| Protocol Areas | Protocol F as Offline Form |
Protocol F as Offline Document |
Protocol F Outline |
«« First (A.01) |
« Previous (F.05) |
Next » (G.01) |
Last »» (P.01) |
Verify that the operator's program requires that it apply for a waiver, should it become necessary, from the required reassessment interval. The waiver request must demonstrate that the waiver is justified as specified in the rule. Such a waiver request may only be made in the following limited situations: [§192.943]
Lack of internal inspection tools. [§192.943(a)(1)]
Cannot maintain local product supply. [§192.943(a)(2)]
Application must be made at least 180 days before the end of the required reassessment interval. (Exception: If local product supply issues make the 180 day submittal impractical, an operator must apply for the waiver as soon as the need for waiver becomes known). [§192.943(b)]
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol F as Offline Form |
|
Protocol F as Offline Document |
|
Protocol F Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |