The report below provides some details for all reported significant incidents in the state of Louisiana over the period 1999-2008.
The incidents reported below are limited to Significant Incidents (A) only.
The data sources for this report are the PHMSA Filtered Incident Files (1) (2) (3).
See State Significant Incident and Mileage Overview for a summary of pipeline systems in Louisiana.
Where appropriate, the table columns can be sorted by clicking the corresponding column header.
Louisiana Pipeline Safety Regulatory Fact Sheet
More Pipeline Incidents and Mileage Reports are available.
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/17/1999 | WEST CAMERON BLOCK 630 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $434,911 | N/A | N/A |
| 01/18/1999 | PLAQUEMINE | PLAQUEMINE, CITY OF | ALL OTHER CAUSES | 0 | 1 | $0 | N/A | N/A |
| 01/21/1999 | EMPIRE | CHEVRON PIPELINE CO | CORROSION | 0 | 0 | $186,390 | 5,000 | 20 |
| 01/30/1999 | MONTICELLO | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $205,029 | N/A | N/A |
| 06/16/1999 | CADDO | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $62,130 | 1,163 | 900 |
| 08/15/1999 | VENICE | MID LOUISIANA GAS CO | EXCAVATION DAMAGE | 0 | 0 | $124,260 | N/A | N/A |
| 09/25/1999 | SEA ROBIN PIPELINE CO | CORROSION | 0 | 0 | $248,520 | N/A | N/A | |
| 10/04/1999 | BELLE ROSE | BRIDGELINE GAS DISTRIBUTION LLC | ALL OTHER CAUSES | 0 | 0 | $0 | 231 | 231 |
| 10/18/1999 | PLAQUEMINES | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $497,041 | 100 | 100 |
| 10/27/1999 | JOHNSON BAYOU | WILLIAM FIELD SERVICES | CORROSION | 0 | 0 | $310,650 | N/A | N/A |
| 11/24/1999 | FOUR BAYOU | CHEVRON PIPE LINE NORTHWEST REGION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,976,331 | 850 | 660 |
| 12/01/1999 | BRUSLY | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $8,698 | 200 | 20 |
| 12/07/1999 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | CORROSION | 0 | 0 | $31,065 | 100 | 0 |
| 01/14/2000 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $9,273 | 277 | 277 |
| 01/22/2000 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $146,160 | 1 | 1 | |
| 01/27/2000 | NEW ORLEANS | NEW ORLEANS PUBLIC SERVICE INC | NATURAL FORCE DAMAGE | 1 | 0 | $0 | N/A | N/A |
| 01/31/2000 | PLAQUEMINES | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $298,473 | 1 | 1 |
| 02/01/2000 | WEST MONROE | TENNESSEE GAS PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $231,420 | N/A | N/A |
| 02/23/2000 | JOHNSON BAYOU | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $146,160 | N/A | N/A |
| 04/24/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $96,222 | N/A | N/A | |
| 04/26/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,700 | N/A | N/A | |
| 05/09/2000 | CAMERON | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $0 | 845 | 844 |
| 05/16/2000 | DYNEGY MIDSTREAM SERVICES INC | ALL OTHER CAUSES | 0 | 0 | $3,654 | 1 | 1 | |
| 06/17/2000 | TENNESSEE GAS PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $730,800 | N/A | N/A | |
| 07/05/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $121,800 | N/A | N/A | |
| 07/05/2000 | PLAQUEMINES | SOUTHERN NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 5 | $609,000 | N/A | N/A |
| 08/19/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $144,942 | N/A | N/A | |
| 09/01/2000 | METAIRIE | LOUISIANA GAS SERVICE CO | ALL OTHER CAUSES | 0 | 0 | $121,800 | N/A | N/A |
| 09/29/2000 | MADISON | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $304,500 | N/A | N/A |
| 10/27/2000 | PORT ALLEN | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $3,700 | 140 | 140 |
| 10/30/2000 | ST MARYS | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,827,000 | 940 | 940 |
| 11/15/2000 | MID - VALLEY PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,157,100 | 1,350 | 25 | |
| 11/23/2000 | POLLOCK | TRUNKLINE GAS CO | ALL OTHER CAUSES | 0 | 0 | $1,096,200 | N/A | N/A |
| 11/24/2000 | HAYNESVILLE | MID - VALLEY PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,131,500 | 1,303 | 153 |
| 01/29/2001 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $1,011,627 | 475 | 60 | |
| 02/19/2001 | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $535,567 | 100 | 70 | |
| 02/28/2001 | EL PASO FIELD SERVICES | EXCAVATION DAMAGE | 0 | 0 | $8,986,350 | N/A | N/A | |
| 04/05/2001 | MOSQUITO BAY MARSH | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $1,487,688 | N/A | N/A |
| 04/06/2001 | NEW ORLEANS | GULF STATES UTILITIES CO | EXCAVATION DAMAGE | 0 | 0 | $178,522 | N/A | N/A |
| 04/14/2001 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES, L.P. | CORROSION | 0 | 0 | $6,545 | 42 | 42 |
| 04/27/2001 | EUNICE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $535,567 | N/A | N/A |
| 05/13/2001 | SEA ROBIN PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $749,794 | N/A | N/A | |
| 05/24/2001 | DYNEGY MIDSTREAM SERVICES, L.P. | EXCAVATION DAMAGE | 0 | 0 | $154,719 | N/A | N/A | |
| 06/24/2001 | CALCASIEU | CONOCO INC (AKA CONOCO PIPE LINE) | CORROSION | 0 | 0 | $297,537 | 885 | 0 |
| 06/30/2001 | MOSQUITO BAY | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $357,045 | N/A | N/A |
| 07/25/2001 | RACELAND | TEXAS EASTERN TRANSMISSION CORP (DUKE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $238,030 | N/A | N/A |
| 08/03/2001 | ST LANDRY | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $92,831 | N/A | N/A |
| 08/13/2001 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $142,818 | 0 | 0 | |
| 08/16/2001 | CENTRAL LOUISIANA ENERGY PIPELINE CO (CLEPCO) | CORROSION | 0 | 0 | $59,507 | 100 | 10 | |
| 08/22/2001 | KOCH PIPELINE COMPANY, L.P. AMMONIA | EXCAVATION DAMAGE | 0 | 0 | $238,030 | 258 | 258 | |
| 08/31/2001 | SOUTHERN NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $107,113 | N/A | N/A | |
| 09/03/2001 | EQUILON PIPELINE COMPANY LLC | EXCAVATION DAMAGE | 0 | 0 | $595,075 | 80 | 80 | |
| 09/03/2001 | FAIRBANKS | MID LOUISIANA GAS CO | CORROSION | 0 | 0 | $535,567 | N/A | N/A |
| 09/25/2001 | RINGGOLD | GULF SOUTH PIPELINE CO | CORROSION | 0 | 0 | $137,878 | N/A | N/A |
| 10/16/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $678,385 | N/A | N/A |
| 10/18/2001 | GULF OF MEXICO | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $327,291 | N/A | N/A |
| 10/24/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $146,388 | N/A | N/A |
| 12/06/2001 | MOSQUITO BAY MARSH | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $535,567 | N/A | N/A |
| 12/07/2001 | CALVIN | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $106,677 | N/A | N/A |
| 01/05/2002 | SULPHUR | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $90,048 | 100 | 10 |
| 01/08/2002 | SORRENTO | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,079,792 | 12 | 8 |
| 01/15/2002 | ERATH | EL PASO FIELD SERVICES | INCORRECT OPERATION | 0 | 0 | $81,862 | 3,000 | 3,000 |
| 02/15/2002 | PECAN ISLAND | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $769,089 | N/A | N/A |
| 02/22/2002 | PATTERSON | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $260,427 | 2 | 2 |
| 03/13/2002 | TERREBONNE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $237,020 | N/A | N/A |
| 04/02/2002 | ENTERPRISE PRODUCTS OPERATING LP | ALL OTHER CAUSES | 0 | 0 | $245,588 | 4 | 4 | |
| 04/06/2002 | BP PIPELINE (NORTH AMERICA) INC. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $13,172,149 | 1,800 | 571 | |
| 04/14/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $106,310 | N/A | N/A | |
| 04/16/2002 | ENTERPRISE PRODUCTS OPERATING LP | CORROSION | 0 | 0 | $61,397 | 8 | 8 | |
| 05/31/2002 | PATTERSON | ANR PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $2,339,992 | N/A | N/A |
| 06/01/2002 | FARMERVILLE | KOCH PIPELINE COMPANY, L.P. AMMONIA | NATURAL FORCE DAMAGE | 0 | 0 | $67,792 | 43 | 43 |
| 06/10/2002 | ZACHARY | DIXIE PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $808 | 47 | 47 |
| 06/28/2002 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $203,548 | N/A | N/A | |
| 07/23/2002 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $104,698 | N/A | N/A | |
| 07/24/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $288,920 | N/A | N/A | |
| 07/24/2002 | GULF OF MEXICO | ANR PIPELINE CO | CORROSION | 0 | 0 | $104,698 | N/A | N/A |
| 07/28/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,104 | N/A | N/A | |
| 08/14/2002 | SWEET LAKE | DYNEGY MIDSTREAM SERVICES, L.P. | EXCAVATION DAMAGE | 0 | 0 | $396,951 | 4,559 | 4,558 |
| 08/19/2002 | GULF OF MEXICO | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,392 | N/A | N/A |
| 08/20/2002 | CENTERVILLE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $140,536 | N/A | N/A |
| 08/30/2002 | PORT ALLEN | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,946 | 660 | 660 |
| 09/01/2002 | FARMERVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $167,380 | N/A | N/A |
| 10/03/2002 | COLUMBIA GULF TRANSMISSION CO | NATURAL FORCE DAMAGE | 0 | 0 | $1,754,200 | N/A | N/A | |
| 10/03/2002 | EXXON CO USA - NEW ORLEANS PRODUCTION ORGANIZATION | NATURAL FORCE DAMAGE | 0 | 0 | $350,840 | N/A | N/A | |
| 10/04/2002 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $6,990,365 | N/A | N/A | |
| 10/08/2002 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $142,766 | N/A | N/A |
| 12/12/2002 | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $713,423 | N/A | N/A | |
| 01/10/2003 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $128,144 | N/A | N/A |
| 01/10/2003 | LIVINGSTON | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $111,307 | N/A | N/A |
| 01/15/2003 | OAK GROVE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $96,616 | 37 | 0 |
| 01/22/2003 | INTERCOASTAL CITY | ACADIAN GAS PIPELINE SYSTEM | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $475,232 | N/A | N/A |
| 01/30/2003 | SHELL PIPELINE CO., L.P. | ALL OTHER CAUSES | 0 | 0 | $2,364,795 | 160 | 115 | |
| 02/12/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $245,149 | N/A | N/A | |
| 03/02/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,797,260 | 995 | 755 | |
| 03/03/2003 | TERREBONNE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $349,914 | N/A | N/A |
| 03/11/2003 | SHELL PIPELINE CO., L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $646,075 | 300 | 100 | |
| 03/31/2003 | YOUNGSVILLE | ENTEX, A NORAM ENERGY COMPANY (FORM. DIV OF ARKLA | EXCAVATION DAMAGE | 0 | 0 | $115,068 | N/A | N/A |
| 04/02/2003 | GULF MEXICO | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $216,503 | N/A | N/A |
| 05/08/2003 | LAFITTE | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $371,364 | N/A | N/A |
| 05/08/2003 | NAPOLEONVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $91,042 | N/A | N/A |
| 05/11/2003 | BIENVILLE | BEAR CREEK STORAGE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $358,387 | N/A | N/A |
| 06/03/2003 | NORTH HODGE | LOUISIANA GAS SERVICE CO | EXCAVATION DAMAGE | 0 | 2 | $3,452 | N/A | N/A |
| 07/19/2003 | LAFAYETTE | WILLIAMS OLEFINS FEEDSTOCK PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $506 | 25 | 25 |
| 07/21/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $316,438 | N/A | N/A | |
| 08/03/2003 | VENICE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $427,322 | N/A | N/A |
| 08/30/2003 | MIRE | LOUISIANA INTRASTATE GAS CO, L.L.C. | OTHER OUTSIDE FORCE DAMAGE | 0 | 1 | $36,278 | N/A | N/A |
| 09/13/2003 | BATON ROUGE | GULF STATES UTILITIES CO | EXCAVATION DAMAGE | 0 | 0 | $172,602 | N/A | N/A |
| 09/15/2003 | PLAQUEMINE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $3,586,155 | N/A | N/A |
| 09/15/2003 | PLAQUEMINE | SABINE GAS TRANSMISSION CO | ALL OTHER CAUSES | 0 | 0 | $4,833,129 | N/A | N/A |
| 09/22/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,307 | 37 | 37 | |
| 10/19/2003 | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $460,302 | 0 | 0 | |
| 10/22/2003 | BELLE CHASSE | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $489,041 | 0 | 0 |
| 12/02/2003 | EXXONMOBIL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,963,013 | 356 | 256 | |
| 12/02/2003 | MORGAN CITY | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $1,648,909 | N/A | N/A |
| 12/17/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $272,191 | N/A | N/A | |
| 12/26/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $94,147 | N/A | N/A | |
| 01/13/2004 | BATON ROUGE | ENTERGY GULF STATES INC | ALL OTHER CAUSES | 1 | 0 | $68,146 | N/A | N/A |
| 01/13/2004 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $98,987 | N/A | N/A |
| 01/14/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $452,779 | N/A | N/A | |
| 02/19/2004 | DESTREHAN | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $1,525,022 | 25 | 25 |
| 02/20/2004 | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $170,365 | 0 | 0 | |
| 04/20/2004 | VENICE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $94,438 | 0 | 0 |
| 05/03/2004 | BURAS | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $305,191 | 0 | 0 |
| 05/16/2004 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $238,949 | N/A | N/A | |
| 05/18/2004 | DONALDSONVILLE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $5,678 | 0 | 0 |
| 06/03/2004 | BELLE ROSE | ENTERPRISE PRODUCTS OPERATING LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,221 | 97 | 97 |
| 06/11/2004 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $705,930 | N/A | N/A |
| 06/23/2004 | ST JAMES | LOOP LLC | ALL OTHER CAUSES | 0 | 0 | $194,307 | 2 | 0 |
| 09/16/2004 | VENICE | CHEVRON PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $16,613,365 | 3,148 | 3,148 |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | N/A | N/A | |
| 09/16/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,816,896 | N/A | N/A | |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | N/A | N/A | |
| 09/17/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,451,529 | N/A | N/A | |
| 09/17/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $567,885 | N/A | N/A | |
| 10/05/2004 | JENA | ANR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $126,512 | N/A | N/A |
| 11/12/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $194,833 | N/A | N/A | |
| 12/25/2004 | TEXAS GAS TRANSMISSION LLC | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,124,448 | N/A | N/A | |
| 12/28/2004 | BAYOU PIGEON | ENTERPRISE PRODUCTS OPERATING L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $170,404 | 1 | 1 |
| 01/11/2005 | LONGWOOD | PLAINS PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $17,061 | 700 | 5 |
| 02/11/2005 | HOUMA | WILLIAMS GAS PIPELINES - TRANSCO | CORROSION | 0 | 0 | $790,611 | N/A | N/A |
| 02/15/2005 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $725,993 | N/A | N/A | |
| 03/23/2005 | TENNESSEE GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,788,512 | N/A | N/A | |
| 04/13/2005 | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $346,115 | N/A | N/A | |
| 04/16/2005 | SAINT JAMES | WILLIAMS GAS PIPELINE - TRANSCO | ALL OTHER CAUSES | 0 | 1 | $3,562 | N/A | N/A |
| 04/19/2005 | GRAND ISLE | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,644,011 | 600 | 49 |
| 05/26/2005 | DELHI | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $16,829,109 | N/A | N/A |
| 08/12/2005 | SOUTHERN NATURAL GAS | CORROSION | 0 | 0 | $111,546 | N/A | N/A | |
| 08/17/2005 | CENTERVILLE | PLAINS PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $325,779 | 7,562 | 2,262 |
| 08/29/2005 | GOLDEN MEADOW | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $3,899,843 | 1,276 | 367 |
| 08/29/2005 | NEW ORLEANS | ENTERGY NEW ORLEANS, INC - GAS DISTRIBUTION BUSINESS | NATURAL FORCE DAMAGE | 0 | 0 | $523,066,631 | N/A | N/A |
| 08/30/2005 | BURAS | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $168,263,031 | 23,614 | 0 |
| 08/30/2005 | EMPIRE | BP PIPELINES (NORTH AMERICA), INC. | ALL OTHER CAUSES | 0 | 0 | $943,450 | 50 | 0 |
| 08/30/2005 | PORT SULPHUR | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $72,919,274 | N/A | N/A |
| 08/30/2005 | CHALMETTE | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $171,898 | N/A | N/A |
| 08/30/2005 | POINTE A LA HACHE | GULF SOUTH PIPELINE, LP | NATURAL FORCE DAMAGE | 0 | 0 | $294,266 | N/A | N/A |
| 09/02/2005 | PILOTTOWN | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $21,060,916 | 25,435 | 4,855 |
| 09/02/2005 | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $17,061,871 | 3,245 | 3,245 | |
| 09/04/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $250,688 | N/A | N/A | |
| 09/04/2005 | ALGIERS | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $198,827 | N/A | N/A |
| 09/08/2005 | MERAUX | ATMOS ENERGY - LOUISIANA DIVISION | NATURAL FORCE DAMAGE | 0 | 0 | $2,180,577 | N/A | N/A |
| 09/09/2005 | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,465,822 | N/A | N/A | |
| 09/14/2005 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,175 | N/A | N/A | |
| 09/27/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $165,116 | N/A | N/A | |
| 09/30/2005 | FRANKLINTON | WASHINGTON PARISH GAS UTILITY DISTRICT #2 | NATURAL FORCE DAMAGE | 1 | 0 | $0 | N/A | N/A |
| 10/25/2005 | CENTERVILLE | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $280,981 | N/A | N/A |
| 11/22/2005 | RACELAND | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $652,860 | 50 | 0 |
| 12/03/2005 | HOLLY BEACH | BRIDGELINE HOLDINGS, L.P. | EXCAVATION DAMAGE | 0 | 0 | $138,739 | N/A | N/A |
| 12/09/2005 | EXXONMOBIL PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $4,487 | 150 | 0 | |
| 01/07/2006 | SHELL PIPELINE COMPANY LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $753,620 | 3 | 3 | |
| 01/27/2006 | HOUMA | TRANSCONTINENTAL GAS PIPE LINE COMPANY | CORROSION | 0 | 0 | $267,943 | N/A | N/A |
| 02/21/2006 | IBERVILLE | KANEB PIPE LINE OPERATING , L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $100,887 | 2 | 2 |
| 04/05/2006 | VIDALIA | ENBRIDGE PIPELINES (MIDLA) L.L.C. | ALL OTHER CAUSES | 0 | 1 | $1,051,642 | N/A | N/A |
| 04/12/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $266,097 | N/A | N/A | |
| 04/21/2006 | ABBEVILLE | TRUNKLINE GAS COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $11,235,785 | N/A | N/A |
| 04/24/2006 | EXXONMOBIL PIPELINE COMPANY | EXCAVATION DAMAGE | 0 | 0 | $350,274 | 0 | 0 | |
| 05/02/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $223,049 | N/A | N/A | |
| 06/20/2006 | BURAS | BP PIPELINES (NORTH AMERICA), INC. | EXCAVATION DAMAGE | 0 | 0 | $198,541 | 80 | 0 |
| 07/05/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $127,667 | N/A | N/A | |
| 07/19/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $318,431 | N/A | N/A | |
| 08/05/2006 | BATON ROUGE | PLANTATION PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $33,541 | 0 | 0 |
| 08/07/2006 | JENNINGS | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,005,181 | 5,743 | 5,743 |
| 08/07/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $498,658 | N/A | N/A | |
| 09/13/2006 | DELHI | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $263,351 | N/A | N/A |
| 09/16/2006 | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $239,192 | N/A | N/A | |
| 09/30/2006 | TEXAS EASTERN TRANSMISSION, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $270,740 | N/A | N/A | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $238,823 | N/A | N/A | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $1,061,437 | N/A | N/A | |
| 10/31/2006 | LAPLACE | LOUIS DREYFUS OLEFINS, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $122,600 | 0 | 0 |
| 11/02/2006 | SULPHUR | CONOCOPHILLIPS PIPE LINE CO. | CORROSION | 0 | 0 | $424,575 | 230 | 18 |
| 11/06/2006 | GOLDEN MEADOW | CROSSTEX LIG, LLC | CORROSION | 0 | 0 | $142,449 | N/A | N/A |
| 11/15/2006 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $95,677 | N/A | N/A |
| 11/30/2006 | ROMEVILLE | TRANSCONTINENTAL GAS PIPE LINE COMPANY | CORROSION | 0 | 0 | $1,274,801 | N/A | N/A |
| 12/19/2006 | SOUTHERN NATURAL GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $111,524 | N/A | N/A | |
| 12/29/2006 | EMPIRE | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $371,872 | N/A | N/A |
| 12/30/2006 | BRULY MCCALL | TEXACO PIPELINES LLC | ALL OTHER CAUSES | 0 | 0 | $73,837 | 198 | 198 |
| 01/15/2007 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $547,158 | N/A | N/A | |
| 01/31/2007 | BATON ROUGE | SHELL PIPELINE COMPANY LP | CORROSION | 0 | 0 | $727,476 | 20 | 20 |
| 03/09/2007 | MORGAN CITY | ACADIAN GAS PIPELINE SYSTEM | CORROSION | 0 | 0 | $361,652 | N/A | N/A |
| 05/25/2007 | DUBACH | MISSISSIPPI RIVER TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $0 | N/A | N/A |
| 06/14/2007 | EXXONMOBIL PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $71,676 | 97 | 97 | |
| 06/18/2007 | WHITE CASTLE | EXXONMOBIL PIPELINE COMPANY | CORROSION | 0 | 0 | $155,859 | 8 | 1 |
| 06/28/2007 | PORT SULPHUR | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $267,123 | N/A | N/A |
| 07/02/2007 | TURKEY CREEK | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 1 | 0 | $143,883 | N/A | N/A |
| 07/09/2007 | ANR PIPELINE COMPANY | CORROSION | 0 | 0 | $1,004,066 | N/A | N/A | |
| 07/25/2007 | RAVENSWOOD | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $623,935 | 403 | 10 |
| 08/03/2007 | SULPHUR | CHEVRON PETROCHEMICAL PIPELINE LLC (FORMERLY TEXACO PETROCHEMICAL PIPELINE LLC) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $83,090 | 10 | 10 |
| 08/03/2007 | SOUTHERN NATURAL GAS COMPANY | CORROSION | 0 | 0 | $11,684,272 | N/A | N/A | |
| 08/05/2007 | GOLDEN MEADOW | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $124,673 | N/A | N/A |
| 08/10/2007 | NAPOLEONVILLE | ACADIAN GAS PIPELINE SYSTEM | EXCAVATION DAMAGE | 0 | 0 | $144,502 | N/A | N/A |
| 08/29/2007 | DONNER | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $149,158 | N/A | N/A |
| 09/04/2007 | NORTHERN NATURAL GAS COMPANY | CORROSION | 0 | 0 | $477,881 | N/A | N/A | |
| 09/10/2007 | VENICE | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $125,926 | N/A | N/A |
| 10/14/2007 | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $495,305 | N/A | N/A | |
| 10/17/2007 | BASTROP | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $167,510 | N/A | N/A |
| 11/26/2007 | ANR PIPELINE CO | CORROSION | 0 | 0 | $853,465 | N/A | N/A | |
| 12/14/2007 | DELHI | COLUMBIA GULF TRANSMISSION CO | CORROSION | 1 | 0 | $3,170,623 | N/A | N/A |
| 01/16/2008 | BERWICK | SHELL PIPELINE CO., L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $756,300 | 265 | 70 |
| 03/08/2008 | STERLINGTON | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $297,500 | N/A | N/A |
| 03/13/2008 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $101,852 | 19 | 0 |
| 04/12/2008 | PORT SULPHUR | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $7,450,000 | N/A | N/A |
| 04/29/2008 | PORT ALLEN | BRIDGELINE HOLDINGS, LP | ALL OTHER CAUSES | 0 | 0 | $2,516,000 | N/A | N/A |
| 05/01/2008 | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $528,000 | N/A | N/A | |
| 06/08/2008 | PORT ALLEN | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $110,135 | 50 | 1 |
| 06/10/2008 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $575,000 | N/A | N/A |
| 06/13/2008 | RACELAND | EXXONMOBIL PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $22,510 | 65 | 0 |
| 06/27/2008 | EMPIRE | TEXACO PIPELINES, LLC | CORROSION | 0 | 0 | $260,000 | 424 | 424 |
| 07/14/2008 | ANR PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $232,500 | N/A | N/A | |
| 08/23/2008 | LAKE ARTHUR | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $42,500 | 200 | 150 |
| 09/03/2008 | RAYVILLE | TRUNKLINE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $168,238 | N/A | N/A |
| 09/04/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $7,160,000 | N/A | N/A |
| 09/08/2008 | LAROSE | WILLIAMS ENERGY, LLC | NATURAL FORCE DAMAGE | 0 | 0 | $36,820,000 | N/A | N/A |
| 09/14/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $248,171 | N/A | N/A | |
| 09/15/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,276,000 | N/A | N/A | |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,889,000 | N/A | N/A | |
| 09/16/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $6,886,709 | N/A | N/A |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,000,000 | N/A | N/A | |
| 09/17/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $7,700,000 | N/A | N/A |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $10,250,000 | N/A | N/A |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $150,000 | N/A | N/A |
| 09/23/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $3,750,000 | N/A | N/A |
| 10/01/2008 | ANR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $350,000 | N/A | N/A | |
| 10/03/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $470,000 | N/A | N/A | |
| 10/03/2008 | CAMERON | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $425,000 | N/A | N/A |
| 10/28/2008 | BELCHER | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $13,526 | N/A | N/A |
| 11/05/2008 | HAUGHTON | REGENCY INTRASTATE GAS LLC | EXCAVATION DAMAGE | 0 | 0 | $119,700 | N/A | N/A |
| 11/19/2008 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | ALL OTHER CAUSES | 0 | 0 | $101,990 | N/A | N/A |
| 11/30/2008 | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $180,100 | 10 | 1 | |
| 12/04/2008 | BURAS | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $298,875 | 10 | 5 |
| 12/05/2008 | ZACHARY | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $291,587 | 27 | 0 |
| Totals | 5 | 13 | $1,118,076,596 | 100,407 | 35,840 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/21/1999 | EMPIRE | CHEVRON PIPELINE CO | CORROSION | 0 | 0 | $186,390 | 5,000 | 20 |
| 06/16/1999 | CADDO | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $62,130 | 1,163 | 900 |
| 10/04/1999 | BELLE ROSE | BRIDGELINE GAS DISTRIBUTION LLC | ALL OTHER CAUSES | 0 | 0 | $0 | 231 | 231 |
| 10/18/1999 | PLAQUEMINES | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $497,041 | 100 | 100 |
| 11/24/1999 | FOUR BAYOU | CHEVRON PIPE LINE NORTHWEST REGION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,976,331 | 850 | 660 |
| 12/01/1999 | BRUSLY | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $8,698 | 200 | 20 |
| 12/07/1999 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | CORROSION | 0 | 0 | $31,065 | 100 | 0 |
| 01/14/2000 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $9,273 | 277 | 277 |
| 01/22/2000 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $146,160 | 1 | 1 | |
| 01/31/2000 | PLAQUEMINES | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $298,473 | 1 | 1 |
| 05/09/2000 | CAMERON | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $0 | 845 | 844 |
| 05/16/2000 | DYNEGY MIDSTREAM SERVICES INC | ALL OTHER CAUSES | 0 | 0 | $3,654 | 1 | 1 | |
| 10/27/2000 | PORT ALLEN | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $3,700 | 140 | 140 |
| 10/30/2000 | ST MARYS | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,827,000 | 940 | 940 |
| 11/15/2000 | MID - VALLEY PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,157,100 | 1,350 | 25 | |
| 11/24/2000 | HAYNESVILLE | MID - VALLEY PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,131,500 | 1,303 | 153 |
| 01/29/2001 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $1,011,627 | 475 | 60 | |
| 02/19/2001 | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $535,567 | 100 | 70 | |
| 04/14/2001 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES, L.P. | CORROSION | 0 | 0 | $6,545 | 42 | 42 |
| 06/24/2001 | CALCASIEU | CONOCO INC (AKA CONOCO PIPE LINE) | CORROSION | 0 | 0 | $297,537 | 885 | 0 |
| 08/13/2001 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $142,818 | 0 | 0 | |
| 08/16/2001 | CENTRAL LOUISIANA ENERGY PIPELINE CO (CLEPCO) | CORROSION | 0 | 0 | $59,507 | 100 | 10 | |
| 08/22/2001 | KOCH PIPELINE COMPANY, L.P. AMMONIA | EXCAVATION DAMAGE | 0 | 0 | $238,030 | 258 | 258 | |
| 09/03/2001 | EQUILON PIPELINE COMPANY LLC | EXCAVATION DAMAGE | 0 | 0 | $595,075 | 80 | 80 | |
| 01/05/2002 | SULPHUR | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $90,048 | 100 | 10 |
| 01/08/2002 | SORRENTO | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,079,792 | 12 | 8 |
| 01/15/2002 | ERATH | EL PASO FIELD SERVICES | INCORRECT OPERATION | 0 | 0 | $81,862 | 3,000 | 3,000 |
| 02/22/2002 | PATTERSON | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $260,427 | 2 | 2 |
| 04/02/2002 | ENTERPRISE PRODUCTS OPERATING LP | ALL OTHER CAUSES | 0 | 0 | $245,588 | 4 | 4 | |
| 04/06/2002 | BP PIPELINE (NORTH AMERICA) INC. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $13,172,149 | 1,800 | 571 | |
| 04/16/2002 | ENTERPRISE PRODUCTS OPERATING LP | CORROSION | 0 | 0 | $61,397 | 8 | 8 | |
| 06/01/2002 | FARMERVILLE | KOCH PIPELINE COMPANY, L.P. AMMONIA | NATURAL FORCE DAMAGE | 0 | 0 | $67,792 | 43 | 43 |
| 06/10/2002 | ZACHARY | DIXIE PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $808 | 47 | 47 |
| 08/14/2002 | SWEET LAKE | DYNEGY MIDSTREAM SERVICES, L.P. | EXCAVATION DAMAGE | 0 | 0 | $396,951 | 4,559 | 4,558 |
| 08/30/2002 | PORT ALLEN | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,946 | 660 | 660 |
| 01/15/2003 | OAK GROVE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $96,616 | 37 | 0 |
| 01/30/2003 | SHELL PIPELINE CO., L.P. | ALL OTHER CAUSES | 0 | 0 | $2,364,795 | 160 | 115 | |
| 03/02/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,797,260 | 995 | 755 | |
| 03/11/2003 | SHELL PIPELINE CO., L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $646,075 | 300 | 100 | |
| 07/19/2003 | LAFAYETTE | WILLIAMS OLEFINS FEEDSTOCK PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $506 | 25 | 25 |
| 09/22/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,307 | 37 | 37 | |
| 10/19/2003 | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $460,302 | 0 | 0 | |
| 10/22/2003 | BELLE CHASSE | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $489,041 | 0 | 0 |
| 12/02/2003 | EXXONMOBIL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,963,013 | 356 | 256 | |
| 02/19/2004 | DESTREHAN | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $1,525,022 | 25 | 25 |
| 02/20/2004 | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $170,365 | 0 | 0 | |
| 04/20/2004 | VENICE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $94,438 | 0 | 0 |
| 05/03/2004 | BURAS | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $305,191 | 0 | 0 |
| 05/18/2004 | DONALDSONVILLE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $5,678 | 0 | 0 |
| 06/03/2004 | BELLE ROSE | ENTERPRISE PRODUCTS OPERATING LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,221 | 97 | 97 |
| 06/23/2004 | ST JAMES | LOOP LLC | ALL OTHER CAUSES | 0 | 0 | $194,307 | 2 | 0 |
| 09/16/2004 | VENICE | CHEVRON PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $16,613,365 | 3,148 | 3,148 |
| 12/28/2004 | BAYOU PIGEON | ENTERPRISE PRODUCTS OPERATING L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $170,404 | 1 | 1 |
| 01/11/2005 | LONGWOOD | PLAINS PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $17,061 | 700 | 5 |
| 04/19/2005 | GRAND ISLE | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,644,011 | 600 | 49 |
| 08/17/2005 | CENTERVILLE | PLAINS PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $325,779 | 7,562 | 2,262 |
| 08/29/2005 | GOLDEN MEADOW | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $3,899,843 | 1,276 | 367 |
| 08/30/2005 | BURAS | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $168,263,031 | 23,614 | 0 |
| 08/30/2005 | EMPIRE | BP PIPELINES (NORTH AMERICA), INC. | ALL OTHER CAUSES | 0 | 0 | $943,450 | 50 | 0 |
| 09/02/2005 | PILOTTOWN | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $21,060,916 | 25,435 | 4,855 |
| 09/02/2005 | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $17,061,871 | 3,245 | 3,245 | |
| 11/22/2005 | RACELAND | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $652,860 | 50 | 0 |
| 12/09/2005 | EXXONMOBIL PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $4,487 | 150 | 0 | |
| 01/07/2006 | SHELL PIPELINE COMPANY LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $753,620 | 3 | 3 | |
| 02/21/2006 | IBERVILLE | KANEB PIPE LINE OPERATING , L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $100,887 | 2 | 2 |
| 04/24/2006 | EXXONMOBIL PIPELINE COMPANY | EXCAVATION DAMAGE | 0 | 0 | $350,274 | 0 | 0 | |
| 06/20/2006 | BURAS | BP PIPELINES (NORTH AMERICA), INC. | EXCAVATION DAMAGE | 0 | 0 | $198,541 | 80 | 0 |
| 08/05/2006 | BATON ROUGE | PLANTATION PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $33,541 | 0 | 0 |
| 08/07/2006 | JENNINGS | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,005,181 | 5,743 | 5,743 |
| 10/31/2006 | LAPLACE | LOUIS DREYFUS OLEFINS, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $122,600 | 0 | 0 |
| 11/02/2006 | SULPHUR | CONOCOPHILLIPS PIPE LINE CO. | CORROSION | 0 | 0 | $424,575 | 230 | 18 |
| 12/30/2006 | BRULY MCCALL | TEXACO PIPELINES LLC | ALL OTHER CAUSES | 0 | 0 | $73,837 | 198 | 198 |
| 01/31/2007 | BATON ROUGE | SHELL PIPELINE COMPANY LP | CORROSION | 0 | 0 | $727,476 | 20 | 20 |
| 06/14/2007 | EXXONMOBIL PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $71,676 | 97 | 97 | |
| 06/18/2007 | WHITE CASTLE | EXXONMOBIL PIPELINE COMPANY | CORROSION | 0 | 0 | $155,859 | 8 | 1 |
| 07/25/2007 | RAVENSWOOD | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $623,935 | 403 | 10 |
| 08/03/2007 | SULPHUR | CHEVRON PETROCHEMICAL PIPELINE LLC (FORMERLY TEXACO PETROCHEMICAL PIPELINE LLC) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $83,090 | 10 | 10 |
| 01/16/2008 | BERWICK | SHELL PIPELINE CO., L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $756,300 | 265 | 70 |
| 03/13/2008 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $101,852 | 19 | 0 |
| 06/08/2008 | PORT ALLEN | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $110,135 | 50 | 1 |
| 06/13/2008 | RACELAND | EXXONMOBIL PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $22,510 | 65 | 0 |
| 06/27/2008 | EMPIRE | TEXACO PIPELINES, LLC | CORROSION | 0 | 0 | $260,000 | 424 | 424 |
| 08/23/2008 | LAKE ARTHUR | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $42,500 | 200 | 150 |
| 11/30/2008 | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $180,100 | 10 | 1 | |
| 12/04/2008 | BURAS | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $298,875 | 10 | 5 |
| 12/05/2008 | ZACHARY | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $291,587 | 27 | 0 |
| Totals | 0 | 0 | $281,361,180 | 100,407 | 35,840 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 01/21/1999 | EMPIRE | CHEVRON PIPELINE CO | CORROSION | 0 | 0 | $186,390 | 5,000 | 20 |
| 06/16/1999 | CADDO | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $62,130 | 1,163 | 900 |
| 10/04/1999 | BELLE ROSE | BRIDGELINE GAS DISTRIBUTION LLC | ALL OTHER CAUSES | 0 | 0 | $0 | 231 | 231 |
| 10/18/1999 | PLAQUEMINES | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $497,041 | 100 | 100 |
| 12/01/1999 | BRUSLY | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $8,698 | 200 | 20 |
| 12/07/1999 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | CORROSION | 0 | 0 | $31,065 | 100 | 0 |
| 01/14/2000 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $9,273 | 277 | 277 |
| 01/22/2000 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $146,160 | 1 | 1 | |
| 01/31/2000 | PLAQUEMINES | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $298,473 | 1 | 1 |
| 05/09/2000 | CAMERON | DYNEGY MIDSTREAM SERVICES INC | CORROSION | 0 | 0 | $0 | 845 | 844 |
| 05/16/2000 | DYNEGY MIDSTREAM SERVICES INC | ALL OTHER CAUSES | 0 | 0 | $3,654 | 1 | 1 | |
| 10/27/2000 | PORT ALLEN | EXXON PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $3,700 | 140 | 140 |
| 10/30/2000 | ST MARYS | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,827,000 | 940 | 940 |
| 11/15/2000 | MID - VALLEY PIPELINE COMPANY | ALL OTHER CAUSES | 0 | 0 | $1,157,100 | 1,350 | 25 | |
| 11/24/2000 | HAYNESVILLE | MID - VALLEY PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,131,500 | 1,303 | 153 |
| 01/29/2001 | EQUILON PIPELINE COMPANY LLC | ALL OTHER CAUSES | 0 | 0 | $1,011,627 | 475 | 60 | |
| 02/19/2001 | TE PRODUCTS PIPELINE CO., LP | CORROSION | 0 | 0 | $535,567 | 100 | 70 | |
| 04/14/2001 | PLAQUEMINES | DYNEGY MIDSTREAM SERVICES, L.P. | CORROSION | 0 | 0 | $6,545 | 42 | 42 |
| 06/24/2001 | CALCASIEU | CONOCO INC (AKA CONOCO PIPE LINE) | CORROSION | 0 | 0 | $297,537 | 885 | 0 |
| 08/16/2001 | CENTRAL LOUISIANA ENERGY PIPELINE CO (CLEPCO) | CORROSION | 0 | 0 | $59,507 | 100 | 10 | |
| 08/22/2001 | KOCH PIPELINE COMPANY, L.P. AMMONIA | EXCAVATION DAMAGE | 0 | 0 | $238,030 | 258 | 258 | |
| 09/03/2001 | EQUILON PIPELINE COMPANY LLC | EXCAVATION DAMAGE | 0 | 0 | $595,075 | 80 | 80 | |
| 01/05/2002 | SULPHUR | CONOCO INC (AKA CONOCO PIPE LINE) | INCORRECT OPERATION | 0 | 0 | $90,048 | 100 | 10 |
| 01/08/2002 | SORRENTO | MARATHON ASHLAND PIPE LINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,079,792 | 12 | 8 |
| 01/15/2002 | ERATH | EL PASO FIELD SERVICES | INCORRECT OPERATION | 0 | 0 | $81,862 | 3,000 | 3,000 |
| 02/22/2002 | PATTERSON | EQUILON PIPELINE COMPANY LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $260,427 | 2 | 2 |
| 04/02/2002 | ENTERPRISE PRODUCTS OPERATING LP | ALL OTHER CAUSES | 0 | 0 | $245,588 | 4 | 4 | |
| 04/06/2002 | BP PIPELINE (NORTH AMERICA) INC. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $13,172,149 | 1,800 | 571 | |
| 04/16/2002 | ENTERPRISE PRODUCTS OPERATING LP | CORROSION | 0 | 0 | $61,397 | 8 | 8 | |
| 06/01/2002 | FARMERVILLE | KOCH PIPELINE COMPANY, L.P. AMMONIA | NATURAL FORCE DAMAGE | 0 | 0 | $67,792 | 43 | 43 |
| 06/10/2002 | ZACHARY | DIXIE PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $808 | 47 | 47 |
| 08/14/2002 | SWEET LAKE | DYNEGY MIDSTREAM SERVICES, L.P. | EXCAVATION DAMAGE | 0 | 0 | $396,951 | 4,559 | 4,558 |
| 08/30/2002 | PORT ALLEN | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,946 | 660 | 660 |
| 01/15/2003 | OAK GROVE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $96,616 | 37 | 0 |
| 01/30/2003 | SHELL PIPELINE CO., L.P. | ALL OTHER CAUSES | 0 | 0 | $2,364,795 | 160 | 115 | |
| 03/02/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,797,260 | 995 | 755 | |
| 03/11/2003 | SHELL PIPELINE CO., L.P. | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $646,075 | 300 | 100 | |
| 07/19/2003 | LAFAYETTE | WILLIAMS OLEFINS FEEDSTOCK PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $506 | 25 | 25 |
| 09/22/2003 | EXXONMOBILE PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,307 | 37 | 37 | |
| 10/19/2003 | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $460,302 | 0 | 0 | |
| 10/22/2003 | BELLE CHASSE | ENBRIDGE PIPELINES (LOUISIANA LIQUIDS) LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $489,041 | 0 | 0 |
| 12/02/2003 | EXXONMOBIL PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,963,013 | 356 | 256 | |
| 02/19/2004 | DESTREHAN | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $1,525,022 | 25 | 25 |
| 02/20/2004 | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $170,365 | 0 | 0 | |
| 04/20/2004 | VENICE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $94,438 | 0 | 0 |
| 05/03/2004 | BURAS | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $305,191 | 0 | 0 |
| 05/18/2004 | DONALDSONVILLE | CHEVRON PIPE LINE CO | ALL OTHER CAUSES | 0 | 0 | $5,678 | 0 | 0 |
| 06/03/2004 | BELLE ROSE | ENTERPRISE PRODUCTS OPERATING LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $2,221 | 97 | 97 |
| 06/23/2004 | ST JAMES | LOOP LLC | ALL OTHER CAUSES | 0 | 0 | $194,307 | 2 | 0 |
| 09/16/2004 | VENICE | CHEVRON PIPE LINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $16,613,365 | 3,148 | 3,148 |
| 12/28/2004 | BAYOU PIGEON | ENTERPRISE PRODUCTS OPERATING L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $170,404 | 1 | 1 |
| 01/11/2005 | LONGWOOD | PLAINS PIPELINE LP | EXCAVATION DAMAGE | 0 | 0 | $17,061 | 700 | 5 |
| 04/19/2005 | GRAND ISLE | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,644,011 | 600 | 49 |
| 08/17/2005 | CENTERVILLE | PLAINS PIPELINE, L.P. | INCORRECT OPERATION | 0 | 0 | $325,779 | 7,562 | 2,262 |
| 08/29/2005 | GOLDEN MEADOW | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $3,899,843 | 1,276 | 367 |
| 08/30/2005 | BURAS | CHEVRON PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $168,263,031 | 23,614 | 0 |
| 08/30/2005 | EMPIRE | BP PIPELINES (NORTH AMERICA), INC. | ALL OTHER CAUSES | 0 | 0 | $943,450 | 50 | 0 |
| 09/02/2005 | PILOTTOWN | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $21,060,916 | 25,435 | 4,855 |
| 09/02/2005 | SHELL PIPELINE COMPANY LP | NATURAL FORCE DAMAGE | 0 | 0 | $17,061,871 | 3,245 | 3,245 | |
| 11/22/2005 | RACELAND | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $652,860 | 50 | 0 |
| 12/09/2005 | EXXONMOBIL PIPELINE COMPANY | INCORRECT OPERATION | 0 | 0 | $4,487 | 150 | 0 | |
| 01/07/2006 | SHELL PIPELINE COMPANY LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $753,620 | 3 | 3 | |
| 02/21/2006 | IBERVILLE | KANEB PIPE LINE OPERATING , L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $100,887 | 2 | 2 |
| 04/24/2006 | EXXONMOBIL PIPELINE COMPANY | EXCAVATION DAMAGE | 0 | 0 | $350,274 | 0 | 0 | |
| 06/20/2006 | BURAS | BP PIPELINES (NORTH AMERICA), INC. | EXCAVATION DAMAGE | 0 | 0 | $198,541 | 80 | 0 |
| 08/05/2006 | BATON ROUGE | PLANTATION PIPE LINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $33,541 | 0 | 0 |
| 08/07/2006 | JENNINGS | TEXACO PETROCHEMICAL PIPELINE LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $1,005,181 | 5,743 | 5,743 |
| 10/31/2006 | LAPLACE | LOUIS DREYFUS OLEFINS, LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $122,600 | 0 | 0 |
| 11/02/2006 | SULPHUR | CONOCOPHILLIPS PIPE LINE CO. | CORROSION | 0 | 0 | $424,575 | 230 | 18 |
| 12/30/2006 | BRULY MCCALL | TEXACO PIPELINES LLC | ALL OTHER CAUSES | 0 | 0 | $73,837 | 198 | 198 |
| 01/31/2007 | BATON ROUGE | SHELL PIPELINE COMPANY LP | CORROSION | 0 | 0 | $727,476 | 20 | 20 |
| 06/14/2007 | EXXONMOBIL PIPELINE COMPANY | NATURAL FORCE DAMAGE | 0 | 0 | $71,676 | 97 | 97 | |
| 06/18/2007 | WHITE CASTLE | EXXONMOBIL PIPELINE COMPANY | CORROSION | 0 | 0 | $155,859 | 8 | 1 |
| 07/25/2007 | RAVENSWOOD | EXXONMOBIL PIPELINE COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $623,935 | 403 | 10 |
| 08/03/2007 | SULPHUR | CHEVRON PETROCHEMICAL PIPELINE LLC (FORMERLY TEXACO PETROCHEMICAL PIPELINE LLC) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $83,090 | 10 | 10 |
| 01/16/2008 | BERWICK | SHELL PIPELINE CO., L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $756,300 | 265 | 70 |
| 03/13/2008 | SULPHUR | CITGO PETROLEUM CORPORATION (REFINERY) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $101,852 | 19 | 0 |
| 06/08/2008 | PORT ALLEN | EXXONMOBIL PIPELINE CO | CORROSION | 0 | 0 | $110,135 | 50 | 1 |
| 06/13/2008 | RACELAND | EXXONMOBIL PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $22,510 | 65 | 0 |
| 06/27/2008 | EMPIRE | TEXACO PIPELINES, LLC | CORROSION | 0 | 0 | $260,000 | 424 | 424 |
| 08/23/2008 | LAKE ARTHUR | PLAINS MARKETING, L.P. | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $42,500 | 200 | 150 |
| 11/30/2008 | SHELL PIPELINE CO., L.P. | CORROSION | 0 | 0 | $180,100 | 10 | 1 | |
| 12/04/2008 | BURAS | PLAINS PIPELINE, L.P. | CORROSION | 0 | 0 | $298,875 | 10 | 5 |
| 12/05/2008 | ZACHARY | MARATHON PIPE LINE LLC | INCORRECT OPERATION | 0 | 0 | $291,587 | 27 | 0 |
| Totals | 0 | 0 | $277,242,030 | 99,557 | 35,180 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) | Gross Barrels Lost | Net Barrels Lost (E) |
|---|---|---|---|---|---|---|---|---|
| 11/24/1999 | FOUR BAYOU | CHEVRON PIPE LINE NORTHWEST REGION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $3,976,331 | 850 | 660 |
| 08/13/2001 | CHEVRON PIPE LINE NORTHWEST REGION | CORROSION | 0 | 0 | $142,818 | 0 | 0 | |
| Totals | 0 | 0 | $4,119,149 | 850 | 660 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/17/1999 | WEST CAMERON BLOCK 630 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $434,911 |
| 01/30/1999 | MONTICELLO | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $205,029 |
| 08/15/1999 | VENICE | MID LOUISIANA GAS CO | EXCAVATION DAMAGE | 0 | 0 | $124,260 |
| 09/25/1999 | SEA ROBIN PIPELINE CO | CORROSION | 0 | 0 | $248,520 | |
| 02/01/2000 | WEST MONROE | TENNESSEE GAS PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $231,420 |
| 04/24/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $96,222 | |
| 04/26/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,700 | |
| 06/17/2000 | TENNESSEE GAS PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $730,800 | |
| 07/05/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $121,800 | |
| 07/05/2000 | PLAQUEMINES | SOUTHERN NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 5 | $609,000 |
| 08/19/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $144,942 | |
| 09/29/2000 | MADISON | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $304,500 |
| 11/23/2000 | POLLOCK | TRUNKLINE GAS CO | ALL OTHER CAUSES | 0 | 0 | $1,096,200 |
| 04/27/2001 | EUNICE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $535,567 |
| 05/13/2001 | SEA ROBIN PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $749,794 | |
| 07/25/2001 | RACELAND | TEXAS EASTERN TRANSMISSION CORP (DUKE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $238,030 |
| 08/03/2001 | ST LANDRY | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $92,831 |
| 08/31/2001 | SOUTHERN NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $107,113 | |
| 09/03/2001 | FAIRBANKS | MID LOUISIANA GAS CO | CORROSION | 0 | 0 | $535,567 |
| 09/25/2001 | RINGGOLD | GULF SOUTH PIPELINE CO | CORROSION | 0 | 0 | $137,878 |
| 10/16/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $678,385 |
| 10/18/2001 | GULF OF MEXICO | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $327,291 |
| 10/24/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $146,388 |
| 12/07/2001 | CALVIN | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $106,677 |
| 04/14/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $106,310 | |
| 05/31/2002 | PATTERSON | ANR PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $2,339,992 |
| 06/28/2002 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $203,548 | |
| 07/23/2002 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $104,698 | |
| 07/24/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $288,920 | |
| 07/24/2002 | GULF OF MEXICO | ANR PIPELINE CO | CORROSION | 0 | 0 | $104,698 |
| 07/28/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,104 | |
| 08/19/2002 | GULF OF MEXICO | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,392 |
| 08/20/2002 | CENTERVILLE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $140,536 |
| 09/01/2002 | FARMERVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $167,380 |
| 10/03/2002 | COLUMBIA GULF TRANSMISSION CO | NATURAL FORCE DAMAGE | 0 | 0 | $1,754,200 | |
| 10/04/2002 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $6,990,365 | |
| 10/08/2002 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $142,766 |
| 12/12/2002 | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $713,423 | |
| 01/10/2003 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $128,144 |
| 01/10/2003 | LIVINGSTON | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $111,307 |
| 01/22/2003 | INTERCOASTAL CITY | ACADIAN GAS PIPELINE SYSTEM | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $475,232 |
| 02/12/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $245,149 | |
| 03/03/2003 | TERREBONNE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $349,914 |
| 04/02/2003 | GULF MEXICO | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $216,503 |
| 05/08/2003 | LAFITTE | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $371,364 |
| 05/08/2003 | NAPOLEONVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $91,042 |
| 05/11/2003 | BIENVILLE | BEAR CREEK STORAGE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $358,387 |
| 07/21/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $316,438 | |
| 08/03/2003 | VENICE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $427,322 |
| 08/30/2003 | MIRE | LOUISIANA INTRASTATE GAS CO, L.L.C. | OTHER OUTSIDE FORCE DAMAGE | 0 | 1 | $36,278 |
| 09/15/2003 | PLAQUEMINE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $3,586,155 |
| 09/15/2003 | PLAQUEMINE | SABINE GAS TRANSMISSION CO | ALL OTHER CAUSES | 0 | 0 | $4,833,129 |
| 12/02/2003 | MORGAN CITY | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $1,648,909 |
| 12/17/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $272,191 | |
| 12/26/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $94,147 | |
| 01/13/2004 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $98,987 |
| 01/14/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $452,779 | |
| 05/16/2004 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $238,949 | |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | |
| 09/16/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,816,896 | |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | |
| 09/17/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,451,529 | |
| 09/17/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $567,885 | |
| 10/05/2004 | JENA | ANR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $126,512 |
| 11/12/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $194,833 | |
| 12/25/2004 | TEXAS GAS TRANSMISSION LLC | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,124,448 | |
| 02/15/2005 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $725,993 | |
| 03/23/2005 | TENNESSEE GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,788,512 | |
| 04/13/2005 | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $346,115 | |
| 04/16/2005 | SAINT JAMES | WILLIAMS GAS PIPELINE - TRANSCO | ALL OTHER CAUSES | 0 | 1 | $3,562 |
| 05/26/2005 | DELHI | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $16,829,109 |
| 08/12/2005 | SOUTHERN NATURAL GAS | CORROSION | 0 | 0 | $111,546 | |
| 08/30/2005 | PORT SULPHUR | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $72,919,274 |
| 08/30/2005 | CHALMETTE | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $171,898 |
| 08/30/2005 | POINTE A LA HACHE | GULF SOUTH PIPELINE, LP | NATURAL FORCE DAMAGE | 0 | 0 | $294,266 |
| 09/04/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $250,688 | |
| 09/04/2005 | ALGIERS | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $198,827 |
| 09/09/2005 | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,465,822 | |
| 09/14/2005 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,175 | |
| 09/27/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $165,116 | |
| 10/25/2005 | CENTERVILLE | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $280,981 |
| 12/03/2005 | HOLLY BEACH | BRIDGELINE HOLDINGS, L.P. | EXCAVATION DAMAGE | 0 | 0 | $138,739 |
| 04/05/2006 | VIDALIA | ENBRIDGE PIPELINES (MIDLA) L.L.C. | ALL OTHER CAUSES | 0 | 1 | $1,051,642 |
| 04/12/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $266,097 | |
| 04/21/2006 | ABBEVILLE | TRUNKLINE GAS COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $11,235,785 |
| 05/02/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $223,049 | |
| 07/05/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $127,667 | |
| 07/19/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $318,431 | |
| 08/07/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $498,658 | |
| 09/13/2006 | DELHI | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $263,351 |
| 09/16/2006 | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $239,192 | |
| 09/30/2006 | TEXAS EASTERN TRANSMISSION, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $270,740 | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $238,823 | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $1,061,437 | |
| 11/06/2006 | GOLDEN MEADOW | CROSSTEX LIG, LLC | CORROSION | 0 | 0 | $142,449 |
| 11/15/2006 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $95,677 |
| 11/30/2006 | ROMEVILLE | TRANSCONTINENTAL GAS PIPE LINE COMPANY | CORROSION | 0 | 0 | $1,274,801 |
| 12/19/2006 | SOUTHERN NATURAL GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $111,524 | |
| 12/29/2006 | EMPIRE | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $371,872 |
| 01/15/2007 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $547,158 | |
| 03/09/2007 | MORGAN CITY | ACADIAN GAS PIPELINE SYSTEM | CORROSION | 0 | 0 | $361,652 |
| 05/25/2007 | DUBACH | MISSISSIPPI RIVER TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $0 |
| 06/28/2007 | PORT SULPHUR | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $267,123 |
| 07/02/2007 | TURKEY CREEK | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 1 | 0 | $143,883 |
| 07/09/2007 | ANR PIPELINE COMPANY | CORROSION | 0 | 0 | $1,004,066 | |
| 08/03/2007 | SOUTHERN NATURAL GAS COMPANY | CORROSION | 0 | 0 | $11,684,272 | |
| 08/05/2007 | GOLDEN MEADOW | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $124,673 |
| 08/10/2007 | NAPOLEONVILLE | ACADIAN GAS PIPELINE SYSTEM | EXCAVATION DAMAGE | 0 | 0 | $144,502 |
| 08/29/2007 | DONNER | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $149,158 |
| 09/10/2007 | VENICE | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $125,926 |
| 10/14/2007 | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $495,305 | |
| 10/17/2007 | BASTROP | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $167,510 |
| 11/26/2007 | ANR PIPELINE CO | CORROSION | 0 | 0 | $853,465 | |
| 12/14/2007 | DELHI | COLUMBIA GULF TRANSMISSION CO | CORROSION | 1 | 0 | $3,170,623 |
| 03/08/2008 | STERLINGTON | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $297,500 |
| 04/12/2008 | PORT SULPHUR | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $7,450,000 |
| 04/29/2008 | PORT ALLEN | BRIDGELINE HOLDINGS, LP | ALL OTHER CAUSES | 0 | 0 | $2,516,000 |
| 05/01/2008 | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $528,000 | |
| 07/14/2008 | ANR PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $232,500 | |
| 09/03/2008 | RAYVILLE | TRUNKLINE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $168,238 |
| 09/04/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $7,160,000 |
| 09/14/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $248,171 | |
| 09/15/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,276,000 | |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,889,000 | |
| 09/16/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $6,886,709 |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,000,000 | |
| 09/17/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $7,700,000 |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $10,250,000 |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $150,000 |
| 09/23/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $3,750,000 |
| 10/01/2008 | ANR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $350,000 | |
| 10/03/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $470,000 | |
| 10/03/2008 | CAMERON | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $425,000 |
| 10/28/2008 | BELCHER | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $13,526 |
| 11/05/2008 | HAUGHTON | REGENCY INTRASTATE GAS LLC | EXCAVATION DAMAGE | 0 | 0 | $119,700 |
| Totals | 2 | 10 | $257,734,127 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/30/1999 | MONTICELLO | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $205,029 |
| 08/15/1999 | VENICE | MID LOUISIANA GAS CO | EXCAVATION DAMAGE | 0 | 0 | $124,260 |
| 02/01/2000 | WEST MONROE | TENNESSEE GAS PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $231,420 |
| 07/05/2000 | PLAQUEMINES | SOUTHERN NATURAL GAS CO | EXCAVATION DAMAGE | 0 | 5 | $609,000 |
| 09/29/2000 | MADISON | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $304,500 |
| 11/23/2000 | POLLOCK | TRUNKLINE GAS CO | ALL OTHER CAUSES | 0 | 0 | $1,096,200 |
| 04/27/2001 | EUNICE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $535,567 |
| 07/25/2001 | RACELAND | TEXAS EASTERN TRANSMISSION CORP (DUKE) | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $238,030 |
| 08/03/2001 | ST LANDRY | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $92,831 |
| 08/31/2001 | SOUTHERN NATURAL GAS CO | ALL OTHER CAUSES | 0 | 0 | $107,113 | |
| 09/03/2001 | FAIRBANKS | MID LOUISIANA GAS CO | CORROSION | 0 | 0 | $535,567 |
| 09/25/2001 | RINGGOLD | GULF SOUTH PIPELINE CO | CORROSION | 0 | 0 | $137,878 |
| 10/16/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $678,385 |
| 12/07/2001 | CALVIN | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $106,677 |
| 05/31/2002 | PATTERSON | ANR PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $2,339,992 |
| 06/28/2002 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $203,548 | |
| 08/20/2002 | CENTERVILLE | MARATHON ASHLAND PIPE LINE LLC | ALL OTHER CAUSES | 0 | 0 | $140,536 |
| 09/01/2002 | FARMERVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $167,380 |
| 10/08/2002 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $142,766 |
| 01/10/2003 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $128,144 |
| 01/10/2003 | LIVINGSTON | GULF SOUTH PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $111,307 |
| 01/22/2003 | INTERCOASTAL CITY | ACADIAN GAS PIPELINE SYSTEM | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $475,232 |
| 05/08/2003 | LAFITTE | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $371,364 |
| 05/08/2003 | NAPOLEONVILLE | GULF SOUTH PIPELINE COMPANY, LP | CORROSION | 0 | 0 | $91,042 |
| 05/11/2003 | BIENVILLE | BEAR CREEK STORAGE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $358,387 |
| 08/30/2003 | MIRE | LOUISIANA INTRASTATE GAS CO, L.L.C. | OTHER OUTSIDE FORCE DAMAGE | 0 | 1 | $36,278 |
| 09/15/2003 | PLAQUEMINE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $3,586,155 |
| 09/15/2003 | PLAQUEMINE | SABINE GAS TRANSMISSION CO | ALL OTHER CAUSES | 0 | 0 | $4,833,129 |
| 12/17/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $272,191 | |
| 01/13/2004 | PORT SULPHUR | TENNESSEE GAS PIPELINE CO | INCORRECT OPERATION | 0 | 0 | $98,987 |
| 10/05/2004 | JENA | ANR PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $126,512 |
| 12/25/2004 | TEXAS GAS TRANSMISSION LLC | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,124,448 | |
| 04/16/2005 | SAINT JAMES | WILLIAMS GAS PIPELINE - TRANSCO | ALL OTHER CAUSES | 0 | 1 | $3,562 |
| 05/26/2005 | DELHI | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $16,829,109 |
| 08/12/2005 | SOUTHERN NATURAL GAS | CORROSION | 0 | 0 | $111,546 | |
| 08/30/2005 | PORT SULPHUR | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $72,919,274 |
| 08/30/2005 | CHALMETTE | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $171,898 |
| 08/30/2005 | POINTE A LA HACHE | GULF SOUTH PIPELINE, LP | NATURAL FORCE DAMAGE | 0 | 0 | $294,266 |
| 09/04/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $250,688 | |
| 09/04/2005 | ALGIERS | GULF SOUTH PIPELINE COMPANY, LP | NATURAL FORCE DAMAGE | 0 | 0 | $198,827 |
| 09/27/2005 | TENNESSEE GAS PIPELINE | NATURAL FORCE DAMAGE | 0 | 0 | $165,116 | |
| 10/25/2005 | CENTERVILLE | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $280,981 |
| 12/03/2005 | HOLLY BEACH | BRIDGELINE HOLDINGS, L.P. | EXCAVATION DAMAGE | 0 | 0 | $138,739 |
| 04/05/2006 | VIDALIA | ENBRIDGE PIPELINES (MIDLA) L.L.C. | ALL OTHER CAUSES | 0 | 1 | $1,051,642 |
| 04/21/2006 | ABBEVILLE | TRUNKLINE GAS COMPANY | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $11,235,785 |
| 09/13/2006 | DELHI | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $263,351 |
| 11/06/2006 | GOLDEN MEADOW | CROSSTEX LIG, LLC | CORROSION | 0 | 0 | $142,449 |
| 11/15/2006 | RESERVE | BRIDGELINE GAS DISTRIBUTION LLC | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $95,677 |
| 11/30/2006 | ROMEVILLE | TRANSCONTINENTAL GAS PIPE LINE COMPANY | CORROSION | 0 | 0 | $1,274,801 |
| 12/29/2006 | EMPIRE | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $371,872 |
| 03/09/2007 | MORGAN CITY | ACADIAN GAS PIPELINE SYSTEM | CORROSION | 0 | 0 | $361,652 |
| 05/25/2007 | DUBACH | MISSISSIPPI RIVER TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $0 |
| 06/28/2007 | PORT SULPHUR | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $267,123 |
| 07/02/2007 | TURKEY CREEK | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 1 | 0 | $143,883 |
| 08/03/2007 | SOUTHERN NATURAL GAS COMPANY | CORROSION | 0 | 0 | $11,684,272 | |
| 08/10/2007 | NAPOLEONVILLE | ACADIAN GAS PIPELINE SYSTEM | EXCAVATION DAMAGE | 0 | 0 | $144,502 |
| 08/29/2007 | DONNER | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $149,158 |
| 10/17/2007 | BASTROP | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $167,510 |
| 12/14/2007 | DELHI | COLUMBIA GULF TRANSMISSION CO | CORROSION | 1 | 0 | $3,170,623 |
| 03/08/2008 | STERLINGTON | TEXAS GAS TRANSMISSION LLC | ALL OTHER CAUSES | 0 | 0 | $297,500 |
| 04/12/2008 | PORT SULPHUR | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $7,450,000 |
| 04/29/2008 | PORT ALLEN | BRIDGELINE HOLDINGS, LP | ALL OTHER CAUSES | 0 | 0 | $2,516,000 |
| 09/03/2008 | RAYVILLE | TRUNKLINE GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $168,238 |
| 10/28/2008 | BELCHER | CENTERPOINT ENERGY GAS TRANSMISSION | INCORRECT OPERATION | 0 | 1 | $13,526 |
| 11/05/2008 | HAUGHTON | REGENCY INTRASTATE GAS LLC | EXCAVATION DAMAGE | 0 | 0 | $119,700 |
| Totals | 2 | 10 | $152,063,152 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/17/1999 | WEST CAMERON BLOCK 630 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $434,911 |
| 09/25/1999 | SEA ROBIN PIPELINE CO | CORROSION | 0 | 0 | $248,520 | |
| 04/24/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $96,222 | |
| 04/26/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,700 | |
| 06/17/2000 | TENNESSEE GAS PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $730,800 | |
| 07/05/2000 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $121,800 | |
| 08/19/2000 | ANR PIPELINE CO | CORROSION | 0 | 0 | $144,942 | |
| 05/13/2001 | SEA ROBIN PIPELINE CO | EXCAVATION DAMAGE | 0 | 0 | $749,794 | |
| 10/18/2001 | GULF OF MEXICO | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $327,291 |
| 10/24/2001 | OFFSHORE | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $146,388 |
| 04/14/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $106,310 | |
| 07/23/2002 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $104,698 | |
| 07/24/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $288,920 | |
| 07/24/2002 | GULF OF MEXICO | ANR PIPELINE CO | CORROSION | 0 | 0 | $104,698 |
| 07/28/2002 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $182,104 | |
| 08/19/2002 | GULF OF MEXICO | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $116,392 |
| 10/03/2002 | COLUMBIA GULF TRANSMISSION CO | NATURAL FORCE DAMAGE | 0 | 0 | $1,754,200 | |
| 10/04/2002 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $6,990,365 | |
| 12/12/2002 | SOUTHERN NATURAL GAS CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $713,423 | |
| 02/12/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $245,149 | |
| 03/03/2003 | TERREBONNE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $349,914 |
| 04/02/2003 | GULF MEXICO | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $216,503 |
| 07/21/2003 | COLUMBIA GULF TRANSMISSION CO | CORROSION | 0 | 0 | $316,438 | |
| 08/03/2003 | VENICE | TEXAS EASTERN TRANSMISSION CORP (DUKE) | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $427,322 |
| 12/02/2003 | MORGAN CITY | GULF SOUTH PIPELINE COMPANY, LP | EXCAVATION DAMAGE | 0 | 0 | $1,648,909 |
| 12/26/2003 | ANR PIPELINE CO | CORROSION | 0 | 0 | $94,147 | |
| 01/14/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $452,779 | |
| 05/16/2004 | TENNESSEE GAS PIPELINE CO | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $238,949 | |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | |
| 09/16/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,816,896 | |
| 09/16/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $2,922,504 | |
| 09/17/2004 | TENNESSEE GAS PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,451,529 | |
| 09/17/2004 | SOUTHERN NATURAL GAS CO | NATURAL FORCE DAMAGE | 0 | 0 | $567,885 | |
| 11/12/2004 | TENNESSEE GAS PIPELINE CO | CORROSION | 0 | 0 | $194,833 | |
| 02/15/2005 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $725,993 | |
| 03/23/2005 | TENNESSEE GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $1,788,512 | |
| 04/13/2005 | COLUMBIA GULF TRANSMISSION | CORROSION | 0 | 0 | $346,115 | |
| 09/09/2005 | GULF SOUTH PIPELINE COMPANY, LP | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $2,465,822 | |
| 09/14/2005 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $112,175 | |
| 04/12/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $266,097 | |
| 05/02/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $223,049 | |
| 07/05/2006 | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $127,667 | |
| 07/19/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $318,431 | |
| 08/07/2006 | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $498,658 | |
| 09/16/2006 | TENNESSEE GAS PIPELINE | CORROSION | 0 | 0 | $239,192 | |
| 09/30/2006 | TEXAS EASTERN TRANSMISSION, LP | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $270,740 | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $238,823 | |
| 10/29/2006 | COLUMBIA GULF TRANSMISSION | ALL OTHER CAUSES | 0 | 0 | $1,061,437 | |
| 12/19/2006 | SOUTHERN NATURAL GAS PIPELINE | OTHER OUTSIDE FORCE DAMAGE | 0 | 0 | $111,524 | |
| 01/15/2007 | COLUMBIA GULF TRANSMISSION | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $547,158 | |
| 07/09/2007 | ANR PIPELINE COMPANY | CORROSION | 0 | 0 | $1,004,066 | |
| 08/05/2007 | GOLDEN MEADOW | TENNESSEE GAS PIPELINE | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $124,673 |
| 09/10/2007 | VENICE | TENNESSEE GAS PIPELINE | ALL OTHER CAUSES | 0 | 0 | $125,926 |
| 10/14/2007 | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $495,305 | |
| 11/26/2007 | ANR PIPELINE CO | CORROSION | 0 | 0 | $853,465 | |
| 05/01/2008 | SOUTHERN NATURAL GAS CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $528,000 | |
| 07/14/2008 | ANR PIPELINE CO | MAT'L/WELD/EQUIP FAILURE | 0 | 0 | $232,500 | |
| 09/04/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $7,160,000 |
| 09/14/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $248,171 | |
| 09/15/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,276,000 | |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $7,889,000 | |
| 09/16/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $6,886,709 |
| 09/16/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $5,000,000 | |
| 09/17/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | ALL OTHER CAUSES | 0 | 0 | $7,700,000 |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $10,250,000 |
| 09/18/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $150,000 |
| 09/23/2008 | GRAND ISLE | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $3,750,000 |
| 10/01/2008 | ANR PIPELINE CO | ALL OTHER CAUSES | 0 | 0 | $350,000 | |
| 10/03/2008 | ANR PIPELINE CO | NATURAL FORCE DAMAGE | 0 | 0 | $470,000 | |
| 10/03/2008 | CAMERON | TENNESSEE GAS PIPELINE CO (EL PASO) | NATURAL FORCE DAMAGE | 0 | 0 | $425,000 |
| Totals | 0 | 0 | $105,670,974 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 10/27/1999 | JOHNSON BAYOU | WILLIAM FIELD SERVICES | CORROSION | 0 | 0 | $310,650 |
| 02/23/2000 | JOHNSON BAYOU | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $146,160 |
| 02/28/2001 | EL PASO FIELD SERVICES | EXCAVATION DAMAGE | 0 | 0 | $8,986,350 | |
| 04/05/2001 | MOSQUITO BAY MARSH | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $1,487,688 |
| 05/24/2001 | DYNEGY MIDSTREAM SERVICES, L.P. | EXCAVATION DAMAGE | 0 | 0 | $154,719 | |
| 06/30/2001 | MOSQUITO BAY | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $357,045 |
| 12/06/2001 | MOSQUITO BAY MARSH | WILLIAMS ENERGY GROUP-FIELD SERVICES | CORROSION | 0 | 0 | $535,567 |
| 02/15/2002 | PECAN ISLAND | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $769,089 |
| 03/13/2002 | TERREBONNE | WILLIAMS FIELD SERVICES | CORROSION | 0 | 0 | $237,020 |
| 10/03/2002 | EXXON CO USA - NEW ORLEANS PRODUCTION ORGANIZATION | NATURAL FORCE DAMAGE | 0 | 0 | $350,840 | |
| 06/11/2004 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $705,930 |
| 02/11/2005 | HOUMA | WILLIAMS GAS PIPELINES - TRANSCO | CORROSION | 0 | 0 | $790,611 |
| 01/27/2006 | HOUMA | TRANSCONTINENTAL GAS PIPE LINE COMPANY | CORROSION | 0 | 0 | $267,943 |
| 09/04/2007 | NORTHERN NATURAL GAS COMPANY | CORROSION | 0 | 0 | $477,881 | |
| 06/10/2008 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | CORROSION | 0 | 0 | $575,000 |
| 09/08/2008 | LAROSE | WILLIAMS ENERGY, LLC | NATURAL FORCE DAMAGE | 0 | 0 | $36,820,000 |
| 11/19/2008 | HOUMA | WILLIAMS GAS PIPELINE - TRANSCO | ALL OTHER CAUSES | 0 | 0 | $101,990 |
| Totals | 0 | 0 | $53,074,488 |
| Date | City | Operator | Cause | Fatalities | Injuries | Property Damage (C) (D) |
|---|---|---|---|---|---|---|
| 01/18/1999 | PLAQUEMINE | PLAQUEMINE, CITY OF | ALL OTHER CAUSES | 0 | 1 | $0 |
| 01/27/2000 | NEW ORLEANS | NEW ORLEANS PUBLIC SERVICE INC | NATURAL FORCE DAMAGE | 1 | 0 | $0 |
| 09/01/2000 | METAIRIE | LOUISIANA GAS SERVICE CO | ALL OTHER CAUSES | 0 | 0 | $121,800 |
| 04/06/2001 | NEW ORLEANS | GULF STATES UTILITIES CO | EXCAVATION DAMAGE | 0 | 0 | $178,522 |
| 03/31/2003 | YOUNGSVILLE | ENTEX, A NORAM ENERGY COMPANY (FORM. DIV OF ARKLA | EXCAVATION DAMAGE | 0 | 0 | $115,068 |
| 06/03/2003 | NORTH HODGE | LOUISIANA GAS SERVICE CO | EXCAVATION DAMAGE | 0 | 2 | $3,452 |
| 09/13/2003 | BATON ROUGE | GULF STATES UTILITIES CO | EXCAVATION DAMAGE | 0 | 0 | $172,602 |
| 01/13/2004 | BATON ROUGE | ENTERGY GULF STATES INC | ALL OTHER CAUSES | 1 | 0 | $68,146 |
| 08/29/2005 | NEW ORLEANS | ENTERGY NEW ORLEANS, INC - GAS DISTRIBUTION BUSINESS | NATURAL FORCE DAMAGE | 0 | 0 | $523,066,631 |
| 09/08/2005 | MERAUX | ATMOS ENERGY - LOUISIANA DIVISION | NATURAL FORCE DAMAGE | 0 | 0 | $2,180,577 |
| 09/30/2005 | FRANKLINTON | WASHINGTON PARISH GAS UTILITY DISTRICT #2 | NATURAL FORCE DAMAGE | 1 | 0 | $0 |
| Totals | 3 | 3 | $525,906,801 |
Notes
- Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion. Note: Significant Incidents include all Serious Incidents. Unless otherwise noted, any counts of Significant Incidents also include Serious Incidents.
- Gas Distribution incidents where fire/explosion was the primary cause of failure, such as a house fire that subsequently resulted in - but was not caused by - a distribution line failure are excluded from 2004 onward. This exclusion has not been applied in years prior to 2004 due to difficulty in identifying these types of events with the older report formats.
- The costs for incidents prior to 2008 are presented in 2008 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2008 dollars.
- Net Barrels Lost applies only to Liquid incidents and is the difference between Gross Barrels Spilled and Barrels Recovered.
Sources
- PHMSA Hazardous Liquid Flagged Incidents File - October 14, 2009
- PHMSA Gas Transmission Flagged Incidents File - October 14, 2009
- PHMSA Gas Distribution Flagged Incidents File - October 14, 2009
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.