National All Pipeline Systems: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
24 |
9.2% |
1 |
2 |
$4,325,509 |
6.0% |
| INTERNAL CORROSION |
14 |
5.4% |
0 |
1 |
$1,790,504 |
2.5% |
| Sub Total |
38 | 14.6% | 1 | 3 | $6,116,013 | 8.5% |
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE |
10 |
3.8% |
0 |
3 |
$8,951,602 |
12.4% |
| THIRD PARTY EXCAVATION DAMAGE |
64 |
24.7% |
4 |
26 |
$15,138,027 |
21.1% |
| UNSPECIFIED EXCAVATION DAMAGE |
3 |
1.1% |
0 |
0 |
$1,112,219 |
1.5% |
| Sub Total |
77 | 29.7% | 4 | 29 | $25,201,849 | 35.1% |
| UNSPECIFIED INCORRECT OPERATION |
32 |
12.3% |
1 |
11 |
$2,729,712 |
3.8% |
| Sub Total |
32 | 12.3% | 1 | 11 | $2,729,712 | 3.8% |
| UNSPECIFIED PIPE BODY OR SEAM |
13 |
5.0% |
0 |
2 |
$5,269,421 |
7.3% |
| UNSPECIFIED WELD |
6 |
2.3% |
0 |
0 |
$385,938 |
0.5% |
| MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
3 |
1.1% |
0 |
0 |
$714,102 |
1.0% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
9 |
3.4% |
0 |
3 |
$3,416,704 |
4.7% |
| Sub Total |
31 | 11.9% | 0 | 5 | $9,786,167 | 13.6% |
| EARTH MOVEMENT |
9 |
3.4% |
0 |
3 |
$3,383,352 |
4.7% |
| HEAVY RAINS/FLOODS |
2 |
0.7% |
0 |
0 |
$14,055,113 |
19.6% |
| TEMPERATURE |
2 |
0.7% |
0 |
0 |
$940,892 |
1.3% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
11 |
4.2% |
0 |
0 |
$4,257,891 |
5.9% |
| Sub Total |
24 | 9.2% | 0 | 3 | $22,637,249 | 31.5% |
| UNSPECIFIED OUTSIDE FORCE DAMAGE |
2 |
0.7% |
2 |
0 |
$353,888 |
0.4% |
| Sub Total |
2 | 0.7% | 2 | 0 | $353,888 | 0.4% |
| MISCELLANEOUS CAUSE |
55 |
21.2% |
13 |
13 |
$4,863,525 |
6.7% |
| Sub Total |
55 | 21.2% | 13 | 13 | $4,863,525 | 6.7% |
| Totals |
259 |
100.0% |
21 |
64 |
$71,688,405 |
100.0% |
National Hazardous Liquid: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
20 |
12.8% |
0 |
0 |
$1,824,419 |
4.1% |
| INTERNAL CORROSION |
12 |
7.6% |
0 |
0 |
$1,459,086 |
3.2% |
| Sub Total |
32 | 20.5% | 0 | 0 | $3,283,505 | 7.3% |
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE |
7 |
4.4% |
0 |
0 |
$8,811,170 |
19.8% |
| THIRD PARTY EXCAVATION DAMAGE |
25 |
16.0% |
0 |
4 |
$4,442,179 |
9.9% |
| UNSPECIFIED EXCAVATION DAMAGE |
3 |
1.9% |
0 |
0 |
$1,112,219 |
2.5% |
| Sub Total |
35 | 22.4% | 0 | 4 | $14,365,569 | 32.3% |
| UNSPECIFIED INCORRECT OPERATION |
24 |
15.3% |
0 |
2 |
$1,199,006 |
2.7% |
| Sub Total |
24 | 15.3% | 0 | 2 | $1,199,006 | 2.7% |
| UNSPECIFIED PIPE BODY OR SEAM |
13 |
8.3% |
0 |
2 |
$5,269,421 |
11.8% |
| UNSPECIFIED WELD |
6 |
3.8% |
0 |
0 |
$385,938 |
0.8% |
| MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
3 |
1.9% |
0 |
0 |
$714,102 |
1.6% |
| Sub Total |
22 | 14.1% | 0 | 2 | $6,369,462 | 14.3% |
| HEAVY RAINS/FLOODS |
2 |
1.2% |
0 |
0 |
$14,055,113 |
31.6% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
8 |
5.1% |
0 |
0 |
$2,644,330 |
5.9% |
| Sub Total |
10 | 6.4% | 0 | 0 | $16,699,443 | 37.5% |
| MISCELLANEOUS CAUSE |
33 |
21.1% |
3 |
3 |
$2,531,656 |
5.7% |
| Sub Total |
33 | 21.1% | 3 | 3 | $2,531,656 | 5.7% |
| Totals |
156 |
100.0% |
3 |
11 |
$44,448,643 |
100.0% |
National Hazardous Liquid Onshore: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
20 |
12.8% |
0 |
0 |
$1,824,419 |
4.1% |
| INTERNAL CORROSION |
12 |
7.6% |
0 |
0 |
$1,459,086 |
3.2% |
| Sub Total |
32 | 20.5% | 0 | 0 | $3,283,505 | 7.3% |
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE |
7 |
4.4% |
0 |
0 |
$8,811,170 |
19.8% |
| THIRD PARTY EXCAVATION DAMAGE |
25 |
16.0% |
0 |
4 |
$4,442,179 |
9.9% |
| UNSPECIFIED EXCAVATION DAMAGE |
2 |
1.2% |
0 |
0 |
$831,356 |
1.8% |
| Sub Total |
34 | 21.7% | 0 | 4 | $14,084,706 | 31.6% |
| UNSPECIFIED INCORRECT OPERATION |
24 |
15.3% |
0 |
2 |
$1,199,006 |
2.7% |
| Sub Total |
24 | 15.3% | 0 | 2 | $1,199,006 | 2.7% |
| UNSPECIFIED PIPE BODY OR SEAM |
13 |
8.3% |
0 |
2 |
$5,269,421 |
11.8% |
| UNSPECIFIED WELD |
6 |
3.8% |
0 |
0 |
$385,938 |
0.8% |
| MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
3 |
1.9% |
0 |
0 |
$714,102 |
1.6% |
| Sub Total |
22 | 14.1% | 0 | 2 | $6,369,462 | 14.3% |
| HEAVY RAINS/FLOODS |
2 |
1.2% |
0 |
0 |
$14,055,113 |
31.6% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
8 |
5.1% |
0 |
0 |
$2,644,330 |
5.9% |
| Sub Total |
10 | 6.4% | 0 | 0 | $16,699,443 | 37.5% |
| MISCELLANEOUS CAUSE |
32 |
20.5% |
3 |
3 |
$1,829,497 |
4.1% |
| Sub Total |
32 | 20.5% | 3 | 3 | $1,829,497 | 4.1% |
| Totals |
154 |
98.7% |
3 |
11 |
$43,465,620 |
97.7% |
National Hazardous Liquid Offshore: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| UNSPECIFIED EXCAVATION DAMAGE |
1 |
0.6% |
0 |
0 |
$280,863 |
0.6% |
| Sub Total |
1 | 0.6% | 0 | 0 | $280,863 | 0.6% |
| MISCELLANEOUS CAUSE |
1 |
0.6% |
0 |
0 |
$702,158 |
1.5% |
| Sub Total |
1 | 0.6% | 0 | 0 | $702,158 | 1.5% |
| Totals |
2 |
1.2% |
0 |
0 |
$983,022 |
2.2% |
National Gas Transmission: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
1 |
3.1% |
0 |
0 |
$2,457,555 |
18.8% |
| INTERNAL CORROSION |
1 |
3.1% |
0 |
0 |
$317,375 |
2.4% |
| Sub Total |
2 | 6.2% | 0 | 0 | $2,774,931 | 21.2% |
| THIRD PARTY EXCAVATION DAMAGE |
8 |
25.0% |
0 |
2 |
$2,470,194 |
18.9% |
| Sub Total |
8 | 25.0% | 0 | 2 | $2,470,194 | 18.9% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
7 |
21.8% |
0 |
0 |
$3,416,704 |
26.1% |
| Sub Total |
7 | 21.8% | 0 | 0 | $3,416,704 | 26.1% |
| EARTH MOVEMENT |
3 |
9.3% |
0 |
0 |
$1,712,214 |
13.1% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
3 |
9.3% |
0 |
0 |
$1,613,560 |
12.3% |
| Sub Total |
6 | 18.7% | 0 | 0 | $3,325,775 | 25.4% |
| MISCELLANEOUS CAUSE |
9 |
28.1% |
2 |
5 |
$1,074,302 |
8.2% |
| Sub Total |
9 | 28.1% | 2 | 5 | $1,074,302 | 8.2% |
| Totals |
32 |
100.0% |
2 |
7 |
$13,061,909 |
100.0% |
National Gas Transmission Onshore: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
1 |
3.1% |
0 |
0 |
$2,457,555 |
18.8% |
| Sub Total |
1 | 3.1% | 0 | 0 | $2,457,555 | 18.8% |
| THIRD PARTY EXCAVATION DAMAGE |
5 |
15.6% |
0 |
2 |
$1,697,820 |
13.0% |
| Sub Total |
5 | 15.6% | 0 | 2 | $1,697,820 | 13.0% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
5 |
15.6% |
0 |
0 |
$2,707,524 |
20.7% |
| Sub Total |
5 | 15.6% | 0 | 0 | $2,707,524 | 20.7% |
| EARTH MOVEMENT |
2 |
6.2% |
0 |
0 |
$335,982 |
2.5% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
2 |
6.2% |
0 |
0 |
$1,220,352 |
9.3% |
| Sub Total |
4 | 12.5% | 0 | 0 | $1,556,335 | 11.9% |
| MISCELLANEOUS CAUSE |
7 |
21.8% |
0 |
5 |
$709,180 |
5.4% |
| Sub Total |
7 | 21.8% | 0 | 5 | $709,180 | 5.4% |
| Totals |
22 |
68.7% |
0 |
7 |
$9,128,415 |
69.8% |
National Gas Transmission Offshore: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| INTERNAL CORROSION |
1 |
3.1% |
0 |
0 |
$317,375 |
2.4% |
| Sub Total |
1 | 3.1% | 0 | 0 | $317,375 | 2.4% |
| THIRD PARTY EXCAVATION DAMAGE |
3 |
9.3% |
0 |
0 |
$772,374 |
5.9% |
| Sub Total |
3 | 9.3% | 0 | 0 | $772,374 | 5.9% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
2 |
6.2% |
0 |
0 |
$709,180 |
5.4% |
| Sub Total |
2 | 6.2% | 0 | 0 | $709,180 | 5.4% |
| EARTH MOVEMENT |
1 |
3.1% |
0 |
0 |
$1,376,231 |
10.5% |
| UNSPECIFIED NATURAL FORCE DAMAGE |
1 |
3.1% |
0 |
0 |
$393,208 |
3.0% |
| Sub Total |
2 | 6.2% | 0 | 0 | $1,769,440 | 13.5% |
| MISCELLANEOUS CAUSE |
2 |
6.2% |
2 |
0 |
$365,122 |
2.8% |
| Sub Total |
2 | 6.2% | 2 | 0 | $365,122 | 2.8% |
| Totals |
10 |
31.2% |
2 |
0 |
$3,933,493 |
30.1% |
National Gas Gathering: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| INTERNAL CORROSION |
1 |
33.3% |
0 |
1 |
$14,043 |
8.3% |
| Sub Total |
1 | 33.3% | 0 | 1 | $14,043 | 8.3% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
1 |
33.3% |
0 |
2 |
$0 |
0.0% |
| Sub Total |
1 | 33.3% | 0 | 2 | $0 | 0.0% |
| MISCELLANEOUS CAUSE |
1 |
33.3% |
0 |
0 |
$154,474 |
91.6% |
| Sub Total |
1 | 33.3% | 0 | 0 | $154,474 | 91.6% |
| Totals |
3 |
100.0% |
0 |
3 |
$168,518 |
100.0% |
National Gas Distribution: Significant Incident Details: 1995
| Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
| EXTERNAL CORROSION |
3 |
4.4% |
1 |
2 |
$43,533 |
0.3% |
| Sub Total |
3 | 4.4% | 1 | 2 | $43,533 | 0.3% |
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE |
3 |
4.4% |
0 |
3 |
$140,431 |
1.0% |
| THIRD PARTY EXCAVATION DAMAGE |
31 |
45.5% |
4 |
20 |
$8,225,652 |
58.7% |
| Sub Total |
34 | 50.0% | 4 | 23 | $8,366,084 | 59.7% |
| UNSPECIFIED INCORRECT OPERATION |
8 |
11.7% |
1 |
9 |
$1,530,706 |
10.9% |
| Sub Total |
8 | 11.7% | 1 | 9 | $1,530,706 | 10.9% |
| UNSPECIFIED MAT'L/WELD/EQUIP FAILURE |
1 |
1.4% |
0 |
1 |
$0 |
0.0% |
| Sub Total |
1 | 1.4% | 0 | 1 | $0 | 0.0% |
| EARTH MOVEMENT |
6 |
8.8% |
0 |
3 |
$1,671,137 |
11.9% |
| TEMPERATURE |
2 |
2.9% |
0 |
0 |
$940,892 |
6.7% |
| Sub Total |
8 | 11.7% | 0 | 3 | $2,612,030 | 18.6% |
| UNSPECIFIED OUTSIDE FORCE DAMAGE |
2 |
2.9% |
2 |
0 |
$353,888 |
2.5% |
| Sub Total |
2 | 2.9% | 2 | 0 | $353,888 | 2.5% |
| MISCELLANEOUS CAUSE |
12 |
17.6% |
8 |
5 |
$1,103,091 |
7.8% |
| Sub Total |
12 | 17.6% | 8 | 5 | $1,103,091 | 7.8% |
| Totals |
68 |
100.0% |
16 |
43 |
$14,009,335 |
100.0% |
Notes
- Significant Incidents are those incidents reported by pipeline operators when any of the following conditions are met: 1) Fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) Highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) Liquid releases resulting in an unintentional fire or explosion. Serious incidents, a subset of Significant Incidents, are incidents which involve a fatality or injury requiring in-patient hospitalization.
- PHMSA has gathered increasingly targeted incident cause data over time. As such, the available reportable categories of cause (eg: Internal/External Corrosion vs Corrosion in general) have increased over time. This report spans time periods over which the reportable cause categories have changed. The cause categories in this report should be taken as general and not specific for years prior to 2002 for Liquid and Gas Transmission, and prior to 2004 for Gas Distribution.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs for incidents prior to 2012 are presented in 2012 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report.
Sources
- PHMSA Flagged Incidents File - May 31, 2013. Note: Incidents occurring up to 30 days prior the Incident File source date may not appear in these reports due to the 30-day reporting period allowed by PHMSA regulation.
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.