National All Pipeline Systems: Significant Incident Details: 2012
Reported Cause of Incident (B) Number (C) % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 18 7.3% 0 2 $21,121,387 11.5%
INTERNAL CORROSION 42 17.2% 0 0 $29,706,348 16.2%
Sub Total 60 24.5% 0 2 $50,827,735 27.7%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 2 0.8% 0 0 $673,250 0.3%
THIRD PARTY EXCAVATION DAMAGE 21 8.6% 1 7 $13,050,432 7.1%
PREVIOUS DAMAGE DUE TO EXCAVATION 2 0.8% 0 4 $1,393,300 0.7%
Sub Total 25 10.2% 1 11 $15,116,982 8.2%
INCORRECT OPERATION
DAMAGE BY OPERATOR OR OPERATOR'S CONTRACTOR 2 0.8% 0 0 $193,160 0.1%
OVERFILL/OVERFLOW OF TANK/VESSEL/SUMP 2 0.8% 0 0 $211,136 0.1%
INCORRECT VALVE POSITION 2 0.8% 0 0 $222,031 0.1%
PIPELINE/EQUIPMENT OVERPRESSURED 2 0.8% 0 0 $1,795,402 0.9%
INCORRECT INSTALLATION 1 0.4% 0 0 $666,980 0.3%
OTHER INCORRECT OPERATION 8 3.2% 0 1 $1,012,534 0.5%
Sub Total 17 6.9% 0 1 $4,101,243 2.2%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 14 5.7% 0 0 $3,481,889 1.9%
MANUFACTURING-RELATED 10 4.1% 0 0 $13,782,521 7.5%
ENVIRONMENTAL CRACKING-RELATED 4 1.6% 0 0 $1,739,409 0.9%
OTHER PIPE/WELD/JOINT FAILURE 1 0.4% 0 1 $24,520 0.0%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 9 3.6% 0 1 $1,025,251 0.5%
PUMP/COMPRESSOR-RELATED EQUIPMENT 15 6.1% 0 1 $2,652,806 1.4%
THREADED CONNECTION/COUPLING FAILURE 9 3.6% 0 0 $2,162,780 1.1%
NON-THREADED CONNECTION FAILURE 12 4.9% 0 0 $5,830,866 3.1%
DEFECTIVE OR LOOSE TUBING/FITTING 3 1.2% 0 0 $595,597 0.3%
OTHER EQUIPMENT FAILURE 6 2.4% 0 0 $3,230,101 1.7%
Sub Total 83 34.0% 0 3 $34,525,740 18.8%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 3 1.2% 0 0 $2,058,843 1.1%
HEAVY RAINS/FLOODS 1 0.4% 0 0 $1,010,581 0.5%
LIGHTNING 3 1.2% 0 1 $1,306,195 0.7%
TEMPERATURE 2 0.8% 0 0 $278,748 0.1%
HIGH WINDS 1 0.4% 0 1 $750,036 0.4%
OTHER NATURAL FORCE DAMAGE 2 0.8% 1 1 $856,400 0.4%
Sub Total 12 4.9% 1 3 $6,260,803 3.4%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 12 4.9% 6 9 $4,153,837 2.2%
MARITIME EQUIPMENT OR VESSEL ADRIFT 1 0.4% 0 0 $96,700 0.0%
ELECTRICAL ARCING FROM OTHER EQUIPMENT/FACILITY 1 0.4% 0 0 $210,005 0.1%
PREVIOUS MECHANICAL DAMAGE 1 0.4% 0 0 $605,348 0.3%
INTENTIONAL DAMAGE 2 0.8% 1 2 $106,436 0.0%
OTHER OUTSIDE FORCE DAMAGE 4 1.6% 0 1 $26,381,215 14.3%
Sub Total 21 8.6% 7 12 $31,553,541 17.2%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 10 4.1% 0 17 $5,975,477 3.2%
UNKNOWN CAUSE 16 6.5% 1 6 $34,964,864 19.0%
Sub Total 26 10.6% 1 23 $40,940,341 22.3%
Totals 244 100.0% 10 55 $183,326,385 100.0%
National, All Pipeline Systems, 2012
National Hazardous Liquid: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 10 7.7% 0 0 $19,137,375 17.1%
INTERNAL CORROSION 24 18.6% 0 0 $22,899,040 20.5%
Sub Total 34 26.3% 0 0 $42,036,415 37.7%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 1 0.7% 0 0 $40,750 0.0%
THIRD PARTY EXCAVATION DAMAGE 6 4.6% 0 0 $3,658,127 3.2%
PREVIOUS DAMAGE DUE TO EXCAVATION 1 0.7% 0 0 $1,210,800 1.0%
Sub Total 8 6.2% 0 0 $4,909,677 4.4%
INCORRECT OPERATION
DAMAGE BY OPERATOR OR OPERATOR'S CONTRACTOR 2 1.5% 0 0 $193,160 0.1%
OVERFILL/OVERFLOW OF TANK/VESSEL/SUMP 2 1.5% 0 0 $211,136 0.1%
INCORRECT VALVE POSITION 2 1.5% 0 0 $222,031 0.2%
PIPELINE/EQUIPMENT OVERPRESSURED 2 1.5% 0 0 $1,795,402 1.6%
INCORRECT INSTALLATION 1 0.7% 0 0 $666,980 0.6%
OTHER INCORRECT OPERATION 4 3.1% 0 0 $588,800 0.5%
Sub Total 13 10.0% 0 0 $3,677,509 3.3%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 9 6.9% 0 0 $1,285,864 1.1%
MANUFACTURING-RELATED 6 4.6% 0 0 $11,144,749 10.0%
ENVIRONMENTAL CRACKING-RELATED 3 2.3% 0 0 $1,635,443 1.4%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 3 2.3% 0 0 $386,997 0.3%
PUMP/COMPRESSOR-RELATED EQUIPMENT 13 10.0% 0 0 $2,297,336 2.0%
THREADED CONNECTION/COUPLING FAILURE 6 4.6% 0 0 $388,103 0.3%
NON-THREADED CONNECTION FAILURE 10 7.7% 0 0 $3,960,900 3.5%
DEFECTIVE OR LOOSE TUBING/FITTING 3 2.3% 0 0 $595,597 0.5%
OTHER EQUIPMENT FAILURE 4 3.1% 0 0 $1,655,050 1.4%
Sub Total 57 44.1% 0 0 $23,350,039 20.9%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 0.7% 0 0 $174,800 0.1%
LIGHTNING 1 0.7% 0 0 $1,162,004 1.0%
TEMPERATURE 2 1.5% 0 0 $278,748 0.2%
Sub Total 4 3.1% 0 0 $1,615,552 1.4%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 2 1.5% 2 3 $2,874,437 2.5%
OTHER OUTSIDE FORCE DAMAGE 1 0.7% 0 0 $170,000 0.1%
Sub Total 3 2.3% 2 3 $3,044,437 2.7%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 3 2.3% 0 0 $3,186,125 2.8%
UNKNOWN CAUSE 7 5.4% 1 1 $29,480,163 26.4%
Sub Total 10 7.7% 1 1 $32,666,288 29.3%
Totals 129 100.0% 3 4 $111,299,917 100.0%
National, Hazardous Liquid, 2012
National Hazardous Liquid Onshore: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 9 6.9% 0 0 $18,907,370 16.9%
INTERNAL CORROSION 24 18.6% 0 0 $22,899,040 20.5%
Sub Total 33 25.5% 0 0 $41,806,410 37.5%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 1 0.7% 0 0 $40,750 0.0%
THIRD PARTY EXCAVATION DAMAGE 6 4.6% 0 0 $3,658,127 3.2%
PREVIOUS DAMAGE DUE TO EXCAVATION 1 0.7% 0 0 $1,210,800 1.0%
Sub Total 8 6.2% 0 0 $4,909,677 4.4%
INCORRECT OPERATION
DAMAGE BY OPERATOR OR OPERATOR'S CONTRACTOR 2 1.5% 0 0 $193,160 0.1%
OVERFILL/OVERFLOW OF TANK/VESSEL/SUMP 2 1.5% 0 0 $211,136 0.1%
INCORRECT VALVE POSITION 2 1.5% 0 0 $222,031 0.2%
PIPELINE/EQUIPMENT OVERPRESSURED 2 1.5% 0 0 $1,795,402 1.6%
INCORRECT INSTALLATION 1 0.7% 0 0 $666,980 0.6%
OTHER INCORRECT OPERATION 4 3.1% 0 0 $588,800 0.5%
Sub Total 13 10.0% 0 0 $3,677,509 3.3%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 9 6.9% 0 0 $1,285,864 1.1%
MANUFACTURING-RELATED 6 4.6% 0 0 $11,144,749 10.0%
ENVIRONMENTAL CRACKING-RELATED 3 2.3% 0 0 $1,635,443 1.4%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 3 2.3% 0 0 $386,997 0.3%
PUMP/COMPRESSOR-RELATED EQUIPMENT 13 10.0% 0 0 $2,297,336 2.0%
THREADED CONNECTION/COUPLING FAILURE 6 4.6% 0 0 $388,103 0.3%
NON-THREADED CONNECTION FAILURE 9 6.9% 0 0 $3,490,898 3.1%
DEFECTIVE OR LOOSE TUBING/FITTING 3 2.3% 0 0 $595,597 0.5%
OTHER EQUIPMENT FAILURE 4 3.1% 0 0 $1,655,050 1.4%
Sub Total 56 43.4% 0 0 $22,880,037 20.5%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 1 0.7% 0 0 $174,800 0.1%
LIGHTNING 1 0.7% 0 0 $1,162,004 1.0%
TEMPERATURE 2 1.5% 0 0 $278,748 0.2%
Sub Total 4 3.1% 0 0 $1,615,552 1.4%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 2 1.5% 2 3 $2,874,437 2.5%
Sub Total 2 1.5% 2 3 $2,874,437 2.5%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 3 2.3% 0 0 $3,186,125 2.8%
UNKNOWN CAUSE 7 5.4% 1 1 $29,480,163 26.4%
Sub Total 10 7.7% 1 1 $32,666,288 29.3%
Totals 126 97.6% 3 4 $110,429,910 99.2%
National, Hazardous Liquid Onshore, 2012
National Hazardous Liquid Offshore: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 1 0.7% 0 0 $230,005 0.2%
Sub Total 1 0.7% 0 0 $230,005 0.2%
MAT'L/WELD/EQUIP FAILURE
NON-THREADED CONNECTION FAILURE 1 0.7% 0 0 $470,002 0.4%
Sub Total 1 0.7% 0 0 $470,002 0.4%
OTHER OUTSIDE FORCE DAMAGE
OTHER OUTSIDE FORCE DAMAGE 1 0.7% 0 0 $170,000 0.1%
Sub Total 1 0.7% 0 0 $170,000 0.1%
Totals 3 2.3% 0 0 $870,007 0.7%
National, Hazardous Liquid Offshore, 2012
National Gas Transmission: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 6 9.8% 0 0 $1,834,612 3.6%
INTERNAL CORROSION 14 22.9% 0 0 $5,988,888 11.9%
Sub Total 20 32.7% 0 0 $7,823,500 15.5%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 1 1.6% 0 0 $632,500 1.2%
THIRD PARTY EXCAVATION DAMAGE 4 6.5% 0 2 $1,570,963 3.1%
Sub Total 5 8.2% 0 2 $2,203,463 4.3%
INCORRECT OPERATION
OTHER INCORRECT OPERATION 2 3.2% 0 0 $265,000 0.5%
Sub Total 2 3.2% 0 0 $265,000 0.5%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 5 8.2% 0 0 $2,196,025 4.3%
MANUFACTURING-RELATED 4 6.5% 0 0 $2,637,772 5.2%
ENVIRONMENTAL CRACKING-RELATED 1 1.6% 0 0 $103,966 0.2%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 4 6.5% 0 0 $533,254 1.0%
PUMP/COMPRESSOR-RELATED EQUIPMENT 2 3.2% 0 1 $355,470 0.7%
THREADED CONNECTION/COUPLING FAILURE 3 4.9% 0 0 $1,774,677 3.5%
NON-THREADED CONNECTION FAILURE 2 3.2% 0 0 $1,869,966 3.7%
OTHER EQUIPMENT FAILURE 2 3.2% 0 0 $1,575,051 3.1%
Sub Total 23 37.7% 0 1 $11,046,181 21.9%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 3.2% 0 0 $1,884,043 3.7%
Sub Total 2 3.2% 0 0 $1,884,043 3.7%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 1 1.6% 0 4 $56,960 0.1%
MARITIME EQUIPMENT OR VESSEL ADRIFT 1 1.6% 0 0 $96,700 0.1%
OTHER OUTSIDE FORCE DAMAGE 1 1.6% 0 0 $25,059,800 49.7%
Sub Total 3 4.9% 0 4 $25,213,460 50.0%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 4 6.5% 0 0 $1,077,903 2.1%
UNKNOWN CAUSE 2 3.2% 0 0 $831,760 1.6%
Sub Total 6 9.8% 0 0 $1,909,663 3.7%
Totals 61 100.0% 0 7 $50,345,310 100.0%
National, Gas Transmission, 2012
National Gas Transmission Onshore: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 4 6.5% 0 0 $1,253,237 2.4%
INTERNAL CORROSION 3 4.9% 0 0 $1,613,414 3.2%
Sub Total 7 11.4% 0 0 $2,866,651 5.6%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 1 1.6% 0 0 $632,500 1.2%
THIRD PARTY EXCAVATION DAMAGE 4 6.5% 0 2 $1,570,963 3.1%
Sub Total 5 8.2% 0 2 $2,203,463 4.3%
INCORRECT OPERATION
OTHER INCORRECT OPERATION 2 3.2% 0 0 $265,000 0.5%
Sub Total 2 3.2% 0 0 $265,000 0.5%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 4 6.5% 0 0 $1,020,414 2.0%
MANUFACTURING-RELATED 4 6.5% 0 0 $2,637,772 5.2%
ENVIRONMENTAL CRACKING-RELATED 1 1.6% 0 0 $103,966 0.2%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 4 6.5% 0 0 $533,254 1.0%
PUMP/COMPRESSOR-RELATED EQUIPMENT 2 3.2% 0 1 $355,470 0.7%
THREADED CONNECTION/COUPLING FAILURE 3 4.9% 0 0 $1,774,677 3.5%
NON-THREADED CONNECTION FAILURE 2 3.2% 0 0 $1,869,966 3.7%
OTHER EQUIPMENT FAILURE 2 3.2% 0 0 $1,575,051 3.1%
Sub Total 22 36.0% 0 1 $9,870,570 19.6%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 3.2% 0 0 $1,884,043 3.7%
Sub Total 2 3.2% 0 0 $1,884,043 3.7%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 1 1.6% 0 4 $56,960 0.1%
MARITIME EQUIPMENT OR VESSEL ADRIFT 1 1.6% 0 0 $96,700 0.1%
OTHER OUTSIDE FORCE DAMAGE 1 1.6% 0 0 $25,059,800 49.7%
Sub Total 3 4.9% 0 4 $25,213,460 50.0%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 4 6.5% 0 0 $1,077,903 2.1%
UNKNOWN CAUSE 2 3.2% 0 0 $831,760 1.6%
Sub Total 6 9.8% 0 0 $1,909,663 3.7%
Totals 47 77.0% 0 7 $44,212,850 87.8%
National, Gas Transmission Onshore, 2012
National Gas Transmission Offshore: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 2 3.2% 0 0 $581,375 1.1%
INTERNAL CORROSION 11 18.0% 0 0 $4,375,474 8.6%
Sub Total 13 21.3% 0 0 $4,956,849 9.8%
MAT'L/WELD/EQUIP FAILURE
CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED 1 1.6% 0 0 $1,175,611 2.3%
Sub Total 1 1.6% 0 0 $1,175,611 2.3%
Totals 14 22.9% 0 0 $6,132,460 12.1%
National, Gas Transmission Offshore, 2012
National Gas Gathering: Significant Incident Details: 2012
Reported Cause of Incident (B) Number % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
INTERNAL CORROSION 4 80.0% 0 0 $818,420 88.8%
Sub Total 4 80.0% 0 0 $818,420 88.8%
MAT'L/WELD/EQUIP FAILURE
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 20.0% 0 0 $102,500 11.1%
Sub Total 1 20.0% 0 0 $102,500 11.1%
Totals 5 100.0% 0 0 $920,920 100.0%
National, Gas Gathering, 2012
National Gas Distribution: Significant Incident Details: 2012
Reported Cause of Incident (B) Number (C) % Fatalities Injuries Property Damage (D) (E) % of Property Damage
CORROSION
EXTERNAL CORROSION 2 4.0% 0 2 $149,400 0.7%
Sub Total 2 4.0% 0 2 $149,400 0.7%
EXCAVATION DAMAGE
THIRD PARTY EXCAVATION DAMAGE 11 22.4% 1 5 $7,821,342 37.6%
PREVIOUS DAMAGE DUE TO EXCAVATION 1 2.0% 0 4 $182,500 0.8%
Sub Total 12 24.4% 1 9 $8,003,842 38.5%
INCORRECT OPERATION
OTHER INCORRECT OPERATION 2 4.0% 0 1 $158,734 0.7%
Sub Total 2 4.0% 0 1 $158,734 0.7%
MAT'L/WELD/EQUIP FAILURE
OTHER PIPE/WELD/JOINT FAILURE 1 2.0% 0 1 $24,520 0.1%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 2.0% 0 1 $2,500 0.0%
Sub Total 2 4.0% 0 2 $27,020 0.1%
NATURAL FORCE DAMAGE
HEAVY RAINS/FLOODS 1 2.0% 0 0 $1,010,581 4.8%
LIGHTNING 2 4.0% 0 1 $144,191 0.6%
HIGH WINDS 1 2.0% 0 1 $750,036 3.6%
OTHER NATURAL FORCE DAMAGE 2 4.0% 1 1 $856,400 4.1%
Sub Total 6 12.2% 1 3 $2,761,208 13.3%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 9 18.3% 4 2 $1,222,440 5.8%
ELECTRICAL ARCING FROM OTHER EQUIPMENT/FACILITY 1 2.0% 0 0 $210,005 1.0%
PREVIOUS MECHANICAL DAMAGE 1 2.0% 0 0 $605,348 2.9%
INTENTIONAL DAMAGE 2 4.0% 1 2 $106,436 0.5%
OTHER OUTSIDE FORCE DAMAGE 2 4.0% 0 1 $1,151,415 5.5%
Sub Total 15 30.6% 5 5 $3,295,644 15.8%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 3 6.1% 0 17 $1,711,449 8.2%
UNKNOWN CAUSE 7 14.2% 0 5 $4,652,941 22.4%
Sub Total 10 20.4% 0 22 $6,364,390 30.6%
Totals 49 100.0% 7 44 $20,760,238 100.0%
National, Gas Distribution, 2012

Notes

  1. Significant Incidents are those incidents reported by pipeline operators when any of the following conditions are met: 1) Fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) Highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) Liquid releases resulting in an unintentional fire or explosion. Serious incidents, a subset of Significant Incidents, are incidents which involve a fatality or injury requiring in-patient hospitalization.
  2. PHMSA has gathered increasingly targeted incident cause data over time. As such, the available reportable categories of cause (eg: Internal/External Corrosion vs Corrosion in general) have increased over time. This report spans time periods over which the reportable cause categories have changed. The cause categories in this report should be taken as general and not specific for years prior to 2002 for Liquid and Gas Transmission, and prior to 2004 for Gas Distribution.
  3. Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
  4. The costs for incidents prior to 2012 are presented in 2012 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
  5. For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report.

Sources

  1. PHMSA Flagged Incidents File - April 30, 2013. Note: Incidents occurring up to 30 days prior the Incident File source date may not appear in these reports due to the 30-day reporting period allowed by PHMSA regulation.

See Pipeline Incidents and Mileage Reports for more pipeline safety reports.

Feedback | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2013 PHMSA | DOT Home | PHMSA Home | PSA Forum | Generated: 05/02/13 09:03:32 PM