If the operator has plastic transmission pipelines, verify that the operator assesses applicable threats to each covered segment of plastic line. [§192.917(d)]
If the operator has plastic transmission lines, verify that the information in ASME B31.8S-2004, Section 4 and ASME B31.8S-2004, Section 5, and any unique threats to the integrity of plastic pipe have been considered when assessing the threats to each covered segment of plastic pipeline. [§192.917(d)]