Federal Enforcement Data
PHILLIPS 66 PIPELINE LLC
(Operator ID:31684 - CURRENTLY ACTIVE OPID)
The reports below provide federal enforcement data since 2006. This information includes both a summary of and specific details pertaining to enforcement cases against this operator. Enforcement by PHMSA's partner State agencies are not included in these reports. Non-Enforcement Data for PHILLIPS 66 PIPELINE LLC.
Enforcement Actions
For more information on each enforcement type see the Enforcement Type Glossary
2023 YTD | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | Total | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Cases Initiated | 0 | 5 | 2 | 2 | 3 | 2 | 2 | 3 | 6 | 5 | 4 | 4 | 3 | 3 | 6 | 7 | 6 | 7 | 70 | |
Cases Resolved | 0 | 6 | 4 | 2 | 1 | 4 | 2 | 1 | 7 | 3 | 5 | 3 | 5 | 8 | 8 | 6 | 7 | 7 | 79 | |
Penalties Proposed | 0 | 552,800 | 0 | 0 | 67,300 | 0 | 62,200 | 0 | 0 | 539,500 | 0 | 19,800 | 0 | 0 | 230,000 | 0 | 0 | 26,000 | 1,497,600 | |
Corrective Action Orders Issued | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 2 |
Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.
Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.
For more information on each enforcement type see the Enforcement Type Glossary.
Case Number | Date Opened | Date Closed | Type | Subject | PHMSA Region | Status | Proposed Penalty | Assessed Penalty | Collected Penalty | Final Compliance Order | |
---|---|---|---|---|---|---|---|---|---|---|---|
42022006NOPV | 09/16/22 | / / | Proposed Civil Penalty Warning Item |
Construction - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines |
SOUTHWEST | OPEN | $552,800 | No | |||
52022033WL | 05/20/22 | 05/20/22 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines Emergency Response - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
52022032NOA | 04/25/22 | 06/02/22 | Notice of Amendment | Emergency Response - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
52022034WL | 04/25/22 | 04/25/22 | Warning Letter | Corrosion Control - Gas Pipelines Emergency Response - Gas Pipelines Maintenance - Gas Pipelines Procedure Manuals - Gas Pipelines |
WESTERN | CLOSED | $0 | No | |||
52022035NOA | 04/25/22 | 09/09/22 | Notice of Amendment | Procedure Manuals - Gas Pipelines |
WESTERN | CLOSED | $0 | No | |||
52021050WL | 10/12/21 | 10/12/21 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines Design - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
52021047NOA | 09/17/21 | 12/14/21 | Notice of Amendment | Control Room Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
320205027M | 11/05/20 | 02/26/21 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
320205028W | 11/05/20 | 11/05/20 | Warning Letter | Annual Reports - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
520195013W | 12/09/19 | 12/09/19 | Warning Letter | Emergency Response Plans - Oil Pipelines |
WESTERN | CLOSED | $0 | No | |||
420195015H | 07/16/19 | 12/20/22 | Corrective Action Order | |
SOUTHWEST | CLOSED | $0 | No | |||
320195006 | 06/14/19 | 05/20/20 | Proposed Civil Penalty | Construction - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $67,300 | $39,700 | $39,700 | No | |
420185029S | 12/11/18 | 01/14/21 | Notice of Proposed Safety Order | |
SOUTHWEST | CLOSED | $0 | No | |||
420185012W | 11/16/18 | 11/16/18 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
520175014W | 06/27/17 | 06/27/17 | Warning Letter | Operations and Maintenance - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420175003 | 02/13/17 | 05/14/18 | Proposed Civil Penalty Proposed Compliance Order |
Operations and Maintenance - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $62,200 | $62,200 | $62,200 | Yes | |
520166010W | 11/15/16 | 11/15/16 | Warning Letter | Integrity Management - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520165009 | 10/26/16 | 09/22/17 | Proposed Compliance Order | Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
420165002 | 02/24/16 | 01/26/22 | Proposed Compliance Order | Construction - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | Yes | |||
420155020W | 10/14/15 | 10/14/15 | Warning Letter | Control Room Management - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420155014M | 07/02/15 | 11/12/15 | Notice of Amendment | Integrity Management - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
520155012M | 06/16/15 | 08/11/15 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
120155007W | 06/08/15 | 06/08/15 | Warning Letter | Integrity Management - Hazardous Liquid Pipelines |
EASTERN | CLOSED | $0 | No | |||
420155008M | 03/31/15 | 06/17/15 | Notice of Amendment | Construction - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420155007W | 03/31/15 | 03/31/15 | Warning Letter | Construction - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
520145015W | 10/10/14 | 10/10/14 | Warning Letter | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420145023 | 09/22/14 | 05/14/18 | Proposed Compliance Order Warning Item |
Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | Yes | |||
420145024M | 09/22/14 | 09/22/14 | Notice of Amendment | Construction - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420145011 | 05/13/14 | 05/14/18 | Proposed Civil Penalty Proposed Compliance Order Warning Item |
Integrity Management - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $175,300 | $175,300 | $175,300 | Yes | |
420145001 | 02/04/14 | 06/17/15 | Proposed Civil Penalty Proposed Compliance Order Warning Item |
Incident Reports - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $364,200 | $364,200 | $364,200 | Yes | |
520135014W | 09/03/13 | 09/03/13 | Warning Letter | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520135012W | 09/03/13 | 09/03/13 | Warning Letter | Design - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520135013M | 09/03/13 | 11/18/13 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520135011 | 08/23/13 | 12/03/13 | Proposed Compliance Order Warning Item |
Corrosion Control - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
520125010W | 04/24/12 | 04/24/12 | Warning Letter | Construction - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420125006M | 03/09/12 | 12/04/14 | Notice of Amendment | Construction - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines (withdrawn) Design - Hazardous Liquid Pipelines Fire Protection - Hazardous Liquid Pipelines (withdrawn) Operations and Maintenance - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines (withdrawn) Pressure Testing - Hazardous Liquid Pipelines Security - Hazardous Liquid Pipelines (withdrawn) |
SOUTHWEST | CLOSED | $0 | No | |||
420125005 | 03/01/12 | 01/11/13 | Proposed Civil Penalty Proposed Compliance Order |
Construction - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $19,800 | $19,800 | $19,800 | Yes | |
520125002M | 02/21/12 | 11/15/12 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520115014 | 04/06/11 | 03/01/12 | Proposed Compliance Order Warning Letter |
Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Public Awareness - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
520115010M | 03/10/11 | 06/29/11 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520115009M | 03/09/11 | 08/12/11 | Notice of Amendment | Damage Prevention - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520105033W | 12/14/10 | 12/14/10 | Warning Letter | Safety Condition Reports |
WESTERN | CLOSED | $0 | No | |||
320105005M | 03/30/10 | 03/11/11 | Notice of Amendment | Integrity Management - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
520105002 | 02/12/10 | 12/13/10 | Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines (withdrawn) |
WESTERN | CLOSED | $0 | No | |||
520090030 | 11/30/09 | 03/30/10 | Proposed Compliance Order | Maintenance - Gas Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
420095006 | 03/30/09 | 04/22/10 | Proposed Civil Penalty | Procedure Manuals - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $200,000 | $200,000 | $200,000 | No | |
520095018W | 03/20/09 | 03/20/09 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines Emergency Response - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520095015 | 03/17/09 | 08/19/11 | Proposed Civil Penalty | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $30,000 | $30,000 | $30,000 | No | |
520095014M | 03/17/09 | 10/01/09 | Notice of Amendment | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520095013 | 02/19/09 | 10/29/09 | Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Incident Reports - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
520085038 | 10/15/08 | 02/28/11 | Proposed Compliance Order | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
520085040M | 10/15/08 | 09/02/09 | Notice of Amendment | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520085039W | 10/15/08 | 10/15/08 | Warning Letter | Integrity Management - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520085028W | 09/08/08 | 09/08/08 | Warning Letter | Operations and Maintenance - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420085011 | 04/08/08 | 12/17/09 | Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | Yes | |||
420085008W | 03/17/08 | 03/17/08 | Warning Letter | Damage Prevention - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420085002H | 01/17/08 | 10/21/09 | Corrective Action Order | |
SOUTHWEST | CLOSED | $0 | No | |||
320075023W | 08/31/07 | 08/31/07 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
320075014M | 03/16/07 | 11/18/10 | Notice of Amendment | Operations and Maintenance - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
320075015M | 03/16/07 | 07/19/07 | Notice of Amendment | Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
320075004W | 03/05/07 | 03/05/07 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
520070005 | 03/02/07 | 09/22/09 | Proposed Compliance Order | General - Gas Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
520075006W | 02/08/07 | 02/08/07 | Warning Letter | Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420065040M | 10/23/06 | 03/07/07 | Notice of Amendment | Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420065041 | 10/23/06 | 01/12/10 | Proposed Civil Penalty Proposed Compliance Order |
Qualification of Pipeline Personnel - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $26,000 | $26,000 | $26,000 | Yes | |
520065023W | 06/02/06 | 06/02/06 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
420065026W | 05/31/06 | 05/31/06 | Warning Letter | Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
520065016M | 03/23/06 | 08/04/06 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | No | |||
520065017 | 03/23/06 | 11/16/09 | Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Damage Prevention - Hazardous Liquid Pipelines Incident Reports - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Public Awareness - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
420065002M | 01/06/06 | 06/07/06 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
420055037 | 10/11/05 | 02/09/07 | Proposed Civil Penalty | Integrity Management - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $200,000 | $200,000 | $200,000 | No | |
420055034 | 08/31/05 | 09/01/06 | Proposed Civil Penalty Proposed Compliance Order Warning Letter |
Construction - Hazardous Liquid Pipelines Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $12,000 | $12,000 | $12,000 | Yes | |
420055025M | 07/08/05 | 05/24/06 | Notice of Amendment | Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines |
SOUTHWEST | CLOSED | $0 | No | |||
320055015 | 03/14/05 | 10/28/10 | Proposed Civil Penalty Warning Letter |
Damage Prevention - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines Public Awareness - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $184,500 | $39,000 | $39,000 | No | |
320055008M | 02/02/05 | 12/18/08 | Notice of Amendment | Procedure Manuals - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | No | |||
520045036H | 11/24/04 | 04/18/08 | Corrective Action Order | |
WESTERN | CLOSED | $0 | No | |||
320045013 | 04/26/04 | 02/15/07 | Letter of Concern Notice of Amendment Proposed Civil Penalty |
Integrity Management - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $35,000 | $35,000 | $35,000 | Yes | |
520045009 | 03/22/04 | 04/18/08 | Letter of Concern Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Pressure Testing - Hazardous Liquid Pipelines |
WESTERN | CLOSED | $0 | Yes | |||
420035009H | 04/10/03 | 04/10/06 | Corrective Action Order | |
SOUTHWEST | CLOSED | $0 | No | |||
320035007 | 03/13/03 | 01/22/10 | Notice of Amendment Proposed Compliance Order Warning Letter |
Corrosion Control - Hazardous Liquid Pipelines Operations and Maintenance - Hazardous Liquid Pipelines Procedure Manuals - Hazardous Liquid Pipelines |
CENTRAL | CLOSED | $0 | Yes | |||
Totals | $1,929,100 | $1,203,200 | $1,203,200 |
Sources
- PHMSA Safety Monitoring and Reporting Tool (SMART)and the Work Management System as of September 6, 2023.
For comments and questions on the information presented on this site, please send us feedback.