Phmsa Triskelion Logo United States Department of Transportation

Performance of Offshore Pipelines, a Joint Industry Project

Overview

Fast Facts

Project No. 89
Contract No. Unknown
Research Award Recipient Winmar Consulting Services
AOTR Empty Value
Researcher Contact Info 5700 Northwest Central Drive Suite 150 Houston, TX 77092 713-895-8240 win@winmarconsulting.com

Financial and Status Data

Project Status Closed
Start Fiscal Year 2000 (10/01/1999)
End Fiscal Year 2002 (09/30/2002)
PHMSA $$ Budgeted $175,000.00

Main Objective

This research and development project assessed the integrity of aging offshore pipeline systems by testing and validating the performance of "smart pigs" as tools to determine pipeline conditions on a number of abandoned offshore pipelines, field testing the pipelines to failure, and then comparing the failures with assessment models for predicting condition/failure.

Public Abstract

This research and development project assessed the integrity of aging offshore pipeline systems by testing and validating the performance of "smart pigs" as tools to determine pipeline conditions on a number of abandoned offshore pipelines, field testing the pipelines to failure, and then comparing the failures with assessment models for predicting condition/failure. The models that were validated through this assessment with the failures include the ASME B31.G, R-Streng and DNV RP501 models for pipelines along with other models identified by JIP participants.

Relevant Files & Links

Technical Reports and Documents

Projno89 FinalRpt 01 IntroSummary.pdf

Projno89_FinalRpt_01_IntroSummary.pdf

Projno89 FinalRpt 02 FieldTestPL25.pdf

Projno89_FinalRpt_02_FieldTestPL25.pdf

Projno89 FinalRpt 03 ResultsPL25.pdf

Projno89_FinalRpt_03_ResultsPL25.pdf

Projno89 FinalRpt 04 UCB Report 1.pdf

Projno89_FinalRpt_04_UCB_Report_1.pdf

Projno89 FinalRpt 05 UCB Report 2.pdf

Projno89_FinalRpt_05_UCB_Report_2.pdf

Projno89 FinalRpt 06 UCB Report 3.pdf

Projno89_FinalRpt_06_UCB_Report_3.pdf

Projno89 FinalRpt 07 UCB Report 4.pdf

Projno89_FinalRpt_07_UCB_Report_4.pdf

Projno89 FinalRpt 08 UCB Report 5.pdf

Projno89_FinalRpt_08_UCB_Report_5.pdf

Projno89 FinalRpt 09 UCB Report 6.pdf

Projno89_FinalRpt_09_UCB_Report_6.pdf

Projno89 FinalRpt 10 Section 7 StressPart2.pdf

Projno89_FinalRpt_10_Section_7_StressPart2.pdf

Projno89 FinalRpt 10 Section 7 StressPart 1.pdf

Projno89_FinalRpt_10_Section_7_StressPart_1.pdf

Projno89 FinalRpt 11 Section 8 KiefnerRpt.pdf

Projno89_FinalRpt_11_Section_8_KiefnerRpt.pdf

Projno89 FinalRpt 12 Section 9 ProgressMtg.pdf

Projno89_FinalRpt_12_Section_9_ProgressMtg.pdf