Verify that provisions exist to respond appropriately when the operator is unable to meet time limits for evaluation and remediation. [§192.933(a)].
Verify a requirement exists to document the justification, when an evaluation and a remediation activity cannot be completed within established timeframe requirements, that includes the reasons why the schedule cannot be met and the basis for why the changed schedule will not jeopardize public safety. [[§192.933(a) and §192.933(c)]
The notification is to include the documented justification under protocols E.03.a and E.03.b.
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol E as Offline Form |
|
Protocol E as Offline Document |
|
Protocol E Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |