IA Desktop 3.1.3

Mar 14, 2015

Content

  1. The Gas Distribution protocol set has been revised to include all Form 2 updates and several new categories of “off form” content such as New DIMP Implementation (form 24)
  2. Control Room Management and Public Awareness. More details on these changes are provided below.

Application:

  1. A new feature allowing users to select the Presentation (groups and orders of questions) used has been added to assist IntrAstate users in organizing their inspections per the legacy forms.
  2. The demo filter has been changed to be no demos/all demos toggle, instead of an include/exclude demos approach.
  3. The task completion button now reads “Finish” instead of “Complete”, and the person and date are displayed when a task is finished.
  4. Requested items can be created for a specific question with one click.
  5. Screening results are included (and can be filtered) in the Notes Review

Other Changes:

  1. Now possible to copy/paste from locked inspections
  2. Attachment download fail message now contains more information
  3. Several errors related to database file lock timing are corrected
  4. Screening “Relevance” selector labels corrected to read “topics” instead of “modules”
  5. plan_pk missing error on navigation from reports issue is corrected
  6. Inspection names are displayed in the Supervisor’s Report for inspections the user does not have access to

Details on Gas Distribution Updates in 2015

  1. Overall content updated to reflect revisions to PHMSA Form 2 (Standard Inspection Report of a Gas Distribution Operator , Rev. 01/29/15). Note 1: The GD content is similar to the gas transmission content, as many of the code references are in common. The GD content, however, is limited to reflect the same scope as is covered on PHMSA Form 2. Note 2: PHMSA Form 2 updates included the elimination of several gas transmission topics that were previously included.
  2. New DIMP Implementation content added (PHMSA Form 24).
  3. New directives created for Operator Qualification, OQ Field Inspection, Public Awareness Program Effectiveness, and Control Room Management topics.
  4. Former BASE and UNIT presentations retired and replaced by a new INTRASTATE presentation applicable to intrastate gas distribution inspections.
  5. IA feedback item resolution changes from analogous gas transmission content updates carried over into applicable GD content, as applicable.