If one of the conditions specified in paragraph (a)(1) or (a)(2) of this section applies, an operator may seek a waiver of the required reassessment interval. An operator must apply for a waiver in accordance with 49 U.S.C. 60118(c), at least 180 days before the end of the required reassessment interval, unless local product supply issues make the period impractical. If local product supply issues make the period impractical, an operator must apply for the waiver as soon as the need for the waiver becomes known.
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |