PHMSA Gas Transmission (GT) Integrity Management
Time: 09/02/2014 01:58 PM

Rule Section: §192.927(c)(3)(ii)

Additional excavation or assessment method.

Rule Hierarchy:

Rule Language:

as part of the operator's current integrity assessment either perform additional excavations in each covered segment within the ICDA region, or use an alternative assessment method allowed by this subpart to assess the line pipe in each covered segment within the ICDA region for internal corrosion; and

Related Topics:

Related Protocol Questions:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA