U.S. Department 400 Seventh Street, S.W. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Muhrials Safety Administrafion Mr. Greg Bilinski Vice-President Texas Eastern Transmission Corporation 5400 Westheimer Court Houston, TX 77056 Re: CPF No. 2-2003- 10 18-H Dear Mr. Bilinski: The Associate Administrator for Pipeline Safety issued a Corrective Action Order on November 6, 2003 in the above-referenced case. As you know, the Order required Texas Eastern Transmission Corporation to take the necessary corrective action to protect the public and the environment from potential hazards associated with Linel5, a 30-inch pipeline, on your Kosciusko System in Kentucky. The Director, Southern Region, OPS has determined that all actions required by the Order are complete. Accordingly, this case is now closed. Thank you for your cooperation in our joint effort to ensure pipeline safety. Sincerely, ~ g e s Reynolds Pipeline Compliance Registry Office of Pipeline Safety cc: Linda Daugherty, Director, Southern Region, OPS CERTIFIED MAIL -RETURN RECEIPT REQUESTED