PHMSA Gas Transmission (GT) Integrity Management
Time: 06/20/2013 10:50 AM

Protocol Area G. Confirmatory DA

Protocol:
 A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P 

G.01 Confirmatory Direct Assessment, CDA

If using confirmatory direct assessment (CDA) as allowed in §192.937, verify that the operator's integrity management plan meets the requirements of §192.931, §192.925 (ECDA) and §192.927 (ICDA). [§192.931]

[See Details...]

Explanation of Protocol Format

Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]

Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.

Notes on protocols: