The report below provides some details for all reported significant incidents in the state of Wyoming over the period 1999-2008.
The incidents reported below are limited to Significant Incidents (A) only.
The data sources for this report are the PHMSA Filtered Incident Files (1) (2) (3).
See State Significant Incident and Mileage Overview for a summary of pipeline systems in Wyoming.
Where appropriate, the table columns can be sorted by clicking the corresponding column header.
Wyoming Pipeline Safety Regulatory Fact Sheet
More Pipeline Incidents and Mileage Reports are available.
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/29/1999 | CHEYENNE | CHEYENNE LIGHT FUEL & POWER | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $124,260 | N/A | N/A |
| 03/19/1999 | SINCLAIR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $186,390 | 3,370 | 1,351 | |
| 07/03/1999 | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $124,260 | 4,700 | 1,000 | |
| 02/18/2000 | BELLE FOURCHE PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $24,360 | 400 | 100 | |
| 03/03/2000 | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $36,540 | 100 | 100 | |
| 11/14/2000 | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $548,100 | 900 | 896 | |
| 06/25/2001 | DEAVER | FRANNIE - DEAVER UTILITIES | EXCAVATION DAMAGE | 2 | 1 | $47,606 | N/A | N/A |
| 02/05/2002 | WYOMING | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $190,500 | N/A | N/A |
| 03/03/2002 | SWEETWATER | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $4,350 | 60 | 20 |
| 03/14/2002 | WORLAND | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $146,183 | 633 | 38 |
| 03/26/2002 | RAWLINS | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $301,908 | N/A | N/A |
| 04/14/2002 | SINCLAIR | CONOCO INC (AKA CONOCO PIPE LINE) | EXCAVATION DAMAGE | 0 | 0 | $327,450 | 522 | 522 |
| 02/11/2003 | SUBLETTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $48,789 | 350 | 50 |
| 03/21/2003 | PLATTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $21,655 | 230 | 150 |
| 03/26/2003 | ELK MOUNTAIN | SINCLAIR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $461,424 | 528 | 476 |
| 04/03/2003 | KERN RIVER GAS TRANSMISSION CO (WGP) | ALL OTHER CAUSES | 0 | 0 | $141,534 | N/A | N/A | |
| 07/24/2003 | SINCLAIR | COLORADO INTERSTATE GAS CO | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 225 | 225 |
| 10/08/2003 | TERASEN PIPELINE (USA) INC | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 70 | 0 | |
| 11/08/2003 | KEMMERER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $109,004 | N/A | N/A |
| 12/09/2003 | CASPER | TERASEN PIPELINE (USA) INC | INCORRECT OPERATION | 0 | 4 | $0 | 0 | 0 |
| 01/02/2004 | GRANGER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $143,400 | N/A | N/A |
| 01/16/2004 | CHEYENNE | KANEB PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $74,960 | 250 | 250 |
| 05/03/2004 | GUERNSEY | TERASEN PIPELINE (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $21,579 | 130 | 0 |
| 09/24/2004 | LAMONT | SINCLAIR PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $6,246 | 55 | 7 |
| 03/03/2005 | BELLE FOURCHE PIPELINE | EXCAVATION DAMAGE | 0 | 0 | $3,365 | 50 | 20 | |
| 08/15/2005 | WAMSUTTER | ROCKY MOUNTAIN PIPELINE SYSTEM LLC | CORROSION | 0 | 0 | $3,937 | 54 | 4 |
| 08/28/2005 | TERASEN PIPELINES (USA) INC. | CORROSION | 0 | 0 | $28,043 | 70 | 0 | |
| 09/29/2005 | ROCK SPRINGS | COLORADO INTERSTATE GAS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $251,440 | N/A | N/A |
| 12/05/2005 | CASPER | CONOCOPHILLIPS PIPE LINE CO. | ALL OTHER CAUSES | 0 | 0 | $35,322 | 55 | 51 |
| 12/08/2005 | GREEN RIVER | NORHTWEST PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,339,127 | N/A | N/A |
| 12/08/2005 | COLORADO INTERSTATE GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $165,116 | N/A | N/A | |
| 02/01/2006 | CASPER | TERASEN PIPELINES (USA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $245,192 | 50 | 0 |
| 11/11/2006 | BORIE | COLORADO INTERSTATE GAS | EXCAVATION DAMAGE | 1 | 0 | $0 | N/A | N/A |
| 12/15/2006 | OPAL | NORTHWEST PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,222 | N/A | N/A |
| 11/09/2007 | WHEATLAND | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $257,520 | 10 | 10 |
| 06/03/2008 | CASPER | KINDER MORGAN PIPELINES (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $183,120 | 70 | 0 |
| 07/15/2008 | GILLETTE | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $37,935 | 550 | 25 |
| 12/31/2008 | BYRON | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $12,500 | 86 | 16 |
| Totals | 3 | 5 | $5,837,365 | 13,518 | 5,311 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 03/19/1999 | SINCLAIR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $186,390 | 3,370 | 1,351 | |
| 07/03/1999 | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $124,260 | 4,700 | 1,000 | |
| 02/18/2000 | BELLE FOURCHE PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $24,360 | 400 | 100 | |
| 03/03/2000 | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $36,540 | 100 | 100 | |
| 11/14/2000 | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $548,100 | 900 | 896 | |
| 03/03/2002 | SWEETWATER | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $4,350 | 60 | 20 |
| 03/14/2002 | WORLAND | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $146,183 | 633 | 38 |
| 04/14/2002 | SINCLAIR | CONOCO INC (AKA CONOCO PIPE LINE) | EXCAVATION DAMAGE | 0 | 0 | $327,450 | 522 | 522 |
| 02/11/2003 | SUBLETTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $48,789 | 350 | 50 |
| 03/21/2003 | PLATTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $21,655 | 230 | 150 |
| 03/26/2003 | ELK MOUNTAIN | SINCLAIR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $461,424 | 528 | 476 |
| 07/24/2003 | SINCLAIR | COLORADO INTERSTATE GAS CO | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 225 | 225 |
| 10/08/2003 | TERASEN PIPELINE (USA) INC | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 70 | 0 | |
| 12/09/2003 | CASPER | TERASEN PIPELINE (USA) INC | INCORRECT OPERATION | 0 | 4 | $0 | 0 | 0 |
| 01/16/2004 | CHEYENNE | KANEB PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $74,960 | 250 | 250 |
| 05/03/2004 | GUERNSEY | TERASEN PIPELINE (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $21,579 | 130 | 0 |
| 09/24/2004 | LAMONT | SINCLAIR PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $6,246 | 55 | 7 |
| 03/03/2005 | BELLE FOURCHE PIPELINE | EXCAVATION DAMAGE | 0 | 0 | $3,365 | 50 | 20 | |
| 08/15/2005 | WAMSUTTER | ROCKY MOUNTAIN PIPELINE SYSTEM LLC | CORROSION | 0 | 0 | $3,937 | 54 | 4 |
| 08/28/2005 | TERASEN PIPELINES (USA) INC. | CORROSION | 0 | 0 | $28,043 | 70 | 0 | |
| 12/05/2005 | CASPER | CONOCOPHILLIPS PIPE LINE CO. | ALL OTHER CAUSES | 0 | 0 | $35,322 | 55 | 51 |
| 02/01/2006 | CASPER | TERASEN PIPELINES (USA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $245,192 | 50 | 0 |
| 11/09/2007 | WHEATLAND | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $257,520 | 10 | 10 |
| 06/03/2008 | CASPER | KINDER MORGAN PIPELINES (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $183,120 | 70 | 0 |
| 07/15/2008 | GILLETTE | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $37,935 | 550 | 25 |
| 12/31/2008 | BYRON | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $12,500 | 86 | 16 |
| Totals | 0 | 4 | $2,862,243 | 13,518 | 5,311 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 03/19/1999 | SINCLAIR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $186,390 | 3,370 | 1,351 | |
| 07/03/1999 | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $124,260 | 4,700 | 1,000 | |
| 02/18/2000 | BELLE FOURCHE PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $24,360 | 400 | 100 | |
| 03/03/2000 | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $36,540 | 100 | 100 | |
| 11/14/2000 | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $548,100 | 900 | 896 | |
| 03/03/2002 | SWEETWATER | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $4,350 | 60 | 20 |
| 03/14/2002 | WORLAND | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $146,183 | 633 | 38 |
| 04/14/2002 | SINCLAIR | CONOCO INC (AKA CONOCO PIPE LINE) | EXCAVATION DAMAGE | 0 | 0 | $327,450 | 522 | 522 |
| 02/11/2003 | SUBLETTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $48,789 | 350 | 50 |
| 03/21/2003 | PLATTE | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | CORROSION | 0 | 0 | $21,655 | 230 | 150 |
| 03/26/2003 | ELK MOUNTAIN | SINCLAIR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $461,424 | 528 | 476 |
| 07/24/2003 | SINCLAIR | COLORADO INTERSTATE GAS CO | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 225 | 225 |
| 10/08/2003 | TERASEN PIPELINE (USA) INC | EXCAVATION DAMAGE | 0 | 0 | $11,506 | 70 | 0 | |
| 12/09/2003 | CASPER | TERASEN PIPELINE (USA) INC | INCORRECT OPERATION | 0 | 4 | $0 | 0 | 0 |
| 01/16/2004 | CHEYENNE | KANEB PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $74,960 | 250 | 250 |
| 05/03/2004 | GUERNSEY | TERASEN PIPELINE (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $21,579 | 130 | 0 |
| 09/24/2004 | LAMONT | SINCLAIR PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $6,246 | 55 | 7 |
| 03/03/2005 | BELLE FOURCHE PIPELINE | EXCAVATION DAMAGE | 0 | 0 | $3,365 | 50 | 20 | |
| 08/15/2005 | WAMSUTTER | ROCKY MOUNTAIN PIPELINE SYSTEM LLC | CORROSION | 0 | 0 | $3,937 | 54 | 4 |
| 08/28/2005 | TERASEN PIPELINES (USA) INC. | CORROSION | 0 | 0 | $28,043 | 70 | 0 | |
| 12/05/2005 | CASPER | CONOCOPHILLIPS PIPE LINE CO. | ALL OTHER CAUSES | 0 | 0 | $35,322 | 55 | 51 |
| 02/01/2006 | CASPER | TERASEN PIPELINES (USA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $245,192 | 50 | 0 |
| 11/09/2007 | WHEATLAND | ROCKY MOUNTAIN PIPELINE SYSTEM, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $257,520 | 10 | 10 |
| 06/03/2008 | CASPER | KINDER MORGAN PIPELINES (USA) INC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $183,120 | 70 | 0 |
| 07/15/2008 | GILLETTE | BELLE FOURCHE PIPELINE CO | CORROSION | 0 | 0 | $37,935 | 550 | 25 |
| 12/31/2008 | BYRON | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $12,500 | 86 | 16 |
| Totals | 0 | 4 | $2,862,243 | 13,518 | 5,311 |
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 02/05/2002 | WYOMING | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $190,500 |
| 03/26/2002 | RAWLINS | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $301,908 |
| 04/03/2003 | KERN RIVER GAS TRANSMISSION CO (WGP) | ALL OTHER CAUSES | 0 | 0 | $141,534 | |
| 11/08/2003 | KEMMERER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $109,004 |
| 01/02/2004 | GRANGER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $143,400 |
| 09/29/2005 | ROCK SPRINGS | COLORADO INTERSTATE GAS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $251,440 |
| 12/08/2005 | GREEN RIVER | NORHTWEST PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,339,127 |
| 12/08/2005 | COLORADO INTERSTATE GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $165,116 | |
| 11/11/2006 | BORIE | COLORADO INTERSTATE GAS | EXCAVATION DAMAGE | 1 | 0 | $0 |
| 12/15/2006 | OPAL | NORTHWEST PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,222 |
| Totals | 1 | 0 | $2,803,255 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 02/05/2002 | WYOMING | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $190,500 |
| 03/26/2002 | RAWLINS | COLORADO INTERSTATE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $301,908 |
| 04/03/2003 | KERN RIVER GAS TRANSMISSION CO (WGP) | ALL OTHER CAUSES | 0 | 0 | $141,534 | |
| 11/08/2003 | KEMMERER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $109,004 |
| 01/02/2004 | GRANGER | NORTHWEST PIPELINE CORP (WGP) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $143,400 |
| 09/29/2005 | ROCK SPRINGS | COLORADO INTERSTATE GAS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $251,440 |
| 12/08/2005 | GREEN RIVER | NORHTWEST PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,339,127 |
| 12/08/2005 | COLORADO INTERSTATE GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $165,116 | |
| 11/11/2006 | BORIE | COLORADO INTERSTATE GAS | EXCAVATION DAMAGE | 1 | 0 | $0 |
| 12/15/2006 | OPAL | NORTHWEST PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,222 |
| Totals | 1 | 0 | $2,803,255 |
No Data Available
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/29/1999 | CHEYENNE | CHEYENNE LIGHT FUEL & POWER | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $124,260 |
| 06/25/2001 | DEAVER | FRANNIE - DEAVER UTILITIES | EXCAVATION DAMAGE | 2 | 1 | $47,606 |
| Totals | 2 | 1 | $171,866 |
Notes
- Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion. Note: Significant Incidents include all Serious Incidents. Unless otherwise noted, any counts of Significant Incidents also include Serious Incidents.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs for incidents prior to 2008 are presented in 2008 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2008 dollars.
- Net Barrels Lost applies only to Liquid incidents and is the difference between Gross Barrels Spilled and Barrels Recovered.
Sources
- PHMSA Hazardous Liquid Flagged Incidents File - October 14, 2009
- PHMSA Gas Transmission Flagged Incidents File - October 14, 2009
- PHMSA Gas Distribution Flagged Incidents File - October 14, 2009
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.