PHMSA Gas Transmission (GT) Integrity Management
Time: 10/23/2014 07:56 AM

Rule Section: §192.945(a)

General.

Rule Hierarchy:

Rule Language:

An operator must include in its integrity management program methods to measure, on a semi-annual basis, whether the program is effective in assessing and evaluating the integrity of each covered pipeline segment and in protecting the high consequence areas. These measures must include the four overall performance measures specified in ASME/ANSI B31.8S (ibr, see 192.7), section 9.4, and the specific measures for each identified threat specified in ASME/ANSI B31.8S, Appendix A. An operator must submit the four overall performance measures, by electronic or other means, on a semi-annual frequency to OPS in accordance with 192.951. An operator must submit its first report on overall performance measures by August 31, 2004. Thereafter, the performance measures must be complete through June 30 and December 31 of each year and must be submitted within 2 months after those dates.

Related Topics:

Related Protocol Questions:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA