PHMSA Gas Integrity Management Protocols

Explanation of Protocol Format

Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]

Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.

Notes on protocols:

Protocol Area M. Communications Plan

M.01 External and Internal Communication Requirements

Verify that an integrity management communication plan exists that meets the requirements of ASME B31.8S-2004, Section 10. [§192.911(m)]

M.01.a. Verify that the operator has submitted its API-1162 external communications plan to the PHMSA clearinghouse for approval.

M.01.b. Verify provisions for operator internal organizational communication exist to establish understanding of and support for the integrity management program. [ASME B31.8S-2004, Section 10.3]

M.02 Addressing Safety Concerns

Verify that provisions exist to address safety concerns raised by:

M.02.a. PHMSA and State or local pipeline safety authorities (when a covered segment is located in a State where PHMSA has an interstate agent agreement). [�192.911(m)(1) and �192.911(m)(2)].