Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]
Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.
Notes on protocols:Verify that the operator's Baseline Assessment Plan (BAP) specifies an assessment method(s) for each covered segment that is best suited for identifying anomalies associated with specific threats identified for the segment. [§192.919(b), §192.921(a), §192.921(c), and §192.921(h)]
B.01.a. Verify that the operator followed ASME B31.8S-2004, Section 6.2 and that the assessment method selected for each covered segment addresses all of the threats identified for the segment. More than one assessment tool may be necessary to address all applicable threats to a covered segment. [§192.919(b), §192.921(a), §192.921(c), and §192.921(h)]
| B.01.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.01.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.01.c. If a pressure test is specified, verify that the test is required to be conducted in accordance with Part 192, Subpart J requirements. Verify that the operator followed ASME B31.8S-2004, Section 6.3 in selecting the pressure test as the appropriate assessment method. [§192.921(a)(2)]
| B.01.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.01.d. If the operator specifies the use of "other technology," verify that notification to PHMSA is required in accordance with Part 192.949, 180 days before conducting the assessment. Also, verify that notification to a State or local pipeline safety authority is required when either a covered segment is located in a State where PHMSA has an interstate agent agreement, or an intrastate covered segment is regulated by that State. [�192.921(a)(4)]
| B.01.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.01.e. If a covered pipeline segment contains low frequency electric resistance welded pipe (ERW) or lap welded pipe that satisfies the conditions specified in ASME B31.8S-2004, Appendix A4.3 and ASME B31.8S-2004, Appendix A4.4, and any covered or non-covered segment in the pipeline system with such pipe has experienced seam failure, or operating pressure on the covered segment has increased over the maximum operating pressure experienced during the preceding five years verify that the selected assessment method(s) are proven to be capable of assessing seam integrity and detecting seam corrosion anomalies. [§192.917(e)(4)]
| B.01.e. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.e. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.01.f. If the threat analysis required in §192.917(d) on a plastic transmission pipeline indicates that a covered segment is susceptible to failure from causes other than third-party damage, verify that the operator documents an acceptable justification for the use of an alternative assessment method that will address the identified threats to the covered segment. [§192.921(h)]
| B.01.f. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.01.f. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.01 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.01 Inspection Notes |
|---|
Verify that the BAP contains a schedule for completing the assessment activities for all covered segments; and that the BAP appropriately considered the applicable risk factors in the prioritization of the schedule. [§192.917(c), §192.919(c) and §192.921]
B.02.a. Verify that the BAP schedule includes all covered segments not already assessed. [§192.921(a)]
| B.02.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.02.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.02.b. Verify that the BAP schedule prioritizes the covered segments based on potential threats and applicable risk analysis, and that the risk ranking is appropriate. [§192.917(c) and §192.921(b)]
| B.02.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.02.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.02.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.02.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.02.d. Verify that the BAP schedule requires 50% of the covered segments, beginning with the highest risk segments, to be assessed by December 17, 2007; and that baseline assessments shall be completed for all covered segments by December 17, 2012. [�192.921(d)]
| B.02.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.02.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.02.e. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.02.e. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.02 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.02 Inspection Notes |
|---|
If prior assessments are used in the BAP, verify that the assessment methods used meet the requirements of §192.921(a) and that remedial actions have been carried out to address conditions listed in §192.933. Prior assessments are those that were completed prior to December 17, 2002. [§192.921(e)]
B.03.a. Verify that threats to these pipeline sections were identified as required under §192.919(a).
| B.03.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.03.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.03.b. Verify that the methods used for these prior assessments were appropriate for the threats per ANSI B31.8S-2001 as required under §192.919(b) and §192.919(d).
| B.03.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.03.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.03.c. Verify that anomalies satisfying the requirements of §192.933 were repaired.
| B.03.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.03.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.03 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.03 Inspection Notes |
|---|
Verify that the operator updates the baseline assessment plan for new HCAs and newly installed pipe. [§192.905(c), §192.921(f), §192.921(g)]
B.04.a. If new HCAs have been identified or new pipe has been installed that is covered by this subpart, verify that applicable segment(s) have been incorporated into the operator's baseline assessment plan within one year from the date the area or pipe is identified and assessments have been appropriately scheduled and/or completed. [§192.905(c)]
| B.04.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.04.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.04.b. For new HCAs, verify that the operator completes a baseline assessment for the applicable segment(s) within ten (10) years from the date the area is identified. [§192.921(f)]
| B.04.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.04.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.04.c. For newly installed pipe that is covered by this subpart and impacts an HCA, verify that the operator completes a baseline assessment within ten (10) years from the date the pipe is installed. [§192.921(g)]
| B.04.c. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.04.c. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.04.d. Verify that threats to these pipeline sections were identified as required under §192.919(a). [§192.921(b)]
| B.04.d. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.04.d. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
B.04.e. Verify that the assessment methods used were appropriate for the threats per ASME B31.8S-2004 as required under §192.919(b) and 192.919(d).
| B.04.e. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.04.e. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.04 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.04 Inspection Notes |
|---|
Verify that the operator addresses requirements for conducting the integrity assessments (baseline and reassessment) in a manner that minimizes environmental and safety risks. [§192.919(e) and §192.911(o)]
B.05.a. Verify that precautions were implemented to protect workers, members of the public, and the environment from safety hazards (such as an accidental release of gas) during assessments. [§192.919(e)and §192.911(o)]
| B.05.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.05.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.05 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.05 Inspection Notes |
|---|
Verify that the operator keeps the BAP up-to-date with respect to newly arising information. Also refer to Protocol K. [§192.911(k) and ASME B31.8S-2004, Section 11]
B.06.a. Verify that the operator's process has requirements to keep the BAP up-to-date with respect to newly arising information, applicable threats, and risks that may require changes to the segment prioritization or assessment method. [§192.911(k) & ASME B31.8S-2004, Section 11]
| B.06.a. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.06.a. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.06.b. Inspection Results Type an "X" in the applicable box below. Select only one. | |
|---|---|
| No Issues Identified | |
| Potential Issues Identified (explain in summary) | |
| Not Applicable (explain in summary) | |
| B.06.b. Inspection Issues Summary Leave blank if no issue was identified. |
|---|
| B.06 Documents Reviewed (Tab from bottom-right cell to add additional rows.) | |||
|---|---|---|---|
| Document Number | Rev | Date | Document Title |
| B.06 Inspection Notes |
|---|