PHMSA Gas Transmission (GT) Integrity Management
Time: 05/21/2013 10:40 AM
Rule Section: §192.935
What additional preventive and mitigative measures must an operator take?
Rule Language:
Sections
(a) General Requirements.
(b) Third Party Damage and Outside Force Damage.
(c) Automatic shut-off valves (ASV) or Remote control valves (RCV).
(d) Pipelines operating below 30% SMYS.
(e) Plastic transmission pipeline.
Related Topics:
Related Protocol Questions:
H.01 General Requirements (Identification of Additional Measures)
H.06 Corrosion
PHMSA Home
|
Pipeline Safety Website
|
Feedback
|
Privacy Policy
|
FOIA