The report below provides some details for all reported significant incidents in the state of Oklahoma over the period 1999-2008.
The incidents reported below are limited to Significant Incidents (A) only.
The data sources for this report are the PHMSA Filtered Incident Files (1) (2) (3).
See State Significant Incident and Mileage Overview for a summary of pipeline systems in Oklahoma.
Where appropriate, the table columns can be sorted by clicking the corresponding column header.
Oklahoma Pipeline Safety Regulatory Fact Sheet
More Pipeline Incidents and Mileage Reports are available.
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 03/01/1999 | WILLIAMS PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $5,020 | 204 | 138 | |
| 03/12/1999 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $8,201 | 75 | 5 | |
| 03/23/1999 | SEAWAY PIPELINE INC | EXCAVATION DAMAGE | 0 | 0 | $186,390 | 13 | 3 | |
| 05/03/1999 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $1,242,603 | N/A | N/A |
| 06/01/1999 | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $24,852 | 300 | 0 | |
| 06/21/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $1,863 | 105 | 0 |
| 08/04/1999 | CUSHING | SUN PIPE LINE CO | CORROSION | 0 | 0 | $0 | 360 | 0 |
| 08/22/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,106 | 225 | 10 |
| 08/26/1999 | MCALESTER | RELIANT ENERGY - ARKLA | EXCAVATION DAMAGE | 0 | 0 | $469,704 | N/A | N/A |
| 09/04/1999 | TULSA | WILLIAMS PIPE LINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $6,213 | 84 | 1 |
| 09/11/1999 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $49,704 | 75 | 30 | |
| 10/11/1999 | AMOCO PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $0 | 800 | 5 | |
| 10/19/1999 | DYNEGY CRUDE GATHERING INC | ALL OTHER CAUSES | 0 | 0 | $12,426 | 20 | 20 | |
| 10/28/1999 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 2 | $2,485,207 | 0 | 0 |
| 11/03/1999 | ENOGEX INC (EX. MUSTANG FUEL CORP) | ALL OTHER CAUSES | 0 | 0 | $90,710 | N/A | N/A | |
| 11/11/1999 | TALIHINA | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 1 | $0 | N/A | N/A |
| 12/22/1999 | BUFFALO VALLEY | RELIANT ENERGY - ARKLA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $99,408 | N/A | N/A |
| 02/10/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $6,090 | 70 | 15 |
| 02/17/2000 | ELK CITY | OKLAHOMA NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 1 | $14,616 | N/A | N/A |
| 03/27/2000 | LAKETON | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $182,700 | N/A | N/A |
| 04/01/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $12,180 | 200 | 5 |
| 04/03/2000 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $12,180 | 70 | 0 | |
| 04/24/2000 | SUN PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $609 | 140 | 5 | |
| 05/07/2000 | PITTSBURG | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | ALL OTHER CAUSES | 0 | 0 | $2,375,100 | N/A | N/A |
| 07/17/2000 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $12,180 | 641 | 244 |
| 07/17/2000 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | INCORRECT OPERATION | 0 | 1 | $0 | N/A | N/A |
| 07/26/2000 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $60,900 | 200 | 26 | |
| 08/05/2000 | KOCH HYDROCARBON COMPANY | EXCAVATION DAMAGE | 0 | 0 | $62,488 | 759 | 759 | |
| 09/22/2000 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $60,900 | 550 | 70 | |
| 10/15/2000 | BARTLESVILLE | WESTERN RESOURCES INC (AKA KPL CO. OR GAS SERVICE) | CORROSION | 0 | 2 | $42,630 | N/A | N/A |
| 10/20/2000 | BECKHAM | PHILLIPS PIPE LINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $121,800 | 407 | 407 |
| 12/10/2000 | AMOCO PIPELINE CO | CORROSION | 0 | 0 | $0 | 100 | 10 | |
| 02/05/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 20 | 0 | |
| 02/28/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 165 | 0 | |
| 03/13/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 7 | 1 | |
| 03/19/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 15 | 1 | |
| 03/20/2001 | OKLAHOMA | OKLAHOMA NATURAL GAS CO | INCORRECT OPERATION | 0 | 1 | $0 | N/A | N/A |
| 04/05/2001 | BUFFALO | WILLIAMS GAS PIPELINE CENTRAL, INC. | ALL OTHER CAUSES | 1 | 0 | $0 | N/A | N/A |
| 05/16/2001 | PHILLIPS PIPE LINE CO | CORROSION | 0 | 0 | $19,042 | 75 | 65 | |
| 05/20/2001 | RATLIFF | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $142,818 | 12 | 12 |
| 05/25/2001 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $148,768 | N/A | N/A |
| 06/09/2001 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 06/09/2001 | CLINTON | ENRON OIL & GAS CO | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 07/12/2001 | KOCH PIPELINE COMPANY, L.P. | CORROSION | 0 | 0 | $18,685 | 14 | 14 | |
| 08/09/2001 | BOKCHITO | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,384 | N/A | N/A |
| 08/17/2001 | BP NORTH AMERICA INC | ALL OTHER CAUSES | 0 | 0 | $119,015 | 3,000 | 500 | |
| 09/07/2001 | MID - AMERICA PIPELINE CO (MAPCO) | EXCAVATION DAMAGE | 0 | 0 | $261,833 | 77 | 77 | |
| 10/12/2001 | HUGHES | TRANSOK INC | ALL OTHER CAUSES | 0 | 0 | $127,941 | N/A | N/A |
| 01/21/2002 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $233,893 | 600 | 400 |
| 02/08/2002 | PERRY | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 1 | 0 | $230,059 | N/A | N/A |
| 02/15/2002 | CLINTON | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $187,750 | 300 | 1 |
| 03/05/2002 | PRUE | EQUILON PIPELINE COMPANY LLC | CORROSION | 0 | 0 | $61,864 | 1,725 | 25 |
| 04/02/2002 | JAYHAWK PIPELINE CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,265 | 85 | 15 | |
| 04/22/2002 | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,500,504 | 600 | 50 | |
| 04/29/2002 | TRIBBEY | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $249,154 | 75 | 15 |
| 07/01/2002 | WILSON | TEPPCO CRUDE PIPELINE, L.P. | EXCAVATION DAMAGE | 0 | 0 | $6,198 | 165 | 12 |
| 07/25/2002 | WEATHERFORD | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $169,377 | 50 | 35 |
| 08/07/2002 | OKLAHOMA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,847 | 56 | 21 |
| 12/31/2002 | BARTLESVILLE | KANSAS GAS SERVICE | ALL OTHER CAUSES | 0 | 1 | $0 | N/A | N/A |
| 03/23/2003 | SKIATOOK | OKLAHOMA NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $103,561 | N/A | N/A |
| 03/30/2003 | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | ALL OTHER CAUSES | 0 | 0 | $115,068 | 40 | 1 | |
| 04/01/2003 | CONOCO-PHILLIPS | CORROSION | 0 | 0 | $135,021 | 1,000 | 850 | |
| 04/07/2003 | JENKS | CONOCO-PHILLIPS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,712,720 | 8,420 | 8,420 |
| 04/21/2003 | WAPANUCKA | EXPLORER PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $242,794 | 23 | 1 |
| 05/23/2003 | AFTON | EXPLORER PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $123,698 | 75 | 5 |
| 06/16/2003 | HYDRO | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $97,736 | 100 | 15 |
| 08/08/2003 | MOUNTAIN VIEW | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $590,668 | N/A | N/A |
| 08/09/2003 | RATLIFF CITY | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,997 | 50 | 5 |
| 09/22/2003 | EDMOND | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,772,054 | 3,120 | 1,070 |
| 10/27/2003 | KIOWA | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 0 | $99,566 | N/A | N/A |
| 12/08/2003 | RATLIFF CITY | LINK ENERGY LLC | CORROSION | 0 | 0 | $8,515 | 60 | 10 |
| 04/08/2004 | CLINTON | LINK ENERGY LLC | CORROSION | 0 | 0 | $94,957 | 132 | 20 |
| 04/29/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $123,571 | 250 | 45 |
| 07/05/2004 | GLENPOOL | EXPLORER PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $524,374 | 120 | 20 |
| 07/30/2004 | EL RENO | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 0 | 0 | $119,504 | N/A | N/A |
| 08/21/2004 | ALVA | PANHANDLE EASTERN PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $596,597 | N/A | N/A |
| 09/16/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | NATURAL FORCE DAMAGE | 0 | 0 | $2,654,408 | 0 | 0 |
| 09/25/2004 | HARDESTY | EMERALD PIPE LINE CORP | EXCAVATION DAMAGE | 0 | 0 | $133,150 | 449 | 129 |
| 09/27/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $113,582 | 1 | 0 |
| 09/28/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $16,184 | 80 | 5 |
| 09/28/2004 | HOLDENVILLE | EXPLORER PIPELINE CO | CORROSION | 0 | 0 | $4,105,172 | 3,405 | 2,196 |
| 10/14/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $43,159 | 90 | 0 |
| 10/19/2004 | WYNONA | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | EXCAVATION DAMAGE | 0 | 0 | $567,885 | 2,100 | 10 |
| 11/08/2004 | VERDIGRIS | OKLAHOMA NATURAL GAS COMPANY | EXCAVATION DAMAGE | 0 | 0 | $135,441 | N/A | N/A |
| 11/19/2004 | MEDFORD | KOCH PIPELINE COMPANY, L.P | EXCAVATION DAMAGE | 0 | 0 | $90,872 | 14 | 14 |
| 01/18/2005 | CAMERON | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,229 | N/A | N/A |
| 04/24/2005 | CENTRAHOMA | ENOGEX INC. | CORROSION | 0 | 0 | $763,840 | N/A | N/A |
| 05/10/2005 | CLINTON | ANR PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,682,630 | N/A | N/A |
| 05/13/2005 | CALERA | TEPPCO CRUDE PIPELINE, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $563,509 | 898 | 7 |
| 05/31/2005 | YALE | PLAINS PIPELINE | CORROSION | 0 | 0 | $23,668 | 130 | 20 |
| 05/31/2005 | OKLAHOMA CITY | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,010 | 350 | 5 |
| 06/02/2005 | CREEK | SUNOCO PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $10,712 | 662 | 1 |
| 06/23/2005 | STIGLER | OKLAHOMA NATURAL GAS COMPANY | EXCAVATION DAMAGE | 0 | 0 | $92,329 | N/A | N/A |
| 06/27/2005 | PAYNE | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $40,102 | 550 | 15 |
| 08/30/2005 | CENTERPOINT ENERGY GAS TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $269,570 | N/A | N/A | |
| 09/16/2005 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS COMPANY | OTHER OUTSIDE FORCE DAMAGE | 1 | 0 | $7,527 | N/A | N/A |
| 09/19/2005 | ADAIR | CONOCOPHILLIPS PIPE LINE CO. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $51,600 | 85 | 10 |
| 11/22/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $88,817 | 85 | 10 |
| 12/08/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $5,361 | 50 | 5 |
| 02/20/2006 | CUSHING | SEMCRUDE, L.P. | CORROSION | 0 | 0 | $748,844 | 49,000 | 100 |
| 03/11/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $24,505 | 575 | 10 |
| 04/29/2006 | TULSA | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $27,276 | 63 | 3 |
| 05/05/2006 | ALLEN | ENOGEX INC | ALL OTHER CAUSES | 0 | 0 | $186,717 | N/A | N/A |
| 06/01/2006 | PONCA CITY | CONOCOPHILLIPS PIPE LINE CO. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $42,457 | 300 | 300 |
| 06/06/2006 | STRINGTOWN | NATURAL GAS PIPELINE CO. OF AMERICA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $132,498 | N/A | N/A |
| 06/12/2006 | GLENPOOL | EXPLORER PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $6,244,738 | 0 | 0 |
| 06/15/2006 | SEMINOLE | SUNOCO PIPELINE L.P. | EXCAVATION DAMAGE | 0 | 0 | $4,458 | 200 | 0 |
| 08/09/2006 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $596 | 10 | 10 |
| 08/29/2006 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C, | CORROSION | 0 | 0 | $159,252 | 0 | 0 |
| 09/19/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | ALL OTHER CAUSES | 0 | 0 | $57,139 | 1,238 | 59 |
| 12/02/2006 | RATLIFF CITY | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $103,781 | 30 | 3 |
| 01/23/2007 | TULSA | OKLAHOMA NATURAL GAS COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 1 | $3,473 | N/A | N/A |
| 05/05/2007 | DRUMRIGHT | BP PIPELINE | INCORRECT OPERATION | 0 | 0 | $470,498 | 45 | 0 |
| 06/14/2007 | CUSHING | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $111,860 | 25 | 15 |
| 06/27/2007 | ELMORE CITY | SUNOCO PIPELINE L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $49,854 | 50 | 15 |
| 01/05/2008 | OOLOGAH | MAGELLAN PIPELINE COMPANY, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $669,700 | 1,075 | 690 |
| 02/15/2008 | JENKS | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $150,000 | 25 | 0 |
| 06/13/2008 | BUTLER | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $208,250 | N/A | N/A |
| 06/22/2008 | BARTLESVILLE | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $1,081,330 | 125 | 115 |
| 06/26/2008 | DRUMRIGHT | BP PIPELINE (NORTH AMERICA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $17,000 | 72 | 0 |
| 06/28/2008 | SEILING | ONEOK NGL PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $181,410 | 2,304 | 2,304 |
| 08/07/2008 | ELK CITY | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $210,428 | N/A | N/A |
| 08/14/2008 | ALTUS | CONOCOPHILLIPS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $114,860 | 34 | 34 |
| 11/25/2008 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $57,233 | 6 | 6 |
| Totals | 3 | 10 | $41,700,069 | 90,155 | 19,650 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 03/01/1999 | WILLIAMS PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $5,020 | 204 | 138 | |
| 03/12/1999 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $8,201 | 75 | 5 | |
| 03/23/1999 | SEAWAY PIPELINE INC | EXCAVATION DAMAGE | 0 | 0 | $186,390 | 13 | 3 | |
| 06/01/1999 | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $24,852 | 300 | 0 | |
| 06/21/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $1,863 | 105 | 0 |
| 08/04/1999 | CUSHING | SUN PIPE LINE CO | CORROSION | 0 | 0 | $0 | 360 | 0 |
| 08/22/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,106 | 225 | 10 |
| 09/04/1999 | TULSA | WILLIAMS PIPE LINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $6,213 | 84 | 1 |
| 09/11/1999 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $49,704 | 75 | 30 | |
| 10/11/1999 | AMOCO PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $0 | 800 | 5 | |
| 10/19/1999 | DYNEGY CRUDE GATHERING INC | ALL OTHER CAUSES | 0 | 0 | $12,426 | 20 | 20 | |
| 10/28/1999 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 2 | $2,485,207 | 0 | 0 |
| 02/10/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $6,090 | 70 | 15 |
| 04/01/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $12,180 | 200 | 5 |
| 04/03/2000 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $12,180 | 70 | 0 | |
| 04/24/2000 | SUN PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $609 | 140 | 5 | |
| 07/17/2000 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $12,180 | 641 | 244 |
| 07/26/2000 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $60,900 | 200 | 26 | |
| 08/05/2000 | KOCH HYDROCARBON COMPANY | EXCAVATION DAMAGE | 0 | 0 | $62,488 | 759 | 759 | |
| 09/22/2000 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $60,900 | 550 | 70 | |
| 10/20/2000 | BECKHAM | PHILLIPS PIPE LINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $121,800 | 407 | 407 |
| 12/10/2000 | AMOCO PIPELINE CO | CORROSION | 0 | 0 | $0 | 100 | 10 | |
| 02/05/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 20 | 0 | |
| 02/28/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 165 | 0 | |
| 03/13/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 7 | 1 | |
| 03/19/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 15 | 1 | |
| 05/16/2001 | PHILLIPS PIPE LINE CO | CORROSION | 0 | 0 | $19,042 | 75 | 65 | |
| 05/20/2001 | RATLIFF | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $142,818 | 12 | 12 |
| 06/09/2001 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 06/09/2001 | CLINTON | ENRON OIL & GAS CO | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 07/12/2001 | KOCH PIPELINE COMPANY, L.P. | CORROSION | 0 | 0 | $18,685 | 14 | 14 | |
| 08/17/2001 | BP NORTH AMERICA INC | ALL OTHER CAUSES | 0 | 0 | $119,015 | 3,000 | 500 | |
| 09/07/2001 | MID - AMERICA PIPELINE CO (MAPCO) | EXCAVATION DAMAGE | 0 | 0 | $261,833 | 77 | 77 | |
| 01/21/2002 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $233,893 | 600 | 400 |
| 02/15/2002 | CLINTON | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $187,750 | 300 | 1 |
| 03/05/2002 | PRUE | EQUILON PIPELINE COMPANY LLC | CORROSION | 0 | 0 | $61,864 | 1,725 | 25 |
| 04/02/2002 | JAYHAWK PIPELINE CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,265 | 85 | 15 | |
| 04/22/2002 | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,500,504 | 600 | 50 | |
| 04/29/2002 | TRIBBEY | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $249,154 | 75 | 15 |
| 07/01/2002 | WILSON | TEPPCO CRUDE PIPELINE, L.P. | EXCAVATION DAMAGE | 0 | 0 | $6,198 | 165 | 12 |
| 07/25/2002 | WEATHERFORD | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $169,377 | 50 | 35 |
| 08/07/2002 | OKLAHOMA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,847 | 56 | 21 |
| 03/30/2003 | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | ALL OTHER CAUSES | 0 | 0 | $115,068 | 40 | 1 | |
| 04/01/2003 | CONOCO-PHILLIPS | CORROSION | 0 | 0 | $135,021 | 1,000 | 850 | |
| 04/07/2003 | JENKS | CONOCO-PHILLIPS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,712,720 | 8,420 | 8,420 |
| 04/21/2003 | WAPANUCKA | EXPLORER PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $242,794 | 23 | 1 |
| 05/23/2003 | AFTON | EXPLORER PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $123,698 | 75 | 5 |
| 06/16/2003 | HYDRO | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $97,736 | 100 | 15 |
| 08/09/2003 | RATLIFF CITY | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,997 | 50 | 5 |
| 09/22/2003 | EDMOND | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,772,054 | 3,120 | 1,070 |
| 12/08/2003 | RATLIFF CITY | LINK ENERGY LLC | CORROSION | 0 | 0 | $8,515 | 60 | 10 |
| 04/08/2004 | CLINTON | LINK ENERGY LLC | CORROSION | 0 | 0 | $94,957 | 132 | 20 |
| 04/29/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $123,571 | 250 | 45 |
| 07/05/2004 | GLENPOOL | EXPLORER PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $524,374 | 120 | 20 |
| 09/16/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | NATURAL FORCE DAMAGE | 0 | 0 | $2,654,408 | 0 | 0 |
| 09/25/2004 | HARDESTY | EMERALD PIPE LINE CORP | EXCAVATION DAMAGE | 0 | 0 | $133,150 | 449 | 129 |
| 09/27/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $113,582 | 1 | 0 |
| 09/28/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $16,184 | 80 | 5 |
| 09/28/2004 | HOLDENVILLE | EXPLORER PIPELINE CO | CORROSION | 0 | 0 | $4,105,172 | 3,405 | 2,196 |
| 10/14/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $43,159 | 90 | 0 |
| 10/19/2004 | WYNONA | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | EXCAVATION DAMAGE | 0 | 0 | $567,885 | 2,100 | 10 |
| 11/19/2004 | MEDFORD | KOCH PIPELINE COMPANY, L.P | EXCAVATION DAMAGE | 0 | 0 | $90,872 | 14 | 14 |
| 05/13/2005 | CALERA | TEPPCO CRUDE PIPELINE, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $563,509 | 898 | 7 |
| 05/31/2005 | YALE | PLAINS PIPELINE | CORROSION | 0 | 0 | $23,668 | 130 | 20 |
| 05/31/2005 | OKLAHOMA CITY | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,010 | 350 | 5 |
| 06/02/2005 | CREEK | SUNOCO PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $10,712 | 662 | 1 |
| 06/27/2005 | PAYNE | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $40,102 | 550 | 15 |
| 09/19/2005 | ADAIR | CONOCOPHILLIPS PIPE LINE CO. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $51,600 | 85 | 10 |
| 11/22/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $88,817 | 85 | 10 |
| 12/08/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $5,361 | 50 | 5 |
| 02/20/2006 | CUSHING | SEMCRUDE, L.P. | CORROSION | 0 | 0 | $748,844 | 49,000 | 100 |
| 03/11/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $24,505 | 575 | 10 |
| 04/29/2006 | TULSA | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $27,276 | 63 | 3 |
| 06/01/2006 | PONCA CITY | CONOCOPHILLIPS PIPE LINE CO. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $42,457 | 300 | 300 |
| 06/12/2006 | GLENPOOL | EXPLORER PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $6,244,738 | 0 | 0 |
| 06/15/2006 | SEMINOLE | SUNOCO PIPELINE L.P. | EXCAVATION DAMAGE | 0 | 0 | $4,458 | 200 | 0 |
| 08/09/2006 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $596 | 10 | 10 |
| 08/29/2006 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C, | CORROSION | 0 | 0 | $159,252 | 0 | 0 |
| 09/19/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | ALL OTHER CAUSES | 0 | 0 | $57,139 | 1,238 | 59 |
| 12/02/2006 | RATLIFF CITY | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $103,781 | 30 | 3 |
| 05/05/2007 | DRUMRIGHT | BP PIPELINE | INCORRECT OPERATION | 0 | 0 | $470,498 | 45 | 0 |
| 06/14/2007 | CUSHING | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $111,860 | 25 | 15 |
| 06/27/2007 | ELMORE CITY | SUNOCO PIPELINE L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $49,854 | 50 | 15 |
| 01/05/2008 | OOLOGAH | MAGELLAN PIPELINE COMPANY, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $669,700 | 1,075 | 690 |
| 02/15/2008 | JENKS | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $150,000 | 25 | 0 |
| 06/22/2008 | BARTLESVILLE | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $1,081,330 | 125 | 115 |
| 06/26/2008 | DRUMRIGHT | BP PIPELINE (NORTH AMERICA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $17,000 | 72 | 0 |
| 06/28/2008 | SEILING | ONEOK NGL PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $181,410 | 2,304 | 2,304 |
| 08/14/2008 | ALTUS | CONOCOPHILLIPS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $114,860 | 34 | 34 |
| 11/25/2008 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $57,233 | 6 | 6 |
| Totals | 0 | 2 | $31,199,609 | 90,155 | 19,650 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 03/01/1999 | WILLIAMS PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $5,020 | 204 | 138 | |
| 03/12/1999 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $8,201 | 75 | 5 | |
| 03/23/1999 | SEAWAY PIPELINE INC | EXCAVATION DAMAGE | 0 | 0 | $186,390 | 13 | 3 | |
| 06/01/1999 | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $24,852 | 300 | 0 | |
| 06/21/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $1,863 | 105 | 0 |
| 08/04/1999 | CUSHING | SUN PIPE LINE CO | CORROSION | 0 | 0 | $0 | 360 | 0 |
| 08/22/1999 | MUSTANG | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,106 | 225 | 10 |
| 09/04/1999 | TULSA | WILLIAMS PIPE LINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $6,213 | 84 | 1 |
| 09/11/1999 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $49,704 | 75 | 30 | |
| 10/11/1999 | AMOCO PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $0 | 800 | 5 | |
| 10/19/1999 | DYNEGY CRUDE GATHERING INC | ALL OTHER CAUSES | 0 | 0 | $12,426 | 20 | 20 | |
| 10/28/1999 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 2 | $2,485,207 | 0 | 0 |
| 02/10/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | ALL OTHER CAUSES | 0 | 0 | $6,090 | 70 | 15 |
| 04/01/2000 | PONCA | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $12,180 | 200 | 5 |
| 04/03/2000 | AMOCO PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $12,180 | 70 | 0 | |
| 04/24/2000 | SUN PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $609 | 140 | 5 | |
| 07/17/2000 | PONCA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $12,180 | 641 | 244 |
| 07/26/2000 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $60,900 | 200 | 26 | |
| 08/05/2000 | KOCH HYDROCARBON COMPANY | EXCAVATION DAMAGE | 0 | 0 | $62,488 | 759 | 759 | |
| 09/22/2000 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | EXCAVATION DAMAGE | 0 | 0 | $60,900 | 550 | 70 | |
| 10/20/2000 | BECKHAM | PHILLIPS PIPE LINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $121,800 | 407 | 407 |
| 12/10/2000 | AMOCO PIPELINE CO | CORROSION | 0 | 0 | $0 | 100 | 10 | |
| 02/05/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 20 | 0 | |
| 02/28/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 165 | 0 | |
| 03/13/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $0 | 7 | 1 | |
| 03/19/2001 | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | ALL OTHER CAUSES | 0 | 0 | $0 | 15 | 1 | |
| 05/16/2001 | PHILLIPS PIPE LINE CO | CORROSION | 0 | 0 | $19,042 | 75 | 65 | |
| 05/20/2001 | RATLIFF | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $142,818 | 12 | 12 |
| 06/09/2001 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 06/09/2001 | CLINTON | ENRON OIL & GAS CO | CORROSION | 0 | 0 | $148,768 | 100 | 50 |
| 07/12/2001 | KOCH PIPELINE COMPANY, L.P. | CORROSION | 0 | 0 | $18,685 | 14 | 14 | |
| 08/17/2001 | BP NORTH AMERICA INC | ALL OTHER CAUSES | 0 | 0 | $119,015 | 3,000 | 500 | |
| 09/07/2001 | MID - AMERICA PIPELINE CO (MAPCO) | EXCAVATION DAMAGE | 0 | 0 | $261,833 | 77 | 77 | |
| 01/21/2002 | CLINTON | ENRON PRODUCTS PIPELINE INC | CORROSION | 0 | 0 | $233,893 | 600 | 400 |
| 02/15/2002 | CLINTON | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $187,750 | 300 | 1 |
| 03/05/2002 | PRUE | EQUILON PIPELINE COMPANY LLC | CORROSION | 0 | 0 | $61,864 | 1,725 | 25 |
| 04/02/2002 | JAYHAWK PIPELINE CORP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,265 | 85 | 15 | |
| 04/22/2002 | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,500,504 | 600 | 50 | |
| 04/29/2002 | TRIBBEY | BP PIPELINE (NORTH AMERICA) INC. | NATURAL FORCE DAMAGE | 0 | 0 | $249,154 | 75 | 15 |
| 07/01/2002 | WILSON | TEPPCO CRUDE PIPELINE, L.P. | EXCAVATION DAMAGE | 0 | 0 | $6,198 | 165 | 12 |
| 07/25/2002 | WEATHERFORD | ENRON PIPELINE SERVICES CO | CORROSION | 0 | 0 | $169,377 | 50 | 35 |
| 08/07/2002 | OKLAHOMA CITY | CONOCO INC (AKA CONOCO PIPE LINE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $5,847 | 56 | 21 |
| 03/30/2003 | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | ALL OTHER CAUSES | 0 | 0 | $115,068 | 40 | 1 | |
| 04/01/2003 | CONOCO-PHILLIPS | CORROSION | 0 | 0 | $135,021 | 1,000 | 850 | |
| 04/07/2003 | JENKS | CONOCO-PHILLIPS | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,712,720 | 8,420 | 8,420 |
| 04/21/2003 | WAPANUCKA | EXPLORER PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $242,794 | 23 | 1 |
| 05/23/2003 | AFTON | EXPLORER PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $123,698 | 75 | 5 |
| 06/16/2003 | HYDRO | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | CORROSION | 0 | 0 | $97,736 | 100 | 15 |
| 08/09/2003 | RATLIFF CITY | EOTT ENERGY PIPELINE LIMITED PARTNERSHIP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,997 | 50 | 5 |
| 09/22/2003 | EDMOND | BP PIPELINE (NORTH AMERICA) INC. | EXCAVATION DAMAGE | 0 | 0 | $1,772,054 | 3,120 | 1,070 |
| 12/08/2003 | RATLIFF CITY | LINK ENERGY LLC | CORROSION | 0 | 0 | $8,515 | 60 | 10 |
| 04/08/2004 | CLINTON | LINK ENERGY LLC | CORROSION | 0 | 0 | $94,957 | 132 | 20 |
| 04/29/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $123,571 | 250 | 45 |
| 07/05/2004 | GLENPOOL | EXPLORER PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $524,374 | 120 | 20 |
| 09/16/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | NATURAL FORCE DAMAGE | 0 | 0 | $2,654,408 | 0 | 0 |
| 09/25/2004 | HARDESTY | EMERALD PIPE LINE CORP | EXCAVATION DAMAGE | 0 | 0 | $133,150 | 449 | 129 |
| 09/27/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $113,582 | 1 | 0 |
| 09/28/2004 | HEALDTON | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $16,184 | 80 | 5 |
| 09/28/2004 | HOLDENVILLE | EXPLORER PIPELINE CO | CORROSION | 0 | 0 | $4,105,172 | 3,405 | 2,196 |
| 10/14/2004 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C. | CORROSION | 0 | 0 | $43,159 | 90 | 0 |
| 10/19/2004 | WYNONA | CUSHING - CHICAGO CRUDE OIL PIPELINE (ARCO P/L CO) | EXCAVATION DAMAGE | 0 | 0 | $567,885 | 2,100 | 10 |
| 11/19/2004 | MEDFORD | KOCH PIPELINE COMPANY, L.P | EXCAVATION DAMAGE | 0 | 0 | $90,872 | 14 | 14 |
| 05/13/2005 | CALERA | TEPPCO CRUDE PIPELINE, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $563,509 | 898 | 7 |
| 05/31/2005 | YALE | PLAINS PIPELINE | CORROSION | 0 | 0 | $23,668 | 130 | 20 |
| 05/31/2005 | OKLAHOMA CITY | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $7,010 | 350 | 5 |
| 06/02/2005 | CREEK | SUNOCO PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $10,712 | 662 | 1 |
| 06/27/2005 | PAYNE | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $40,102 | 550 | 15 |
| 09/19/2005 | ADAIR | CONOCOPHILLIPS PIPE LINE CO. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $51,600 | 85 | 10 |
| 11/22/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $88,817 | 85 | 10 |
| 12/08/2005 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | CORROSION | 0 | 0 | $5,361 | 50 | 5 |
| 02/20/2006 | CUSHING | SEMCRUDE, L.P. | CORROSION | 0 | 0 | $748,844 | 49,000 | 100 |
| 03/11/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $24,505 | 575 | 10 |
| 04/29/2006 | TULSA | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $27,276 | 63 | 3 |
| 06/01/2006 | PONCA CITY | CONOCOPHILLIPS PIPE LINE CO. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $42,457 | 300 | 300 |
| 06/12/2006 | GLENPOOL | EXPLORER PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $6,244,738 | 0 | 0 |
| 06/15/2006 | SEMINOLE | SUNOCO PIPELINE L.P. | EXCAVATION DAMAGE | 0 | 0 | $4,458 | 200 | 0 |
| 08/09/2006 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $596 | 10 | 10 |
| 08/29/2006 | CUSHING | ENBRIDGE PIPELINES (OZARK) L.L.C, | CORROSION | 0 | 0 | $159,252 | 0 | 0 |
| 09/19/2006 | CUSHING | TEPPCO CRUDE PIPELINE, L.P. | ALL OTHER CAUSES | 0 | 0 | $57,139 | 1,238 | 59 |
| 12/02/2006 | RATLIFF CITY | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $103,781 | 30 | 3 |
| 05/05/2007 | DRUMRIGHT | BP PIPELINE | INCORRECT OPERATION | 0 | 0 | $470,498 | 45 | 0 |
| 06/14/2007 | CUSHING | SUNOCO PIPELINE L.P. | CORROSION | 0 | 0 | $111,860 | 25 | 15 |
| 06/27/2007 | ELMORE CITY | SUNOCO PIPELINE L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $49,854 | 50 | 15 |
| 01/05/2008 | OOLOGAH | MAGELLAN PIPELINE COMPANY, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $669,700 | 1,075 | 690 |
| 02/15/2008 | JENKS | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $150,000 | 25 | 0 |
| 06/22/2008 | BARTLESVILLE | MAGELLAN PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $1,081,330 | 125 | 115 |
| 06/26/2008 | DRUMRIGHT | BP PIPELINE (NORTH AMERICA) INC. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $17,000 | 72 | 0 |
| 06/28/2008 | SEILING | ONEOK NGL PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $181,410 | 2,304 | 2,304 |
| 08/14/2008 | ALTUS | CONOCOPHILLIPS | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $114,860 | 34 | 34 |
| 11/25/2008 | MEDFORD | ONEOK NGL PIPELINE LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $57,233 | 6 | 6 |
| Totals | 0 | 2 | $31,199,609 | 90,155 | 19,650 |
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 11/03/1999 | ENOGEX INC (EX. MUSTANG FUEL CORP) | ALL OTHER CAUSES | 0 | 0 | $90,710 | |
| 11/11/1999 | TALIHINA | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 1 | $0 |
| 12/22/1999 | BUFFALO VALLEY | RELIANT ENERGY - ARKLA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $99,408 |
| 03/27/2000 | LAKETON | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $182,700 |
| 05/07/2000 | PITTSBURG | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | ALL OTHER CAUSES | 0 | 0 | $2,375,100 |
| 04/05/2001 | BUFFALO | WILLIAMS GAS PIPELINE CENTRAL, INC. | ALL OTHER CAUSES | 1 | 0 | $0 |
| 08/09/2001 | BOKCHITO | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,384 |
| 10/12/2001 | HUGHES | TRANSOK INC | ALL OTHER CAUSES | 0 | 0 | $127,941 |
| 02/08/2002 | PERRY | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 1 | 0 | $230,059 |
| 08/08/2003 | MOUNTAIN VIEW | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $590,668 |
| 10/27/2003 | KIOWA | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 0 | $99,566 |
| 07/30/2004 | EL RENO | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 0 | 0 | $119,504 |
| 08/21/2004 | ALVA | PANHANDLE EASTERN PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $596,597 |
| 01/18/2005 | CAMERON | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,229 |
| 04/24/2005 | CENTRAHOMA | ENOGEX INC. | CORROSION | 0 | 0 | $763,840 |
| 05/10/2005 | CLINTON | ANR PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,682,630 |
| 08/30/2005 | CENTERPOINT ENERGY GAS TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $269,570 | |
| 05/05/2006 | ALLEN | ENOGEX INC | ALL OTHER CAUSES | 0 | 0 | $186,717 |
| 06/06/2006 | STRINGTOWN | NATURAL GAS PIPELINE CO. OF AMERICA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $132,498 |
| 06/13/2008 | BUTLER | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $208,250 |
| 08/07/2008 | ELK CITY | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $210,428 |
| Totals | 2 | 1 | $8,239,804 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 11/03/1999 | ENOGEX INC (EX. MUSTANG FUEL CORP) | ALL OTHER CAUSES | 0 | 0 | $90,710 | |
| 11/11/1999 | TALIHINA | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 1 | $0 |
| 12/22/1999 | BUFFALO VALLEY | RELIANT ENERGY - ARKLA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $99,408 |
| 03/27/2000 | LAKETON | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $182,700 |
| 05/07/2000 | PITTSBURG | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | ALL OTHER CAUSES | 0 | 0 | $2,375,100 |
| 04/05/2001 | BUFFALO | WILLIAMS GAS PIPELINE CENTRAL, INC. | ALL OTHER CAUSES | 1 | 0 | $0 |
| 08/09/2001 | BOKCHITO | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $161,384 |
| 10/12/2001 | HUGHES | TRANSOK INC | ALL OTHER CAUSES | 0 | 0 | $127,941 |
| 02/08/2002 | PERRY | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 1 | 0 | $230,059 |
| 08/08/2003 | MOUNTAIN VIEW | NATURAL GAS PIPELINE CO OF AMERICA (KMI) | CORROSION | 0 | 0 | $590,668 |
| 10/27/2003 | KIOWA | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 0 | $99,566 |
| 07/30/2004 | EL RENO | ENOGEX INC (EX. MUSTANG FUEL CORP) | EXCAVATION DAMAGE | 0 | 0 | $119,504 |
| 08/21/2004 | ALVA | PANHANDLE EASTERN PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $596,597 |
| 01/18/2005 | CAMERON | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,229 |
| 04/24/2005 | CENTRAHOMA | ENOGEX INC. | CORROSION | 0 | 0 | $763,840 |
| 05/10/2005 | CLINTON | ANR PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,682,630 |
| 08/30/2005 | CENTERPOINT ENERGY GAS TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $269,570 | |
| 05/05/2006 | ALLEN | ENOGEX INC | ALL OTHER CAUSES | 0 | 0 | $186,717 |
| 06/06/2006 | STRINGTOWN | NATURAL GAS PIPELINE CO. OF AMERICA | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $132,498 |
| 06/13/2008 | BUTLER | CENTERPOINT ENERGY GAS TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $208,250 |
| 08/07/2008 | ELK CITY | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $210,428 |
| Totals | 2 | 1 | $8,239,804 |
No Data Available
No Data Available
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 05/03/1999 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $1,242,603 |
| 08/26/1999 | MCALESTER | RELIANT ENERGY - ARKLA | EXCAVATION DAMAGE | 0 | 0 | $469,704 |
| 02/17/2000 | ELK CITY | OKLAHOMA NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 1 | $14,616 |
| 07/17/2000 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | INCORRECT OPERATION | 0 | 1 | $0 |
| 10/15/2000 | BARTLESVILLE | WESTERN RESOURCES INC (AKA KPL CO. OR GAS SERVICE) | CORROSION | 0 | 2 | $42,630 |
| 03/20/2001 | OKLAHOMA | OKLAHOMA NATURAL GAS CO | INCORRECT OPERATION | 0 | 1 | $0 |
| 05/25/2001 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 0 | $148,768 |
| 12/31/2002 | BARTLESVILLE | KANSAS GAS SERVICE | ALL OTHER CAUSES | 0 | 1 | $0 |
| 03/23/2003 | SKIATOOK | OKLAHOMA NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $103,561 |
| 11/08/2004 | VERDIGRIS | OKLAHOMA NATURAL GAS COMPANY | EXCAVATION DAMAGE | 0 | 0 | $135,441 |
| 06/23/2005 | STIGLER | OKLAHOMA NATURAL GAS COMPANY | EXCAVATION DAMAGE | 0 | 0 | $92,329 |
| 09/16/2005 | OKLAHOMA CITY | OKLAHOMA NATURAL GAS COMPANY | OTHER OUTSIDE FORCE DAMAGE | 1 | 0 | $7,527 |
| 01/23/2007 | TULSA | OKLAHOMA NATURAL GAS COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 1 | $3,473 |
| Totals | 1 | 7 | $2,260,655 |
Notes
- Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion. Note: Significant Incidents include all Serious Incidents. Unless otherwise noted, any counts of Significant Incidents also include Serious Incidents.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs for incidents prior to 2008 are presented in 2008 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2008 dollars.
- Net Barrels Lost applies only to Liquid incidents and is the difference between Gross Barrels Spilled and Barrels Recovered.
Sources
- PHMSA Hazardous Liquid Flagged Incidents File - October 14, 2009
- PHMSA Gas Transmission Flagged Incidents File - October 14, 2009
- PHMSA Gas Distribution Flagged Incidents File - October 14, 2009
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.