Verify that the ECDA Pre-assessment process complies with ASME B31.8S-2004, Section 6.4 and NACE RP0502-2002 to (1) determine if ECDA is feasible for the pipeline to be evaluated, (2) identify ECDA regions and (3) select Indirect Inspection Tools. [§192.925(b)(1)]
Verify that the operator identifies and collects adequate data to support ECDA pre-assessment. [NACE RP0502-2002, Section 3.2]
Verify that the operator conducts an ECDA feasibility assessment by integrating and analyzing the data collected. [NACE RP0502-2002, Section 3.3]
Verify that the operator identifies ECDA Regions based on the use of data integration results applied to specified criteria. [NACE RP0502-2002, Section 3.5]
Verify that the operator applies more restrictive criteria when conducting ECDA for the first time on a covered segment. [§192.925(b)(1)(i)]
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol D as Offline Form |
|
Protocol D as Offline Document |
|
Protocol D Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |