PHMSA Gas Integrity Management
Time: 11/23/2009 09:28 PM

Notification Listing

Operator:Laclede Gas
Type:Program
Title:Change in Method for Determining HCA
Synopsis:

Operator changed from Method 1 to Method 2 for determining HCAs. Resulted in 26% recduction in HCA mileage.

Status: Acknowledged, States: MO
Response Basis:

PHMSA has received your notification of a change to your IM program. This information will be incorporated into PHMSA inspection planning.

ID:36
[List of Notifications...]
PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA