Verify that the operator updates the baseline assessment plan for new HCAs and newly installed pipe. [§192.905(c), §192.921(f), §192.921(g)]
If new HCAs have been identified or new pipe has been installed that is covered by this subpart, verify that applicable segment(s) have been incorporated into the operator's baseline assessment plan within one year from the date the area or pipe is identified and assessments have been appropriately scheduled and/or completed. [§192.905(c)]
For new HCAs, verify that the operator completes a baseline assessment for the applicable segment(s) within ten (10) years from the date the area is identified. [§192.921(f)]
For newly installed pipe that is covered by this subpart and impacts an HCA, verify that the operator completes a baseline assessment within ten (10) years from the date the pipe is installed. [§192.921(g)]
Verify that threats to these pipeline sections were identified as required under §192.919(a). [§192.921(b)]
Verify that the assessment methods used were appropriate for the threats per ASME B31.8S-2004 as required under §192.919(b) and 192.919(d).
| Inspections |
| Home Page |
| Library/Reference |
| FAQ |
| Key Documents |
| Protocols |
| Topical Index |
| Glossary |
| Rule Outline |
| This Page |
| Protocol Areas |
|
Protocol B as Offline Form |
|
Protocol B as Offline Document |
|
Protocol B Outline |
| Print-Friendly |
| My Pages |
| Questions and Comments |
| Log In... |