PHMSA Pipeline Safety Program

Stakeholder Communications

Home General Public Local Officials State Regulators Federal Agencies Emergency Officials Advocates Industry Excavators

Site Pages

Pipeline Basics

Safety Standards

Inspection

Enforcement

Incident & Mileage Reports

Damage Prevention

Alternative Fuels

Community Assistance and Technical Services

Land Use Planning

Public Meetings

Public Awareness

Liquefied Natural Gas

Pipeline Library

Pipeline Glossary

Links

State-specific information:

Significant Pipeline Incidents By Cause

This report is a sub-report of the PHMSA Significant Pipeline Incidents report. As such, it represents Significant Incidents (A) only over the time period and pipeline system specified.

The data source for this table is the PHMSA Filtered Incident Files. (1) (2) (3)

More Pipeline Incidents and Mileage Reports are available.

National All Pipeline Systems: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 12 6.9% 0 2 $4,150,983 2.2%
CORROSION, INTERNAL 13 7.5% 0 0 $5,157,908 2.7%
Sub Total 25 14.4% 0 2 $9,308,891 4.9%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 7 4.0% 0 4 $908,231 0.4%
THIRD PARTY EXCAVATION DAMAGE 17 9.8% 0 4 $5,608,626 2.9%
Sub Total 24 13.8% 0 8 $6,516,857 3.4%
HUMAN ERROR
INCORRECT OPERATION 8 4.6% 0 1 $775,544 0.4%
Sub Total 8 4.6% 0 1 $775,544 0.4%
MATERIAL FAILURE
BODY OF PIPE 3 1.7% 0 0 $3,506,065 1.8%
BUTT WELD 3 1.7% 0 0 $638,058 0.3%
COMPONENT 8 4.6% 0 1 $6,958,034 3.6%
FILLET WELD 2 1.1% 0 0 $784,358 0.4%
JOINT 6 3.4% 0 0 $2,240,552 1.1%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 5 2.8% 0 0 $912,678 0.4%
PIPE SEAM WELD 4 2.3% 0 0 $4,203,477 2.2%
RUPTURED OR LEAKING SEAL/PUMP PACKING 5 2.8% 0 0 $1,179,211 0.6%
Sub Total 36 20.8% 0 1 $20,422,433 10.8%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 4 2.3% 0 0 $2,188,200 1.1%
HEAVY RAINS/FLOODS 3 1.7% 0 0 $867,660 0.4%
HIGH WINDS 5 2.8% 6 45 $105,641,385 56.0%
LIGHTNING 3 1.7% 0 0 $11,978,502 6.3%
TEMPERATURE 1 0.5% 0 0 $110,732 0.0%
Sub Total 16 9.2% 6 45 $120,786,479 64.0%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 15 8.6% 0 6 $9,255,064 4.9%
FIRE/EXPLOSION AS PRIMARY CAUSE 19 10.9% 0 0 $12,261,820 6.5%
VANDALISM 1 0.5% 0 3 $150,000 0.0%
Sub Total 35 20.2% 0 9 $21,666,884 11.4%
ALL OTHER CAUSES
MISCELLANEOUS 8 4.6% 1 4 $1,938,783 1.0%
UNKNOWN 21 12.1% 1 6 $7,139,903 3.7%
Sub Total 29 16.7% 2 10 $9,078,686 4.8%
Totals 173 100.0% 8 76 $188,555,774 100.0%
National, All Pipeline Systems, 2008 YTD
National Hazardous Liquid: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 7 10.7% 0 0 $2,472,434 7.4%
CORROSION, INTERNAL 8 12.3% 0 0 $2,399,208 7.2%
Sub Total 15 23.0% 0 0 $4,871,642 14.6%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 4 6.1% 0 1 $310,046 0.9%
THIRD PARTY EXCAVATION DAMAGE 7 10.7% 0 0 $1,136,930 3.4%
Sub Total 11 16.9% 0 1 $1,446,976 4.3%
HUMAN ERROR
INCORRECT OPERATION 4 6.1% 0 0 $296,693 0.8%
Sub Total 4 6.1% 0 0 $296,693 0.8%
MATERIAL FAILURE
BODY OF PIPE 2 3.0% 0 0 $3,318,565 9.9%
BUTT WELD 1 1.5% 0 0 $289,000 0.8%
COMPONENT 4 6.1% 0 0 $354,919 1.0%
FILLET WELD 2 3.0% 0 0 $784,358 2.3%
JOINT 5 7.6% 0 0 $1,712,552 5.1%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 3 4.6% 0 0 $178,595 0.5%
PIPE SEAM WELD 3 4.6% 0 0 $4,079,377 12.2%
RUPTURED OR LEAKING SEAL/PUMP PACKING 4 6.1% 0 0 $1,029,211 3.0%
Sub Total 24 36.9% 0 0 $11,746,577 35.3%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 1.5% 0 0 $572,000 1.7%
LIGHTNING 1 1.5% 0 0 $11,251,496 33.8%
TEMPERATURE 1 1.5% 0 0 $110,732 0.3%
Sub Total 3 4.6% 0 0 $11,934,228 35.8%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 1 1.5% 0 0 $29,100 0.0%
Sub Total 1 1.5% 0 0 $29,100 0.0%
ALL OTHER CAUSES
UNKNOWN 7 10.7% 0 0 $2,935,353 8.8%
Sub Total 7 10.7% 0 0 $2,935,353 8.8%
Totals 65 100.0% 0 1 $33,260,569 100.0%
National, Hazardous Liquid, 2008 YTD
National Hazardous Liquid Onshore: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 7 10.7% 0 0 $2,472,434 7.4%
CORROSION, INTERNAL 8 12.3% 0 0 $2,399,208 7.2%
Sub Total 15 23.0% 0 0 $4,871,642 14.6%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 4 6.1% 0 1 $310,046 0.9%
THIRD PARTY EXCAVATION DAMAGE 7 10.7% 0 0 $1,136,930 3.4%
Sub Total 11 16.9% 0 1 $1,446,976 4.3%
HUMAN ERROR
INCORRECT OPERATION 4 6.1% 0 0 $296,693 0.8%
Sub Total 4 6.1% 0 0 $296,693 0.8%
MATERIAL FAILURE
BODY OF PIPE 2 3.0% 0 0 $3,318,565 9.9%
BUTT WELD 1 1.5% 0 0 $289,000 0.8%
COMPONENT 4 6.1% 0 0 $354,919 1.0%
FILLET WELD 2 3.0% 0 0 $784,358 2.3%
JOINT 5 7.6% 0 0 $1,712,552 5.1%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 3 4.6% 0 0 $178,595 0.5%
PIPE SEAM WELD 3 4.6% 0 0 $4,079,377 12.2%
RUPTURED OR LEAKING SEAL/PUMP PACKING 4 6.1% 0 0 $1,029,211 3.0%
Sub Total 24 36.9% 0 0 $11,746,577 35.3%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 1.5% 0 0 $572,000 1.7%
LIGHTNING 1 1.5% 0 0 $11,251,496 33.8%
TEMPERATURE 1 1.5% 0 0 $110,732 0.3%
Sub Total 3 4.6% 0 0 $11,934,228 35.8%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 1 1.5% 0 0 $29,100 0.0%
Sub Total 1 1.5% 0 0 $29,100 0.0%
ALL OTHER CAUSES
UNKNOWN 7 10.7% 0 0 $2,935,353 8.8%
Sub Total 7 10.7% 0 0 $2,935,353 8.8%
Totals 65 100.0% 0 1 $33,260,569 100.0%
National, Hazardous Liquid Onshore, 2008 YTD

No Data Available

National Gas Transmission: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 2 6.2% 0 0 $989,214 0.9%
CORROSION, INTERNAL 2 6.2% 0 0 $1,668,700 1.6%
Sub Total 4 12.5% 0 0 $2,657,914 2.6%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 2 6.2% 0 0 $373,185 0.3%
THIRD PARTY EXCAVATION DAMAGE 2 6.2% 0 0 $343,983 0.3%
Sub Total 4 12.5% 0 0 $717,168 0.7%
HUMAN ERROR
INCORRECT OPERATION 1 3.1% 0 0 $100,000 0.1%
Sub Total 1 3.1% 0 0 $100,000 0.1%
MATERIAL FAILURE
BODY OF PIPE 1 3.1% 0 0 $187,500 0.1%
BUTT WELD 2 6.2% 0 0 $349,058 0.3%
COMPONENT 3 9.3% 0 1 $603,115 0.5%
JOINT 1 3.1% 0 0 $528,000 0.5%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 3.1% 0 0 $208,250 0.2%
PIPE SEAM WELD 1 3.1% 0 0 $124,100 0.1%
Sub Total 9 28.1% 0 1 $2,000,023 1.9%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 3.1% 0 0 $530,000 0.5%
HEAVY RAINS/FLOODS 1 3.1% 0 0 $522,000 0.5%
HIGH WINDS 2 6.2% 0 0 $85,170,000 83.7%
LIGHTNING 1 3.1% 0 0 $197,000 0.1%
Sub Total 5 15.6% 0 0 $86,419,000 85.0%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 3 9.3% 0 1 $7,823,592 7.6%
Sub Total 3 9.3% 0 1 $7,823,592 7.6%
ALL OTHER CAUSES
MISCELLANEOUS 3 9.3% 0 0 $1,044,849 1.0%
UNKNOWN 3 9.3% 0 0 $910,790 0.9%
Sub Total 6 18.7% 0 0 $1,955,639 1.9%
Totals 32 100.0% 0 2 $101,673,336 100.0%
National, Gas Transmission, 2008 YTD
National Gas Transmission Onshore: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 2 6.2% 0 0 $989,214 0.9%
Sub Total 2 6.2% 0 0 $989,214 0.9%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 2 6.2% 0 0 $373,185 0.3%
THIRD PARTY EXCAVATION DAMAGE 2 6.2% 0 0 $343,983 0.3%
Sub Total 4 12.5% 0 0 $717,168 0.7%
HUMAN ERROR
INCORRECT OPERATION 1 3.1% 0 0 $100,000 0.1%
Sub Total 1 3.1% 0 0 $100,000 0.1%
MATERIAL FAILURE
BODY OF PIPE 1 3.1% 0 0 $187,500 0.1%
BUTT WELD 2 6.2% 0 0 $349,058 0.3%
COMPONENT 3 9.3% 0 1 $603,115 0.5%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 3.1% 0 0 $208,250 0.2%
PIPE SEAM WELD 1 3.1% 0 0 $124,100 0.1%
Sub Total 8 25.0% 0 1 $1,472,023 1.4%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 3.1% 0 0 $530,000 0.5%
HEAVY RAINS/FLOODS 1 3.1% 0 0 $522,000 0.5%
HIGH WINDS 2 6.2% 0 0 $85,170,000 83.7%
LIGHTNING 1 3.1% 0 0 $197,000 0.1%
Sub Total 5 15.6% 0 0 $86,419,000 85.0%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 3 9.3% 0 1 $7,823,592 7.6%
Sub Total 3 9.3% 0 1 $7,823,592 7.6%
ALL OTHER CAUSES
MISCELLANEOUS 2 6.2% 0 0 $597,500 0.5%
UNKNOWN 3 9.3% 0 0 $910,790 0.9%
Sub Total 5 15.6% 0 0 $1,508,290 1.4%
Totals 28 87.5% 0 2 $99,029,287 97.4%
National, Gas Transmission Onshore, 2008 YTD
National Gas Transmission Offshore: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, INTERNAL 2 6.2% 0 0 $1,668,700 1.6%
Sub Total 2 6.2% 0 0 $1,668,700 1.6%
MATERIAL FAILURE
JOINT 1 3.1% 0 0 $528,000 0.5%
Sub Total 1 3.1% 0 0 $528,000 0.5%
ALL OTHER CAUSES
MISCELLANEOUS 1 3.1% 0 0 $447,349 0.4%
Sub Total 1 3.1% 0 0 $447,349 0.4%
Totals 4 12.5% 0 0 $2,644,049 2.6%
National, Gas Transmission Offshore, 2008 YTD
National Gas Gathering: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 1 20.0% 0 0 $574,335 7.4%
CORROSION, INTERNAL 3 60.0% 0 0 $1,090,000 14.2%
Sub Total 4 80.0% 0 0 $1,664,335 21.7%
MATERIAL FAILURE
COMPONENT 1 20.0% 0 0 $6,000,000 78.2%
Sub Total 1 20.0% 0 0 $6,000,000 78.2%
Totals 5 100.0% 0 0 $7,664,335 100.0%
National, Gas Gathering, 2008 YTD
National Gas Distribution: Significant Incident Details: 2008 YTD
Reported Cause of Incident Number % Fatalities Injuries Property Damage (B) (C) % of Property Damage
CORROSION
CORROSION, EXTERNAL 2 2.8% 0 2 $115,000 0.2%
Sub Total 2 2.8% 0 2 $115,000 0.2%
EXCAVATION DAMAGE
OPERATOR EXCAVATION DAMAGE 1 1.4% 0 3 $225,000 0.4%
THIRD PARTY EXCAVATION DAMAGE 8 11.2% 0 4 $4,127,713 8.9%
Sub Total 9 12.6% 0 7 $4,352,713 9.4%
HUMAN ERROR
INCORRECT OPERATION 3 4.2% 0 1 $378,851 0.8%
Sub Total 3 4.2% 0 1 $378,851 0.8%
MATERIAL FAILURE
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 1.4% 0 0 $525,833 1.1%
RUPTURED OR LEAKING SEAL/PUMP PACKING 1 1.4% 0 0 $150,000 0.3%
Sub Total 2 2.8% 0 0 $675,833 1.4%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 2.8% 0 0 $1,086,200 2.3%
HEAVY RAINS/FLOODS 2 2.8% 0 0 $345,660 0.7%
HIGH WINDS 3 4.2% 6 45 $20,471,385 44.5%
LIGHTNING 1 1.4% 0 0 $530,006 1.1%
Sub Total 8 11.2% 6 45 $22,433,251 48.8%
OTHER OUTSIDE FORCE DAMAGE
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... 11 15.4% 0 5 $1,402,372 3.0%
FIRE/EXPLOSION AS PRIMARY CAUSE 19 26.7% 0 0 $12,261,820 26.6%
VANDALISM 1 1.4% 0 3 $150,000 0.3%
Sub Total 31 43.6% 0 8 $13,814,192 30.0%
ALL OTHER CAUSES
MISCELLANEOUS 5 7.0% 1 4 $893,934 1.9%
UNKNOWN 11 15.4% 1 6 $3,293,760 7.1%
Sub Total 16 22.5% 2 10 $4,187,694 9.1%
Totals 71 100.0% 8 73 $45,957,534 100.0%
National, Gas Distribution, 2008 YTD

Notes

  1. Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion
  2. Costs in the current year (2008) are nominal (as reported). The costs for incidents prior to 2008 are presented in 2007 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
  3. For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2007 dollars. Costs in current year (2008) are nominal.

Sources

  1. PHMSA Hazardous Liquid Filtered Incidents File - August 25, 2008
  2. PHMSA Gas Transmission Filtered Incidents File - August 25, 2008
  3. PHMSA Gas Distribution Filtered Incidents File - August 25, 2008

See Pipeline Incidents and Mileage Reports for more pipeline safety reports.

Feedback | Information Highlights Directory | Privacy Policy | ©2005-2008 PHMSA | Generated: 08/26/08 04:38:41 PM