PHMSA Gas Transmission (GT) Integrity Management
Time: 08/21/2014 04:01 PM

Rule Section: §192.937(c)(4)

Other technology.

Rule Hierarchy:

Rule Language:

Other technology that an operator demonstrates can provide an equivalent understanding of the condition of the line pipe. An operator choosing this option must notify the Office of Pipeline Safety (OPS) 180 days before conducting the assessment, in accordance with 192.949. An operator must also notify a State or local pipeline safety authority when either a covered segment is located in a State where OPS has an interstate agent agreement, or an intrastate covered segment is regulated by that State.

Related Topics:

Related Protocol Questions:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA