PHMSA Gas Transmission (GT) Integrity Management
Time: 05/19/2013 02:58 AM

Topic: Notification

Topic Hierarchy:

Topical Index
 » Regulatory and External Interaction
   » Notification

Related Rule Sections:

Related Protocol Questions:

D.10 Wet Gas ICDA Programmatic Requirements

If the operator elects to use ICDA to assess a covered segment operating with electrolyte present in the gas stream (wet gas), verify that the operator develops and implements an ICDA plan in accordance with §192.927 which addresses the following. [§192.927(b)]

E.04 Record Review for Discovery, Repair and Remediation Activities

Inspect operator repair and remediation records to verify that remediation activities have been conducted in accordance with program requirements. [§192.933]

I.03 Exceptional Performance Measurements

For operators that choose to demonstrate exceptional performance in order to deviate from certain requirements of the rule, verify the following.

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA