Baseline Study of Alternative In-Line Inspection Vehicles

Project Categories

Click on any category to see other projects in this category.

Main Objective

The purpose of this research is to conduct a baseline study of alternative ILI vehicles that might be able to negotiate unpiggable pipelines.

Public Abstract

The purpose of this research is to conduct a baseline study of alternative ILI vehicles that might be able to negotiate unpiggable pipelines. The researchers will: (1) document the status of unpiggable pipelines and mitigation options, (2) document designs of ILI devices being used in other industries, (3) identify options to inspect transmission and distribution lines, (4) document current ILI systems in the U.S. and abroad, and (5) summarize internal tool capability in other related industries (nuclear, water, plant production).

- Total Project Proposal $80,000.00.

Status History

Project initiated in October 2002. Project duration of 9 months.

Contract Documents
Projno110 CloseOut Oct07 2003 Public
Quarterly Status Reports
Projno110 1st Qrtrly Rpt Jan03 Public
Projno110 2nd Qtr Rpt May03 Public
Third-quarter, 2003, status report from Southwest Research Institute.
Technical Reports and Documents
Projno110 Final Oct03 Corrected