PHMSA Gas Transmission (GT) Integrity Management
Time: 05/24/2013 10:12 AM

Protocol Item I.02

I.02 Performance Measures Records Verification

Inspect operator records to verify: [§192.945(a)]

  1. The four overall performance measures of ASME B31.8S-2004, Section 9.4 have been submitted to PHMSA on a semi-annual basis in accordance with �192.951. Note: Initial report by August 31, 2004, semi-annual reports by February 28th (or 29th) and August 31st of each year thereafter. [�192.945(a)]

Related Rule Sections:

Related Topics:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA