PHMSA Gas Transmission (GT) Integrity Management
Time: 10/31/2014 07:09 PM

Rule Section: §192.921(e)

Prior assessment.

Rule Hierarchy:

Rule Language:

An operator may use a prior integrity assessment conducted before December 17, 2002 as a baseline assessment for the covered segment, if the integrity assessment meets the baseline requirements in this subpart and subsequent remedial actions to address the conditions listed in 192.933 have been carried out. In addition, if an operator uses this prior assessment as its baseline assessment, the operator must reassess the line pipe in the covered segment according to the requirements of 192.937 and 192.939.

Related Topics:

Related Protocol Questions:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA