PHMSA Gas Transmission (GT) Integrity Management
Time: 07/30/2014 12:56 AM

Protocol Item I.03

I.03 Exceptional Performance Measurements

For operators that choose to demonstrate exceptional performance in order to deviate from certain requirements of the rule, verify the following.

  1. Additional performance measures beyond those required in 192.945 (see Protocol I.01) are part of the operator's performance plan. [192.913(b)(vii)]

  1. All performance measures (all measures required by �192.945 and the additional performance measures) are submitted to PHMSA on a semi-annual frequency in accordance with �192.951. [�192.913(b)(vii)]

Related Rule Sections:

Related Topics:

PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA