PHMSA Gas Transmission (GT) Integrity Management
Time: 05/24/2013 01:21 PM

Protocol Item D.01

D.01 ECDA Programmatic Requirements

If the operator elects to use ECDA, verify that the operator develops and implements an ECDA plan in accordance with §192.925.

  1. Verify that the operator developed a documented ECDA plan, and developed procedures to implement the plan. [§192.925(b)]

Related Rule Sections:

Related Topics:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA