Topic Hierarchy:

Topical Index
 » Threat/Risk Analysis
   » Specific Threats
     » ERW Pipe

Related Rule Sections:

Related Protocol Questions:

B.01 Assessment Methods

Verify that the operator's Baseline Assessment Plan (BAP) specifies an assessment method(s) for each covered segment that is best suited for identifying anomalies associated with specific threats identified for the segment. [§192.919(b), §192.921(a), §192.921(c), and §192.921(h)]

B.02 Prioritized Schedule

Verify that the BAP contains a schedule for completing the assessment activities for all covered segments; and that the BAP appropriately considered the applicable risk factors in the prioritization of the schedule. [§192.917(c), §192.919(c) and §192.921]