| 09/30/2009 |
82673428_PHMSA_Final_DTPH56_07_T_000004_093009.pdf |
7,035,662 |
Development of HAZ Hardness Limits for In-Service Welding (DNV Columbus) |
| 07/22/2009 |
FinalReport.pdf |
11,111,086 |
Improved In-field Welding and Coating Protocols (Gas Technology Institute) |
| 06/16/2009 |
FinalReport_to__DOT_Rev1.pdf |
1,637,387 |
Evaluation of Hydrogen Cracking in Weld Metal Deposited using Cellulosic Electrodes (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Task_5.pdf |
2,340,613 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Task_6.pdf |
3,831,837 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Task_7.pdf |
311,541 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Task_2.pdf |
231,328 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Tasks_3_and_4.pdf |
1,163,924 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/09/2009 |
EWI_Project_No__47961GTH_Technical_Report_Task_1.pdf |
5,562,127 |
Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.) |
| 06/03/2009 |
Integran_Tech_DTRT57-08-c-10070_final_report.pdf |
255,579 |
Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.) |
| 05/19/2009 |
Composite_Repair_PhI_Final_Report,_18May2009,_DTRT57-08-C-10068.pdf |
4,712,468 |
New IN-Field Composite Repair Techniques for Transmission or Distribution Pipelines (Odyssian Technology LLC) |
| 05/11/2009 |
Final_Report-DTPH56-06-T-0009.pdf |
213,135 |
Enhancing Direct Assessment with Remote Inspection through Coatings and Buried Regions (EMAT Ultrasonics Inc.) |
| 04/27/2009 |
APPENDIX_I.pdf |
59,976 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_H.pdf |
150,533 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_K.pdf |
55,702 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_J.pdf |
139,559 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_G.pdf |
61,085 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_L.pdf |
52,846 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_E.pdf |
59,369 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_F.pdf |
87,699 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_A.pdf |
804,157 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
5637CFR_KSDB24Apr09.pdf |
3,297,664 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_C.pdf |
60,884 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_B.pdf |
7,247,466 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_M.pdf |
114,552 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_D.pdf |
199,292 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/27/2009 |
APPENDIX_N.pdf |
50,769 |
Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited) |
| 04/24/2009 |
Project180.pdf |
567,410 |
Steel Catenary Riser (SCR) Integrity Management (MCS Advanced Engineering Solutions) |
| 04/21/2009 |
DOT_ROW_Sensor_report_4_21_09.pdf |
1,539,959 |
Application of non-destructive evaluation techniques in pipeline inspection (Texas Transportation Institute) |
| 03/27/2009 |
Final_Report-Draft_Rev1.doc |
6,106,112 |
Dissecting Coating Disbondments (DNV Columbus) |
| 03/03/2009 |
DTRS56-05-T-0004_final-Rev1.pdf |
3,083,243 |
Evaluation and Validation of Aboveground Techniques for Coating Condition Assessment (DNV Columbus) |
| 02/20/2009 |
Pipeline%20inspection_debriefing%20slides.pdf |
1,802,919 |
Innovative Safety and Reliability Technologies for Pipeline System Integrity and Management (Intelligent Automation, Inc.) |
| 02/11/2009 |
USDOT_DUAL_ARRAY_PROJECT_FINAL_REPORT_PUBLIC.pdf |
900,515 |
Digital Mapping of Buried Pipelines with a Dual Array System (Witten Technologies, Inc.) |
| 01/29/2009 |
ENV-1REPORT_FINAL_REPORT_JAN_09_std1.pdf |
9,324,335 |
Pipeline Integrity Management for Ground Movement Hazards (Pipeline Research Council International) |
| 01/15/2009 |
Deliverables_Nov_2008_PDF.zip |
2,913,031 |
Human Factors Analysis of Pipeline Monitoring and Control Operations (Battelle Memorial Institute) |
| 10/01/2008 |
Final_Report_DTPH56-06-T-000001_Proj_195_-_2008-08-31.pdf |
19,427,722 |
Demonstration of ECDA Applicability and Reliability for Demanding Situations (Gas Technology Institute) |
| 08/06/2008 |
Final-ReportDoT_Phase_I__DTRT57-08-C-10022.pdf |
1,855,974 |
Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.) |
| 04/07/2008 |
DTRS56-05-T-0003__SCC_DFR_040708_.pdf |
1,631,551 |
Model Modules to Assist Assessing and Controlling Stress Corrosion Cracking (SCC) (Battelle Memorial Institute) |
| 04/07/2008 |
Final_Report_-_Project_182.pdf |
934,890 |
New Touch-Down Zone Solutions for Steel Catenary Risers (SCR) (Granherne-KBR) |
| 01/18/2008 |
final_report_11_07.pdf |
2,587,334 |
MEIS System for Pipeline Coating Inspection (HD Laboratories, Inc.) |
| 11/06/2007 |
1474-TR-2247.pdf |
7,878,986 |
Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.) |
| 09/18/2007 |
FINAL_Tech_Report_-_Phase_1.pdf |
2,142,369 |
Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility (Technology & Management Systems, Inc.) |
| 09/18/2007 |
FINAL_Report_-_Phase_2_-_Stow_Burn.pdf |
6,270,423 |
Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility (Technology & Management Systems, Inc.) |
| 09/11/2007 |
NISTIR_7415_PL_Corro-Ricker.pdf |
1,780,563 |
Task Order #1: External Corrosion of Line Pipe Steels (National Institute of Standards and Technology (NIST)) |
| 09/05/2007 |
Projno214_Solers_DOT_Final_Report-Public.pdf |
134,820 |
Pipe Disbondment Detection and Coating Assessment Using the Dynamic Wavelet Fingerprinting Technique (Solers Inc.) |
| 08/23/2007 |
Final_Report_-_Project_161.pdf |
1,095,528 |
Validation and enhancement of long range guided wave ultrasonic testing: A key technology for DA of buried pipelines (Northeast Gas Association) |
| 08/15/2007 |
47960GTH_Final_Report_8-15-2007.pdf |
5,176,222 |
Optimizing Weld Integrity for X80 and X100 Linepipe (Edison Welding Institute, Inc.) |
| 07/30/2007 |
DTRS56-03-T-0009_Final_Report.pdf |
9,928,288 |
Advanced Welding Repair and Remediation Methods for In-service Pipelines (Edison Welding Institute, Inc.) |
| 06/06/2007 |
DTRS56-05-T-0003_130_ECDA-FR.pdf |
1,291,115 |
Applying External Corrosion Direct Assessment (ECDA) to Difficult to Inspect Areas (Battelle Memorial Institute) |
| 06/04/2007 |
DOTFinal_Report_070531_final.pdf |
5,841,265 |
High Resolution Electromagnetic Imaging and Decision Support for Pipeline Life Management Delivery (JENTEK Sensors Inc.) |
| 05/30/2007 |
Emc2_-First_major_improvement_to_BTC_final_report_-full_document.pdf |
8,774,528 |
First Major Improvements to the Two-curve Fracture Arrest Model (Engineering Mechanics Corporation of Columbus) |
| 03/21/2007 |
Project_140_Final_Report.pdf |
3,342,913 |
Strain-Based Design of Pipelines - Phase II (Edison Welding Institute, Inc.) |
| 03/21/2007 |
Project_140_Final_Report_-_Appendix_A.pdf |
65,186 |
Strain-Based Design of Pipelines - Phase II (Edison Welding Institute, Inc.) |
| 03/19/2007 |
Final Report - Hydrogen Measurement Probe.pdf |
18,123,915 |
An Assessment of Magnetization Effects on Hydrogen Cracking for Thick-Walled Pipelines (Colorado School of Mines) |
| 03/05/2007 |
RunningFracture-DFR.pdf |
1,218,264 |
A New Approach to Control Running Fracture in Pipelines (Battelle Memorial Institute) |
| 11/30/2006 |
Projno135_FinalReport_May_2004-Small-Public.pdf |
6,804,940 |
Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.) |
| 10/31/2006 |
F11027DOT-ExtendedWork.pdf |
3,821,646 |
Determining Integrity Reassessment Intervals Through Corrosion Rate Modeling And Monitoring (Southwest Research Institute) |
| 08/01/2006 |
5666CFR_KS1Aug06.pdf |
1,690,645 |
Validation of Sleeve Weld Integrity and Workmanship Limit Development (BMT Fleet Technology Limited) |
| 08/01/2006 |
5827CFR_KS1Aug06.pdf |
2,058,483 |
Mechanical Damage at Welds (BMT Fleet Technology Limited) |
| 07/07/2006 |
Projno118-Final-Report-Soils_Model-FR.pdf |
1,141,668 |
Improvements to the External Corrosion Direct Assessment Methodology by Incorporating Soils Data (Battelle Memorial Institute) |
| 06/09/2006 |
VOLPE_Final_Report.pdf |
1,553,451 |
Feasibility of an Ultrasonic Based Instrument for Assessing In-Situ Pipeline Coatings (FBS, Inc.) |
| 06/05/2006 |
Pipeline_inspection_final_debriefing6_6_06_rev1.pdf |
1,854,806 |
In-Line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizontal Wave EMAT (Intelligent Automation, Inc.) |
| 05/17/2006 |
DOT_SBIR_Pipeline_Monitoring_Final_Report.pdf |
1,651,605 |
In-Line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizontal Wave EMAT (Intelligent Automation, Inc.) |
| 03/29/2006 |
Projno125-Final_Report_Jan_31_2006.pdf |
4,572,731 |
An Assessment of Magnetization Effects on Hydrogen Cracking for Thick-Walled Pipelines (Colorado School of Mines) |
| 03/14/2006 |
FinalCorrosionCriteriaReport.pdf |
2,623,320 |
Corrosion Assessment Criteria: Rationalizing Their Use Applied to Early vs Modern Pipelines (Battelle Memorial Institute) |
| 02/24/2006 |
01_-_02-46997GTH_Final_Report_-_Chapters_I_-_II.pdf |
72,852 |
Improved Inspection and Assessment Methods for Pipeline Girth Welds and Repair Welds (Edison Welding Institute, Inc.) |
| 02/06/2006 |
FR-RSPA-B-P020206revision.pdf |
3,866,518 |
Emerging Padding and Related Pipeline Construction Practices (Battelle Memorial Institute) |
| 01/02/2006 |
Projno111-Final-Report-12292005.pdf |
705,227 |
Pipeline Damage Prevention Through the Use of Locatable Magnetic Plastic Pipe and a Universal Locator (Gas Technology Institute) |
| 12/29/2005 |
Projno181-FinalReport.pdf |
1,063,646 |
DW RUPE: Deepwater GOM Pipeline Damage Characteristics & Repair Options (Stress Engineering Services) |
| 08/23/2005 |
ProjNo137_Final_Rpt_June_04-Sm.pdf |
6,773,779 |
Piezo Structural Acoustic Pipeline Leak Detection System (Midé Technology Corporation) |
| 06/02/2005 |
Projno107_FinalReview2005-may-4.pdf |
3,136,862 |
Mechanical Damage Inspection Using MFL Technology (Battelle Memorial Institute) |
| 04/20/2005 |
RSPA-CrackGrowthAnalysis-FinalReport.pdf |
1,904,784 |
Managing the Integrity of Early Pipelines (Battelle Memorial Institute) |
| 03/31/2005 |
Projno156_Phase_I_Final_Report_2-7-05_V3_PRIVATE.pdf |
2,242,412 |
Pipeline Integrity Process - Management/Audit System (PIPe-MAS) (AECsoft USA, Inc.) |
| 01/26/2005 |
Projno115_Final_Jan05.pdf |
291,315 |
Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus) |
| 01/26/2005 |
Projno115_Final_Appendix_B_Jan05.pdf |
12,787,737 |
Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus) |
| 01/26/2005 |
Projno115_Final_Appendix_A_Jan05.pdf |
4,424,217 |
Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (DNV Columbus) |
| 01/26/2005 |
Projno121_FinalReport_Nov2004.pdf |
8,672,159 |
High CP Potential Effects on Pipelines (DNV Columbus) |
| 01/19/2005 |
Projno122_FinalReport_011905.pdf |
631,750 |
NoPig Metal-Loss Detection System for Non-Piggable Pipelines (FINO AG, Hildersheil Germany) |
| 12/30/2004 |
Projno119_Final_Report_123004.pdf |
4,685,973 |
Internal Corrosion Direct Assessment (ICDA) of Gas Transmission, Gathering, and Storage Systems (Southwest Research Institute) |
| 10/06/2004 |
Projno124_Scandpower_Final_Report_Aug_04.pdf |
2,185,705 |
An Assessment of Safety, Risks & Costs Associated with Subsea Pipeline Removals (Scandpower Risk Management, Inc.) |
| 08/30/2004 |
Projno136_Final_Rpt_June_2004.pdf |
677,072 |
Intrinsic Distributed Fiber Optic Leak Detection (Prime Research) |
| 08/27/2004 |
ProjNo_108_Final_Report_June04_Guidelines.pdf |
1,675,496 |
Feasibility of In-Line Stress Measurement by Continuous Barkhausen Method (Southwest Research Institute) |