A.01 Program Requirements
Verify that the methods defined in §192.903 High Consequence Area (1) and/or §192.903 High Consequence Area (2) are applied to each pipeline for the identification of high consequence areas. [§192.905(a)]
A.03 Identified Sites
Verify that the operator's identification of identified sites includes the sources listed in §192.905(b) for those buildings or outside areas meeting the criteria specified by §192.903, and that the source of information selected is documented. [§192.903 Identified Sites, §192.905(b) and §192 Appendix E, I(c)]
A.06 Identification and Evaluation of Newly Identified HCAs, Program Requirements
Review the operator's integrity management program to verify processes are in place for evaluation of new information that may show that a pipeline segment impacts a high consequence area. [§192.905(c)]
P.01 Identification and Assessment of Newly Identified HCAs, Program Requirements
Refer to Protocol A.06
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |