Technical Reports and Documents
Direct Assessment - GRI Report # 98/0367.1, "Development of the B31.8 Code and Federal Pipeline Regulations: Implications for Today's Natural Gas Pipeline System. Volume 1: Technical Report."
PNNL Preliminary Assessment: Non-Destructive Testing (NDT) for Plastic Pipe
1992 Report: Pipe Failures and Analysis - ERW Seams
REMOTELY CONTROLLED VALVES ON INTERSTATE NATURAL GAS PIPELINES
Remotely_Controlled_Valves_on_Interstate_natural_gas_Pipelines_Sept_1999.pdf
Japan - Surface Cracking During Hydrogen Mechanical Testing from Muroran Research laboratory, Japan Steel Works.
ERW pipe failure report OPS 89-1from August 1989
Spike Hydrostatic Test Evaluation: Kiefner & Associates, July 2004: DTRS56-02-D-70036
TTO06_SpikeHydrostaticTestEvaluation_FinalReport_July2004.pdf
Standard Developing Organization Letters
Guidance to SDOs - 2014.pdf
SDO Sample Response Letter
Other Files
BSEE Formulating Guidance on Hydrotesting Deepwater Oil and Gas Pipelines
Contractor Tools
CAAP Annual Report Template
CAAP Annual Report Template Instruction
CAAP Final Report Template
CAAP Quarterly Report Template 2023.docx
Contractor User Guide (CAAP and CORE)
Contractor_User_Guide_-_PRIMIS_System_for_PHMSA_Research_2020-05-08.pdf
R&D Public Research Brief - Template and Guidance Document (CAAP & Core Programs)