Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]
Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.
Notes on protocols:Verify that the operator identifies and evaluates all potential threats to each covered pipeline segment. [§192.917(a)]
| C.01.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.01.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.01.b. If the operator is following the performance-based approach, verify that all 21 of the threats associated with the first nine failure categories listed above have been considered. [§192.917(a) and ASME B31.8S-2004, Section 2.2]
| C.01.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.01.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.01.c. Verify that the operator's threat identification has considered interactive threats from different categories (e.g., manufacturing defects activated by pressure cycling, corrosion accelerated by third party or outside force damage) [ASME B31.8S-2004, Section 2.2].
| C.01.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.01.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.01.d. Verify that the approach incorporates appropriate criteria for eliminating a specific threat for a particular pipeline segment. [ASME B31.8S-2004, Section 5.10]
| C.01.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.01.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.01 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| C.01 Inspection Notes |
|---|
Verify that the operator gathers and integrates existing data and information on the entire pipeline that could be relevant to covered segments, and verify that the necessary pipeline data have been assembled and integrated. [§192.917(b)]
C.02.a. Verify that the operator has in place a comprehensive plan for collecting, reviewing, and analyzing the data. [ASME B31.8S-2004, Section 4.2 and ASME B31.8S-2004, Section 4.4]
| C.02.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.02.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.02.c. Verify that the operator has utilized the data sources listed in ASME B31.8S-2004, Table 2, for initiation of the integrity management program. [ASME B31.8S-2004, Section 4.3]
| C.02.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.02.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.02.e. Verify that the operator's program includes measures to ensure that new information is incorporated in a timely and effective manner, as addressed in Protocol K. [§192.911(k), ASME B31.8S-2004, Section 11(b) and ASME B31.8S-2004, Section 11(d)]
| C.02.e. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.e. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.02.f. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.02.f. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.02 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| C.02 Inspection Notes |
|---|
Verify that the operator has conducted a risk assessment that follows ASME B31.8S-2004, Section 5, and that considers the identified threats for each covered segment. [§192.917(c)] [Note: Application of the risk assessment to prioritize the covered segments for the baseline assessment is covered in Protocol B, continual reassessments in Protocol F, and additional preventive and mitigative measures in Protocol H.]
| C.03.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.03.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.03.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.03.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.03.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.03.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.03.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.03.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
C.03.e. Verify that adequate time and personnel have been allocated to permit effective completion of the selected risk assessment approach. [ASME B31.8S-2004, Section 5.7(b)]
| C.03.e. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.03.e. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.03 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| C.03 Inspection Notes |
|---|
Verify that the integrity management program identifies and documents a process to validate the results of the risk assessments. [§192.917(c) and ASME B31.8S-2004, Section 5.12]
C.04.a. Verify that the validation process includes a check that the risk results are logical and consistent with the operator's and other industry experience. [§192.917(c) and ASME B31.8S-2004, Section 5.12]
| C.04.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.04.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.04 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| C.04 Inspection Notes |
|---|
If the operator has plastic transmission pipelines, verify that the operator assesses applicable threats to each covered segment of plastic line. [§192.917(d)]
C.05.a. If the operator has plastic transmission lines, verify that the information in ASME B31.8S-2004, Section 4 and ASME B31.8S-2004, Section 5, and any unique threats to the integrity of plastic pipe have been considered when assessing the threats to each covered segment of plastic pipeline. [§192.917(d)]
| C.05.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| C.05.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| C.05 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| C.05 Inspection Notes |
|---|