The report below provides some details for all reported significant incidents in the state of Virginia over the period 1999-2008.
The incidents reported below are limited to Significant Incidents (A) only.
The data sources for this report are the PHMSA Filtered Incident Files (1) (2) (3).
See State Significant Incident and Mileage Overview for a summary of pipeline systems in Virginia.
Where appropriate, the table columns can be sorted by clicking the corresponding column header.
Virginia Pipeline Safety Regulatory Fact Sheet
More Pipeline Incidents and Mileage Reports are available.
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/03/1999 | WYTHEVILLE | UNITED CITIES GAS CO | CORROSION | 0 | 0 | $621,301 | N/A | N/A |
| 01/03/1999 | WYTHEVILLE | EAST TENNESSEE NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $155,325 | N/A | N/A |
| 01/10/2000 | NEWINGTON | PLANTATION PIPE LINE CO | INCORRECT OPERATION | 0 | 0 | $852,600 | 100 | 80 |
| 02/02/2000 | ASHBURN | WASHINGTON GAS LIGHT CO | EXCAVATION DAMAGE | 0 | 0 | $913,500 | N/A | N/A |
| 05/08/2000 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 0 | 1 | $243,600 | N/A | N/A |
| 05/30/2000 | VIRGINIA BEACH | VIRGINIA NATURAL GAS | EXCAVATION DAMAGE | 0 | 1 | $0 | N/A | N/A |
| 07/21/2000 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 0 | 1 | $0 | N/A | N/A |
| 08/25/2000 | STERLING | WASHINGTON GAS LIGHT CO | ALL OTHER CAUSES | 0 | 0 | $121,800 | N/A | N/A |
| 10/23/2000 | FREDERICKSBURG | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $121,800 | N/A | N/A |
| 06/18/2001 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 1 | 1 | $0 | N/A | N/A |
| 09/08/2001 | VIENNA | WASHINGTON GAS LIGHT CO | ALL OTHER CAUSES | 0 | 0 | $238,030 | N/A | N/A |
| 10/09/2001 | LEESBURG | COLUMBIA GAS TRANSMISSION CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $119,015 | N/A | N/A |
| 10/21/2001 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | NATURAL FORCE DAMAGE | 0 | 10 | $119,015 | N/A | N/A |
| 02/19/2002 | MIDLOTHIAN | COLUMBIA GAS OF VIRGINIA INC | ALL OTHER CAUSES | 0 | 1 | $140,336 | N/A | N/A |
| 03/13/2002 | ALEXANDRIA | PLANTATION PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $386,251 | 26 | 0 |
| 10/17/2002 | HERNDON | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $319,384 | N/A | N/A |
| 03/16/2003 | NOKESVILLE | COLONIAL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,873,430 | 16 | 0 |
| 04/03/2003 | MIDLOTHIAN | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $230,136 | N/A | N/A |
| 08/06/2003 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | EXCAVATION DAMAGE | 0 | 1 | $0 | N/A | N/A |
| 11/28/2003 | ARLINGTON | WASHINGTON GAS LIGHT CO | NATURAL FORCE DAMAGE | 0 | 0 | $575,342 | N/A | N/A |
| 01/31/2004 | GREAT FALLS | WASHINGTON GAS LIGHT CO | NATURAL FORCE DAMAGE | 0 | 0 | $454,308 | N/A | N/A |
| 03/18/2004 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | INCORRECT OPERATION | 0 | 1 | $0 | N/A | N/A |
| 08/14/2004 | HAYMARKET | WASHINGTON GAS LIGHT CO | EXCAVATION DAMAGE | 0 | 0 | $489,944 | N/A | N/A |
| 01/27/2005 | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $171,628 | 2 | 0 | |
| 10/03/2005 | CHANTILLY | WILLIAMS GAS PIPELINE - TRANSCO | EXCAVATION DAMAGE | 0 | 0 | $172,181 | N/A | N/A |
| 11/01/2005 | CRYSTAL CLITY | WASHINGTON GAS | EXCAVATION DAMAGE | 0 | 0 | $132,392 | N/A | N/A |
| 04/17/2006 | RICHMOND | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,837,908 | 553 | 3 |
| 05/08/2006 | RICHMOND | CITY OF RICHMOND DEPARTMENT OF PUBLIC UTILITIES | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $146,998 | N/A | N/A |
| 06/24/2006 | DALE CITY | WASHINGTON GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $434,295 | N/A | N/A |
| 11/27/2006 | NORFOLK | VIRGINIA NATURAL GAS | EXCAVATION DAMAGE | 0 | 1 | $4,126 | N/A | N/A |
| 04/16/2007 | WOODBRIDGE | WASHINGTON GAS | ALL OTHER CAUSES | 1 | 0 | $571,507 | N/A | N/A |
| 04/24/2007 | LEESBURG | WASHINGTON GAS LIGHT COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,251,655 | N/A | N/A |
| 10/26/2007 | RICHMOND | TRANSMONTAIGNE PRODUCT SERVICES INC. | NATURAL FORCE DAMAGE | 0 | 0 | $1,043 | 0 | 0 |
| 04/07/2008 | CHESAPEAKE | VIRGINIA NATURAL GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $524,100 | N/A | N/A |
| 04/28/2008 | SUFFOLK | VIRGINIA NATURAL GAS | NATURAL FORCE DAMAGE | 0 | 3 | $20,171,000 | N/A | N/A |
| 09/14/2008 | APPOMATTOX | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $5,416,000 | N/A | N/A |
| 12/12/2008 | GAINESVILLE | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $108,918 | N/A | N/A |
| Totals | 2 | 21 | $42,918,878 | 697 | 83 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/10/2000 | NEWINGTON | PLANTATION PIPE LINE CO | INCORRECT OPERATION | 0 | 0 | $852,600 | 100 | 80 |
| 03/13/2002 | ALEXANDRIA | PLANTATION PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $386,251 | 26 | 0 |
| 03/16/2003 | NOKESVILLE | COLONIAL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,873,430 | 16 | 0 |
| 01/27/2005 | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $171,628 | 2 | 0 | |
| 04/17/2006 | RICHMOND | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,837,908 | 553 | 3 |
| 10/26/2007 | RICHMOND | TRANSMONTAIGNE PRODUCT SERVICES INC. | NATURAL FORCE DAMAGE | 0 | 0 | $1,043 | 0 | 0 |
| Totals | 0 | 0 | $9,122,862 | 697 | 83 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/10/2000 | NEWINGTON | PLANTATION PIPE LINE CO | INCORRECT OPERATION | 0 | 0 | $852,600 | 100 | 80 |
| 03/13/2002 | ALEXANDRIA | PLANTATION PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $386,251 | 26 | 0 |
| 03/16/2003 | NOKESVILLE | COLONIAL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,873,430 | 16 | 0 |
| 01/27/2005 | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $171,628 | 2 | 0 | |
| 04/17/2006 | RICHMOND | PLANTATION PIPE LINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,837,908 | 553 | 3 |
| 10/26/2007 | RICHMOND | TRANSMONTAIGNE PRODUCT SERVICES INC. | NATURAL FORCE DAMAGE | 0 | 0 | $1,043 | 0 | 0 |
| Totals | 0 | 0 | $9,122,862 | 697 | 83 |
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/03/1999 | WYTHEVILLE | EAST TENNESSEE NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $155,325 |
| 10/09/2001 | LEESBURG | COLUMBIA GAS TRANSMISSION CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $119,015 |
| 10/03/2005 | CHANTILLY | WILLIAMS GAS PIPELINE - TRANSCO | EXCAVATION DAMAGE | 0 | 0 | $172,181 |
| 09/14/2008 | APPOMATTOX | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $5,416,000 |
| Totals | 0 | 0 | $5,862,521 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/03/1999 | WYTHEVILLE | EAST TENNESSEE NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $155,325 |
| 10/09/2001 | LEESBURG | COLUMBIA GAS TRANSMISSION CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $119,015 |
| 10/03/2005 | CHANTILLY | WILLIAMS GAS PIPELINE - TRANSCO | EXCAVATION DAMAGE | 0 | 0 | $172,181 |
| 09/14/2008 | APPOMATTOX | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $5,416,000 |
| Totals | 0 | 0 | $5,862,521 |
No Data Available
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/03/1999 | WYTHEVILLE | UNITED CITIES GAS CO | CORROSION | 0 | 0 | $621,301 |
| 02/02/2000 | ASHBURN | WASHINGTON GAS LIGHT CO | EXCAVATION DAMAGE | 0 | 0 | $913,500 |
| 05/08/2000 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 0 | 1 | $243,600 |
| 05/30/2000 | VIRGINIA BEACH | VIRGINIA NATURAL GAS | EXCAVATION DAMAGE | 0 | 1 | $0 |
| 07/21/2000 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 0 | 1 | $0 |
| 08/25/2000 | STERLING | WASHINGTON GAS LIGHT CO | ALL OTHER CAUSES | 0 | 0 | $121,800 |
| 10/23/2000 | FREDERICKSBURG | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $121,800 |
| 06/18/2001 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | ALL OTHER CAUSES | 1 | 1 | $0 |
| 09/08/2001 | VIENNA | WASHINGTON GAS LIGHT CO | ALL OTHER CAUSES | 0 | 0 | $238,030 |
| 10/21/2001 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | NATURAL FORCE DAMAGE | 0 | 10 | $119,015 |
| 02/19/2002 | MIDLOTHIAN | COLUMBIA GAS OF VIRGINIA INC | ALL OTHER CAUSES | 0 | 1 | $140,336 |
| 10/17/2002 | HERNDON | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $319,384 |
| 04/03/2003 | MIDLOTHIAN | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $230,136 |
| 08/06/2003 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | EXCAVATION DAMAGE | 0 | 1 | $0 |
| 11/28/2003 | ARLINGTON | WASHINGTON GAS LIGHT CO | NATURAL FORCE DAMAGE | 0 | 0 | $575,342 |
| 01/31/2004 | GREAT FALLS | WASHINGTON GAS LIGHT CO | NATURAL FORCE DAMAGE | 0 | 0 | $454,308 |
| 03/18/2004 | RICHMOND | RICHMOND DEPT OF PUBLIC UTILITIES, CITY OF | INCORRECT OPERATION | 0 | 1 | $0 |
| 08/14/2004 | HAYMARKET | WASHINGTON GAS LIGHT CO | EXCAVATION DAMAGE | 0 | 0 | $489,944 |
| 11/01/2005 | CRYSTAL CLITY | WASHINGTON GAS | EXCAVATION DAMAGE | 0 | 0 | $132,392 |
| 05/08/2006 | RICHMOND | CITY OF RICHMOND DEPARTMENT OF PUBLIC UTILITIES | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $146,998 |
| 06/24/2006 | DALE CITY | WASHINGTON GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $434,295 |
| 11/27/2006 | NORFOLK | VIRGINIA NATURAL GAS | EXCAVATION DAMAGE | 0 | 1 | $4,126 |
| 04/16/2007 | WOODBRIDGE | WASHINGTON GAS | ALL OTHER CAUSES | 1 | 0 | $571,507 |
| 04/24/2007 | LEESBURG | WASHINGTON GAS LIGHT COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,251,655 |
| 04/07/2008 | CHESAPEAKE | VIRGINIA NATURAL GAS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $524,100 |
| 04/28/2008 | SUFFOLK | VIRGINIA NATURAL GAS | NATURAL FORCE DAMAGE | 0 | 3 | $20,171,000 |
| 12/12/2008 | GAINESVILLE | COLUMBIA GAS OF VIRGINIA INC | EXCAVATION DAMAGE | 0 | 0 | $108,918 |
| Totals | 2 | 21 | $27,933,494 |
Notes
- Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion. Note: Significant Incidents include all Serious Incidents. Unless otherwise noted, any counts of Significant Incidents also include Serious Incidents.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs for incidents prior to 2008 are presented in 2008 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2008 dollars.
- Net Barrels Lost applies only to Liquid incidents and is the difference between Gross Barrels Spilled and Barrels Recovered.
Sources
- PHMSA Hazardous Liquid Flagged Incidents File - October 14, 2009
- PHMSA Gas Transmission Flagged Incidents File - October 14, 2009
- PHMSA Gas Distribution Flagged Incidents File - October 14, 2009
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.