Home | PHMSA Home | PSA Forum | Adobe Reader | Generated: 11/06/18 07:09:28 PM