Overview
Project No. | 244 |
---|---|
Contract No. | DTPH56-08-T-000015 |
Research Award Recipient | DNV GL USA, Inc. 1400 Ravello Drive Katy, TX 77449 |
AOR | Huy Nguyen |
Researcher Contact Info | Oliver C Moghissi, PhD 614-761-1214 614-761-1633 oliver.moghissi@dnv.com |
Peer Review | Very Effective |
Project Status | Closed |
---|---|
Start Fiscal Year | 2008 (07/01/2008) |
End Fiscal Year | 2010 (12/31/2009) |
PHMSA $$ Budgeted | $211,760.00 |
Main Objective
The primary objective is to provide a simple tool to optimize determination of integrity reassessment intervals by more accurately predicting external corrosion rates that are 1) representative of a specific pipeline segment, 2) include distribution of corrosion rates as a function of location and time (allowing prediction of time-to-first-failure). Secondary objectives include 1) putting recently reported NIST data into a context that can be used by pipeline operators and 2) including the ability to allow reduction of predicted corrosion rate based on close-interval-survey and/or other data.
Public Abstract
External corrosion growth estimations are required for determining integrity reassessment intervals. Commonly utilized methods are presently limited because they a) do not adequately reflect local conditions of a specific pipeline segment, b) do not reflect corrosion rate distributions (arising from both the stochastic nature of corrosion and non-uniform soil conditions along a pipeline length), and/or c) do not consider the unsteady rate of corrosion over long periods.
The project objective is to provide a simple tool to optimize integrity reassessment intervals by more accurately predicting external corrosion rates that are 1) representative of a specific pipeline segment and 2) include distribution of corrosion rates (allowing prediction of time-to-first-failure).
Relevant Files & Links
Final Report
Final Report