PHMSA Gas Transmission (GT) Integrity Management
Time: 11/23/2014 06:33 PM

Rule Section: §192.943(b)

How to apply.

Rule Hierarchy:

Rule Language:

If one of the conditions specified in paragraph (a)(1) or (a)(2) of this section applies, an operator may seek a waiver of the required reassessment interval. An operator must apply for a waiver in accordance with 49 U.S.C. 60118(c), at least 180 days before the end of the required reassessment interval, unless local product supply issues make the period impractical. If local product supply issues make the period impractical, an operator must apply for the waiver as soon as the need for the waiver becomes known.

Related Topics:

Related Protocol Questions:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA