| Protocol Areas | Protocol A as Offline Form |
Protocol A as Offline Document |
Protocol A Outline |
«« First (A.01) |
« Previous (A.03) |
Next » (A.05) |
Last »» (P.01) |
If the operator's integrity management program relies on §192.903 High Consequence Area definition (1) for identification of high consequence areas, verify compliance with the following:
Verify the integrity management program includes Class 3 and Class 4 piping locations as high consequence areas consistent with the criteria of §192.5(b)(3), §192.5(b)(4), and §192.5(c). [§192.903 High Consequence Area (1)(i) and (ii)]
Verify the program includes as a high consequence area, any area in Class 1 and Class 2 piping locations where the potential impact circle contains an identified site. [§192.903 High Consequence Area (1)(iv)]
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol A as Offline Form |
|
Protocol A as Offline Document |
|
Protocol A Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |