PHMSA Research and Development
Time: 11/23/2009 11:04 PM

Final Reports

Report Date File Name File Size Project Title / Research Entity
09/30/2009  File Type82673428_PHMSA_Final_DTPH56_07_T_000004_093009.pdf 7,035,662 Development of HAZ Hardness Limits for In-Service Welding (DNV Columbus)
07/22/2009  File TypeFinalReport.pdf 11,111,086 Improved In-field Welding and Coating Protocols (Gas Technology Institute)
06/16/2009  File TypeFinalReport_to__DOT_Rev1.pdf 1,637,387 Evaluation of Hydrogen Cracking in Weld Metal Deposited using Cellulosic Electrodes (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_5.pdf 2,340,613 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_6.pdf 3,831,837 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_7.pdf 311,541 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_2.pdf 231,328 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Tasks_3_and_4.pdf 1,163,924 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_1.pdf 5,562,127 Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/03/2009  File TypeIntegran_Tech_DTRT57-08-c-10070_final_report.pdf 255,579 Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.)
05/19/2009  File TypeComposite_Repair_PhI_Final_Report,_18May2009,_DTRT57-08-C-10068.pdf 4,712,468 New IN-Field Composite Repair Techniques for Transmission or Distribution Pipelines (Odyssian Technology LLC)
05/11/2009  File TypeFinal_Report-DTPH56-06-T-0009.pdf 213,135 Enhancing Direct Assessment with Remote Inspection through Coatings and Buried Regions (EMAT Ultrasonics Inc.)
04/27/2009  File TypeAPPENDIX_I.pdf 59,976 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_H.pdf 150,533 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_K.pdf 55,702 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_J.pdf 139,559 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_G.pdf 61,085 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_L.pdf 52,846 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_E.pdf 59,369 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_F.pdf 87,699 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_A.pdf 804,157 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File Type5637CFR_KSDB24Apr09.pdf 3,297,664 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_C.pdf 60,884 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_B.pdf 7,247,466 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_M.pdf 114,552 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_D.pdf 199,292 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_N.pdf 50,769 Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/24/2009  File TypeProject180.pdf 567,410 Steel Catenary Riser (SCR) Integrity Management (MCS Advanced Engineering Solutions)
04/21/2009  File TypeDOT_ROW_Sensor_report_4_21_09.pdf 1,539,959 Application of non-destructive evaluation techniques in pipeline inspection (Texas Transportation Institute)
03/27/2009  File TypeFinal_Report-Draft_Rev1.doc 6,106,112 Dissecting Coating Disbondments (DNV Columbus)
03/03/2009  File TypeDTRS56-05-T-0004_final-Rev1.pdf 3,083,243 Evaluation and Validation of Aboveground Techniques for Coating Condition Assessment (DNV Columbus)
02/20/2009  File TypePipeline%20inspection_debriefing%20slides.pdf 1,802,919 Innovative Safety and Reliability Technologies for Pipeline System Integrity and Management (Intelligent Automation, Inc.)
02/11/2009  File TypeUSDOT_DUAL_ARRAY_PROJECT_FINAL_REPORT_PUBLIC.pdf 900,515 Digital Mapping of Buried Pipelines with a Dual Array System (Witten Technologies, Inc.)
01/29/2009  File TypeENV-1REPORT_FINAL_REPORT_JAN_09_std1.pdf 9,324,335 Pipeline Integrity Management for Ground Movement Hazards (Pipeline Research Council International)
01/15/2009  File TypeDeliverables_Nov_2008_PDF.zip 2,913,031 Human Factors Analysis of Pipeline Monitoring and Control Operations (Battelle Memorial Institute)
10/01/2008  File TypeFinal_Report_DTPH56-06-T-000001_Proj_195_-_2008-08-31.pdf 19,427,722 Demonstration of ECDA Applicability and Reliability for Demanding Situations (Gas Technology Institute)
08/06/2008  File TypeFinal-ReportDoT_Phase_I__DTRT57-08-C-10022.pdf 1,855,974 Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.)
04/07/2008  File TypeDTRS56-05-T-0003__SCC_DFR_040708_.pdf 1,631,551 Model Modules to Assist Assessing and Controlling Stress Corrosion Cracking (SCC) (Battelle Memorial Institute)
04/07/2008  File TypeFinal_Report_-_Project_182.pdf 934,890 New Touch-Down Zone Solutions for Steel Catenary Risers (SCR) (Granherne-KBR)
01/18/2008  File Typefinal_report_11_07.pdf 2,587,334 MEIS System for Pipeline Coating Inspection (HD Laboratories, Inc.)
11/06/2007  File Type1474-TR-2247.pdf 7,878,986 Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.)
09/18/2007  File TypeFINAL_Tech_Report_-_Phase_1.pdf 2,142,369 Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility (Technology & Management Systems, Inc.)
09/18/2007  File TypeFINAL_Report_-_Phase_2_-_Stow_Burn.pdf 6,270,423 Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility (Technology & Management Systems, Inc.)
09/11/2007  File TypeNISTIR_7415_PL_Corro-Ricker.pdf 1,780,563 Task Order #1: External Corrosion of Line Pipe Steels (National Institute of Standards and Technology (NIST))
09/05/2007  File TypeProjno214_Solers_DOT_Final_Report-Public.pdf 134,820 Pipe Disbondment Detection and Coating Assessment Using the Dynamic Wavelet Fingerprinting Technique (Solers Inc.)
08/23/2007  File TypeFinal_Report_-_Project_161.pdf 1,095,528 Validation and enhancement of long range guided wave ultrasonic testing: A key technology for DA of buried pipelines (Northeast Gas Association)
08/15/2007  File Type47960GTH_Final_Report_8-15-2007.pdf 5,176,222 Optimizing Weld Integrity for X80 and X100 Linepipe (Edison Welding Institute, Inc.)
07/30/2007  File TypeDTRS56-03-T-0009_Final_Report.pdf 9,928,288 Advanced Welding Repair and Remediation Methods for In-service Pipelines (Edison Welding Institute, Inc.)
06/06/2007  File TypeDTRS56-05-T-0003_130_ECDA-FR.pdf 1,291,115 Applying External Corrosion Direct Assessment (ECDA) to Difficult to Inspect Areas (Battelle Memorial Institute)
06/04/2007  File TypeDOTFinal_Report_070531_final.pdf 5,841,265 High Resolution Electromagnetic Imaging and Decision Support for Pipeline Life Management Delivery (JENTEK Sensors Inc.)
05/30/2007  File TypeEmc2_-First_major_improvement_to_BTC_final_report_-full_document.pdf 8,774,528 First Major Improvements to the Two-curve Fracture Arrest Model (Engineering Mechanics Corporation of Columbus)
03/21/2007  File TypeProject_140_Final_Report.pdf 3,342,913 Strain-Based Design of Pipelines - Phase II (Edison Welding Institute, Inc.)
03/21/2007  File TypeProject_140_Final_Report_-_Appendix_A.pdf 65,186 Strain-Based Design of Pipelines - Phase II (Edison Welding Institute, Inc.)
03/19/2007  File TypeFinal Report - Hydrogen Measurement Probe.pdf 18,123,915 An Assessment of Magnetization Effects on Hydrogen Cracking for Thick-Walled Pipelines (Colorado School of Mines)
03/05/2007  File TypeRunningFracture-DFR.pdf 1,218,264 A New Approach to Control Running Fracture in Pipelines (Battelle Memorial Institute)
11/30/2006  File TypeProjno135_FinalReport_May_2004-Small-Public.pdf 6,804,940 Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.)
10/31/2006  File TypeF11027DOT-ExtendedWork.pdf 3,821,646 Determining Integrity Reassessment Intervals Through Corrosion Rate Modeling And Monitoring (Southwest Research Institute)
08/01/2006  File Type5666CFR_KS1Aug06.pdf 1,690,645 Validation of Sleeve Weld Integrity and Workmanship Limit Development (BMT Fleet Technology Limited)
08/01/2006  File Type5827CFR_KS1Aug06.pdf 2,058,483 Mechanical Damage at Welds (BMT Fleet Technology Limited)
07/07/2006  File TypeProjno118-Final-Report-Soils_Model-FR.pdf 1,141,668 Improvements to the External Corrosion Direct Assessment Methodology by Incorporating Soils Data (Battelle Memorial Institute)
06/09/2006  File TypeVOLPE_Final_Report.pdf 1,553,451 Feasibility of an Ultrasonic Based Instrument for Assessing In-Situ Pipeline Coatings (FBS, Inc.)
06/05/2006  File TypePipeline_inspection_final_debriefing6_6_06_rev1.pdf 1,854,806 In-Line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizontal Wave EMAT (Intelligent Automation, Inc.)
05/17/2006  File TypeDOT_SBIR_Pipeline_Monitoring_Final_Report.pdf 1,651,605 In-Line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizontal Wave EMAT (Intelligent Automation, Inc.)
03/29/2006  File TypeProjno125-Final_Report_Jan_31_2006.pdf 4,572,731 An Assessment of Magnetization Effects on Hydrogen Cracking for Thick-Walled Pipelines (Colorado School of Mines)
03/14/2006  File TypeFinalCorrosionCriteriaReport.pdf 2,623,320 Corrosion Assessment Criteria: Rationalizing Their Use Applied to Early vs Modern Pipelines (Battelle Memorial Institute)
02/24/2006  File Type01_-_02-46997GTH_Final_Report_-_Chapters_I_-_II.pdf 72,852 Improved Inspection and Assessment Methods for Pipeline Girth Welds and Repair Welds (Edison Welding Institute, Inc.)
02/06/2006  File TypeFR-RSPA-B-P020206revision.pdf 3,866,518 Emerging Padding and Related Pipeline Construction Practices (Battelle Memorial Institute)
01/02/2006  File TypeProjno111-Final-Report-12292005.pdf 705,227 Pipeline Damage Prevention Through the Use of Locatable Magnetic Plastic Pipe and a Universal Locator (Gas Technology Institute)
12/29/2005  File TypeProjno181-FinalReport.pdf 1,063,646 DW RUPE: Deepwater GOM Pipeline Damage Characteristics & Repair Options (Stress Engineering Services)
08/23/2005  File TypeProjNo137_Final_Rpt_June_04-Sm.pdf 6,773,779 Piezo Structural Acoustic Pipeline Leak Detection System (Midé Technology Corporation)
06/02/2005  File TypeProjno107_FinalReview2005-may-4.pdf 3,136,862 Mechanical Damage Inspection Using MFL Technology (Battelle Memorial Institute)
04/20/2005  File TypeRSPA-CrackGrowthAnalysis-FinalReport.pdf 1,904,784 Managing the Integrity of Early Pipelines (Battelle Memorial Institute)
03/31/2005  File TypeProjno156_Phase_I_Final_Report_2-7-05_V3_PRIVATE.pdf 2,242,412 Pipeline Integrity Process - Management/Audit System (PIPe-MAS) (AECsoft USA, Inc.)
01/26/2005  File TypeProjno115_Final_Jan05.pdf 291,315 Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus)
01/26/2005  File TypeProjno115_Final_Appendix_B_Jan05.pdf 12,787,737 Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus)
01/26/2005  File TypeProjno115_Final_Appendix_A_Jan05.pdf 4,424,217 Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus)
01/26/2005  File TypeProjno121_FinalReport_Nov2004.pdf 8,672,159 High CP Potential Effects on Pipelines (DNV Columbus)
01/19/2005  File TypeProjno122_FinalReport_011905.pdf 631,750 NoPig Metal-Loss Detection System for Non-Piggable Pipelines (FINO AG, Hildersheil Germany)
12/30/2004  File TypeProjno119_Final_Report_123004.pdf 4,685,973 Internal Corrosion Direct Assessment (ICDA) of Gas Transmission, Gathering, and Storage Systems (Southwest Research Institute)
10/06/2004  File TypeProjno124_Scandpower_Final_Report_Aug_04.pdf 2,185,705 An Assessment of Safety, Risks & Costs Associated with Subsea Pipeline Removals (Scandpower Risk Management, Inc.)
08/30/2004  File TypeProjno136_Final_Rpt_June_2004.pdf 677,072 Intrinsic Distributed Fiber Optic Leak Detection (Prime Research)
08/27/2004  File TypeProjNo_108_Final_Report_June04_Guidelines.pdf 1,675,496 Feasibility of In-Line Stress Measurement by Continuous Barkhausen Method (Southwest Research Institute)
PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA