| Reported Cause of Incident (B) | Number (C) | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| CORROSION | ||||||
| EXTERNAL CORROSION | 2 | 5.8% | 1 | 2 | $41,700 | 0.6% |
| Sub Total | 2 | 5.8% | 1 | 2 | $41,700 | 0.6% |
| EXCAVATION DAMAGE | ||||||
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE | 1 | 2.9% | 0 | 6 | $88,904 | 1.2% |
| THIRD PARTY EXCAVATION DAMAGE | 6 | 17.6% | 2 | 10 | $1,315,561 | 18.9% |
| Sub Total | 7 | 20.5% | 2 | 16 | $1,404,465 | 20.2% |
| INCORRECT OPERATION | ||||||
| OTHER INCORRECT OPERATION | 4 | 11.7% | 0 | 4 | $1,416,544 | 20.4% |
| Sub Total | 4 | 11.7% | 0 | 4 | $1,416,544 | 20.4% |
| MAT'L/WELD/EQUIP FAILURE | ||||||
| BODY OF PIPE | 2 | 5.8% | 1 | 7 | $531,082 | 7.6% |
| MALFUNCTION OF CONTROL/RELIEF EQUIPMENT | 1 | 2.9% | 0 | 1 | $47,245 | 0.6% |
| OTHER EQUIPMENT FAILURE | 1 | 2.9% | 1 | 1 | $0 | 0.0% |
| Sub Total | 4 | 11.7% | 2 | 9 | $578,327 | 8.3% |
| OTHER OUTSIDE FORCE DAMAGE | ||||||
| VEHICLE NOT ENGAGED IN EXCAVATION | 4 | 11.7% | 1 | 4 | $144,017 | 2.0% |
| ELECTRICAL ARCING FROM OTHER EQUIPMENT/FACILITY | 1 | 2.9% | 0 | 2 | $511,500 | 7.3% |
| OTHER OUTSIDE FORCE DAMAGE | 1 | 2.9% | 0 | 1 | $2,076 | 0.0% |
| Sub Total | 6 | 17.6% | 1 | 7 | $657,593 | 9.4% |
| ALL OTHER CAUSES | ||||||
| MISCELLANEOUS CAUSE | 4 | 11.7% | 0 | 4 | $10,890 | 0.1% |
| UNKNOWN CAUSE | 7 | 20.5% | 6 | 13 | $2,823,621 | 40.7% |
| Sub Total | 11 | 32.3% | 6 | 17 | $2,834,511 | 40.8% |
| Totals | 34 | 100.0% | 12 | 55 | $6,933,140 | 100.0% |
| Reported Cause of Incident (B) | Number | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| MAT'L/WELD/EQUIP FAILURE | ||||||
| OTHER EQUIPMENT FAILURE | 1 | 50.0% | 1 | 1 | $0 | 0.0% |
| Sub Total | 1 | 50.0% | 1 | 1 | $0 | 0.0% |
| ALL OTHER CAUSES | ||||||
| MISCELLANEOUS CAUSE | 1 | 50.0% | 0 | 1 | $10,500 | 100.0% |
| Sub Total | 1 | 50.0% | 0 | 1 | $10,500 | 100.0% |
| Totals | 2 | 100.0% | 1 | 2 | $10,500 | 100.0% |
| Reported Cause of Incident (B) | Number | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| MAT'L/WELD/EQUIP FAILURE | ||||||
| OTHER EQUIPMENT FAILURE | 1 | 50.0% | 1 | 1 | $0 | 0.0% |
| Sub Total | 1 | 50.0% | 1 | 1 | $0 | 0.0% |
| ALL OTHER CAUSES | ||||||
| MISCELLANEOUS CAUSE | 1 | 50.0% | 0 | 1 | $10,500 | 100.0% |
| Sub Total | 1 | 50.0% | 0 | 1 | $10,500 | 100.0% |
| Totals | 2 | 100.0% | 1 | 2 | $10,500 | 100.0% |
No Data Available
| Reported Cause of Incident (B) | Number | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| INCORRECT OPERATION | ||||||
| OTHER INCORRECT OPERATION | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
| Sub Total | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
| Totals | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
| Reported Cause of Incident (B) | Number | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| INCORRECT OPERATION | ||||||
| OTHER INCORRECT OPERATION | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
| Sub Total | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
| Totals | 1 | 100.0% | 0 | 1 | $1,413,979 | 100.0% |
No Data Available
No Data Available
| Reported Cause of Incident (B) | Number (C) | % | Fatalities | Injuries | Property Damage (D) (E) | % of Property Damage |
|---|---|---|---|---|---|---|
| CORROSION | ||||||
| EXTERNAL CORROSION | 2 | 6.4% | 1 | 2 | $41,700 | 0.7% |
| Sub Total | 2 | 6.4% | 1 | 2 | $41,700 | 0.7% |
| EXCAVATION DAMAGE | ||||||
| OPERATOR/CONTRACTOR EXCAVATION DAMAGE | 1 | 3.2% | 0 | 6 | $88,904 | 1.6% |
| THIRD PARTY EXCAVATION DAMAGE | 6 | 19.3% | 2 | 10 | $1,315,561 | 23.8% |
| Sub Total | 7 | 22.5% | 2 | 16 | $1,404,465 | 25.5% |
| INCORRECT OPERATION | ||||||
| OTHER INCORRECT OPERATION | 3 | 9.6% | 0 | 3 | $2,565 | 0.0% |
| Sub Total | 3 | 9.6% | 0 | 3 | $2,565 | 0.0% |
| MAT'L/WELD/EQUIP FAILURE | ||||||
| BODY OF PIPE | 2 | 6.4% | 1 | 7 | $531,082 | 9.6% |
| MALFUNCTION OF CONTROL/RELIEF EQUIPMENT | 1 | 3.2% | 0 | 1 | $47,245 | 0.8% |
| Sub Total | 3 | 9.6% | 1 | 8 | $578,327 | 10.5% |
| OTHER OUTSIDE FORCE DAMAGE | ||||||
| VEHICLE NOT ENGAGED IN EXCAVATION | 4 | 12.9% | 1 | 4 | $144,017 | 2.6% |
| ELECTRICAL ARCING FROM OTHER EQUIPMENT/FACILITY | 1 | 3.2% | 0 | 2 | $511,500 | 9.2% |
| OTHER OUTSIDE FORCE DAMAGE | 1 | 3.2% | 0 | 1 | $2,076 | 0.0% |
| Sub Total | 6 | 19.3% | 1 | 7 | $657,593 | 11.9% |
| ALL OTHER CAUSES | ||||||
| MISCELLANEOUS CAUSE | 3 | 9.6% | 0 | 3 | $390 | 0.0% |
| UNKNOWN CAUSE | 7 | 22.5% | 6 | 13 | $2,823,621 | 51.2% |
| Sub Total | 10 | 32.2% | 6 | 16 | $2,824,011 | 51.2% |
| Totals | 31 | 100.0% | 11 | 52 | $5,508,661 | 100.0% |
Notes
- Serious Incidents are those incidents reported by pipeline operators involving a fatality or injury requiring in-patient hospitalization.
- PHMSA has gathered increasingly targeted incident cause data over time. As such, the available reportable categories of cause (eg: Internal/External Corrosion vs Corrosion in general) have increased over time. This report spans time periods over which the reportable cause categories have changed. The cause categories in this report should be taken as general and not specific for years prior to 2002 for Liquid and Gas Transmission, and prior to 2004 for Gas Distribution.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs presented here are nominal (that is, as reported by the Operator at the time of the incident) and are not adjusted to account for commodity cost fluctuations or general inflation.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report.
Sources
- PHMSA Flagged Incidents File - April 30, 2013. Note: Incidents occurring up to 30 days prior the Incident File source date may not appear in these reports due to the 30-day reporting period allowed by PHMSA regulation.
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.