Verify that the integrity management program meets the requirements of ASME B31.8S-2004, Section 11 for a management of change process. [§192.911(k)]
Verify the existence of procedures that consider impacts of changes to pipeline systems and their integrity. [ASME B31.8S-2004, Section 11(a)]
Verify change procedures address technical, physical, procedural, and organizational changes. [ASME B31.8S-2004, Section 11(a)]
Verify that integrity management system changes are properly reflected in the pipeline system and that pipeline system changes are properly reflected in the integrity management program. [ASME B31.8S-2004, Section 11(b)]
Verify that equipment or system changes have been identified and reviewed before implementation. [ASME B31.8S-2004, Section 11(d)]
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol K as Offline Form |
|
Protocol K as Offline Document |
|
Protocol K Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |