| Protocol Areas | Protocol G as Offline Form |
Protocol G as Offline Document |
Protocol G Outline |
«« First (A.01) |
« Previous (F.06) |
Next » (H.01) |
Last »» (P.01) |
If using confirmatory direct assessment (CDA) as allowed in §192.937, verify that the operator's integrity management plan meets the requirements of §192.931, §192.925 (ECDA) and §192.927 (ICDA). [§192.931]
Verify that the operator's CDA plan for internal corrosion complies with all of the requirements contained in §192.927 (See Protocols D.6 ~ D.9) except that procedures for identifying locations for excavation may require excavation of only one high risk location in each ICDA region.[§192.931(c) and §192.925]
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol G as Offline Form |
|
Protocol G as Offline Document |
|
Protocol G Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |