All Reported Pipeline Incidents By Cause

This report is a sub-report of the PHMSA All Reported Pipeline Incidents report. As such, it represents All Reported Incidents over the time period and pipeline system specified.

It should be noted that hazardous liquid incidents within the All Reported Incidents data set include many smaller spills of lesser significance for which operators were not required to report second level, or sub-causes. As a result, the causes for these incidents can only be categorized within the appropriate "Unspecified..." sub-cause. These smaller spills with no specific sub-cause are not included in the Serious or Significant Incidents data sets by definition. The various "Unspecified..." sub-causes used below also include those older incidents which could not be mapped more specifically due to legacy form issues associated with each type of pipeline system.

It should also be noted that, due to the differing nature of the smaller hazardous liquid incidents being reported in 2002 and beyond, the cause breakdowns for the aggregated incidents will change for this time period as well.

The data source for this table is the PHMSA Flagged Incident File.(1)

More Pipeline Incidents and Mileage Reports are available.

National All Pipeline Systems: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 40 6.2% 1 1 $11,033,436 10.8%
INTERNAL CORROSION 40 6.2% 0 0 $5,277,873 5.1%
UNSPECIFIED CORROSION 40 6.2% 1 8 $430,023 0.4%
Sub Total 120 18.6% 2 9 $16,741,332 16.4%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 20 3.1% 0 6 $2,511,875 2.4%
THIRD PARTY EXCAVATION DAMAGE 69 10.7% 3 8 $13,348,298 13.0%
UNSPECIFIED EXCAVATION DAMAGE 4 0.6% 0 0 $64,505 0.0%
Sub Total 93 14.4% 3 14 $15,924,678 15.6%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 51 7.9% 1 7 $6,649,031 6.5%
Sub Total 51 7.9% 1 7 $6,649,031 6.5%
MAT'L/WELD/EQUIP FAILURE
ENVIRONMENTAL CRACKING-RELATED 2 0.3% 0 0 $3,219,629 3.1%
BODY OF PIPE 5 0.7% 0 0 $2,532,012 2.4%
PIPE SEAM 10 1.5% 0 0 $12,728,122 12.4%
BUTT WELD 4 0.6% 0 0 $323,516 0.3%
FILLET WELD 5 0.7% 0 0 $1,114,104 1.0%
UNSPECIFIED WELD 1 0.1% 0 0 $250 0.0%
JOINT/FITTING/COMPONENT 23 3.5% 0 0 $2,216,629 2.1%
UNSPECIFIED MAT'L/WELD FAILURE 19 2.9% 0 0 $158,585 0.1%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 22 3.4% 0 2 $355,025 0.3%
THREADED CONNECTION/COUPLING FAILURE 11 1.7% 0 1 $539,024 0.5%
NON-THREADED CONNECTION FAILURE 19 2.9% 0 0 $1,332,129 1.3%
UNSPECIFIED EQUIPMENT FAILURE 127 19.7% 0 0 $671,092 0.6%
UNSPECIFIED MAT'L/WELD/EQUIP FAILURE 3 0.4% 0 0 $156,000 0.1%
Sub Total 251 39.0% 0 3 $25,346,117 24.8%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 7 1.0% 0 0 $3,511,094 3.4%
HEAVY RAINS/FLOODS 5 0.7% 0 0 $4,359,000 4.2%
LIGHTNING 4 0.6% 0 0 $129,348 0.1%
TEMPERATURE 3 0.4% 0 0 $72,908 0.0%
HIGH WINDS 1 0.1% 0 0 $1,500,000 1.4%
UNSPECIFIED NATURAL FORCE DAMAGE 5 0.7% 0 0 $31,570 0.0%
Sub Total 25 3.8% 0 0 $9,603,920 9.4%
OTHER OUTSIDE FORCE DAMAGE
FIRE/EXPLOSION AS PRIMARY CAUSE 1 0.1% 0 0 $255,000 0.2%
VEHICLE NOT ENGAGED IN EXCAVATION 8 1.2% 0 1 $13,226,603 12.9%
PREVIOUS MECHANICAL DAMAGE 2 0.3% 0 0 $193,500 0.1%
INTENTIONAL DAMAGE 4 0.6% 0 0 $154,519 0.1%
UNSPECIFIED OUTSIDE FORCE DAMAGE 18 2.8% 0 0 $7,022,715 6.8%
Sub Total 33 5.1% 0 1 $20,852,337 20.4%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 56 8.7% 6 15 $6,532,394 6.4%
UNKNOWN CAUSE 6 0.9% 0 0 $372,672 0.3%
UNSPECIFIED 8 1.2% 0 0 $85,259 0.0%
Sub Total 70 10.8% 6 15 $6,990,325 6.8%
Totals 643 100.0% 12 49 $102,107,740 100.0%
National, All Pipeline Systems, 2002
National Hazardous Liquid: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 34 7.4% 0 0 $10,061,565 19.4%
INTERNAL CORROSION 25 5.4% 0 0 $1,333,460 2.5%
UNSPECIFIED CORROSION 39 8.5% 0 0 $430,023 0.8%
Sub Total 98 21.3% 0 0 $11,825,048 22.9%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 8 1.7% 0 0 $1,793,086 3.4%
THIRD PARTY EXCAVATION DAMAGE 22 4.7% 0 0 $2,945,120 5.7%
UNSPECIFIED EXCAVATION DAMAGE 4 0.8% 0 0 $64,505 0.1%
Sub Total 34 7.4% 0 0 $4,802,711 9.3%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 46 10.0% 1 0 $2,649,031 5.1%
Sub Total 46 10.0% 1 0 $2,649,031 5.1%
MAT'L/WELD/EQUIP FAILURE
BODY OF PIPE 1 0.2% 0 0 $15,012 0.0%
PIPE SEAM 6 1.3% 0 0 $12,264,331 23.7%
BUTT WELD 3 0.6% 0 0 $178,516 0.3%
FILLET WELD 3 0.6% 0 0 $753,889 1.4%
UNSPECIFIED WELD 1 0.2% 0 0 $250 0.0%
JOINT/FITTING/COMPONENT 15 3.2% 0 0 $1,107,750 2.1%
UNSPECIFIED MAT'L/WELD FAILURE 19 4.1% 0 0 $158,585 0.3%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 21 4.5% 0 0 $354,885 0.6%
THREADED CONNECTION/COUPLING FAILURE 10 2.1% 0 0 $501,673 0.9%
NON-THREADED CONNECTION FAILURE 19 4.1% 0 0 $1,332,129 2.5%
UNSPECIFIED EQUIPMENT FAILURE 127 27.6% 0 0 $671,092 1.3%
Sub Total 225 49.0% 0 0 $17,338,112 33.5%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 0.4% 0 0 $213,215 0.4%
LIGHTNING 4 0.8% 0 0 $129,348 0.2%
TEMPERATURE 3 0.6% 0 0 $72,908 0.1%
UNSPECIFIED NATURAL FORCE DAMAGE 3 0.6% 0 0 $16,070 0.0%
Sub Total 12 2.6% 0 0 $431,541 0.8%
OTHER OUTSIDE FORCE DAMAGE
FIRE/EXPLOSION AS PRIMARY CAUSE 1 0.2% 0 0 $255,000 0.4%
VEHICLE NOT ENGAGED IN EXCAVATION 3 0.6% 0 0 $12,383,777 23.9%
PREVIOUS MECHANICAL DAMAGE 1 0.2% 0 0 $45,500 0.0%
INTENTIONAL DAMAGE 3 0.6% 0 0 $81,519 0.1%
UNSPECIFIED OUTSIDE FORCE DAMAGE 2 0.4% 0 0 $4,715 0.0%
Sub Total 10 2.1% 0 0 $12,770,511 24.7%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 23 5.0% 0 0 $1,710,804 3.3%
UNKNOWN CAUSE 3 0.6% 0 0 $20,830 0.0%
UNSPECIFIED 8 1.7% 0 0 $85,259 0.1%
Sub Total 34 7.4% 0 0 $1,816,893 3.5%
Totals 459 100.0% 1 0 $51,633,847 100.0%
National, Hazardous Liquid, 2002
National Hazardous Liquid Onshore: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 32 6.9% 0 0 $9,161,565 17.7%
INTERNAL CORROSION 25 5.4% 0 0 $1,333,460 2.5%
UNSPECIFIED CORROSION 39 8.5% 0 0 $430,023 0.8%
Sub Total 96 20.9% 0 0 $10,925,048 21.1%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 8 1.7% 0 0 $1,793,086 3.4%
THIRD PARTY EXCAVATION DAMAGE 22 4.7% 0 0 $2,945,120 5.7%
UNSPECIFIED EXCAVATION DAMAGE 4 0.8% 0 0 $64,505 0.1%
Sub Total 34 7.4% 0 0 $4,802,711 9.3%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 46 10.0% 1 0 $2,649,031 5.1%
Sub Total 46 10.0% 1 0 $2,649,031 5.1%
MAT'L/WELD/EQUIP FAILURE
BODY OF PIPE 1 0.2% 0 0 $15,012 0.0%
PIPE SEAM 6 1.3% 0 0 $12,264,331 23.7%
BUTT WELD 3 0.6% 0 0 $178,516 0.3%
FILLET WELD 3 0.6% 0 0 $753,889 1.4%
UNSPECIFIED WELD 1 0.2% 0 0 $250 0.0%
JOINT/FITTING/COMPONENT 15 3.2% 0 0 $1,107,750 2.1%
UNSPECIFIED MAT'L/WELD FAILURE 19 4.1% 0 0 $158,585 0.3%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 21 4.5% 0 0 $354,885 0.6%
THREADED CONNECTION/COUPLING FAILURE 10 2.1% 0 0 $501,673 0.9%
NON-THREADED CONNECTION FAILURE 19 4.1% 0 0 $1,332,129 2.5%
UNSPECIFIED EQUIPMENT FAILURE 127 27.6% 0 0 $671,092 1.3%
Sub Total 225 49.0% 0 0 $17,338,112 33.5%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 0.4% 0 0 $213,215 0.4%
LIGHTNING 4 0.8% 0 0 $129,348 0.2%
TEMPERATURE 3 0.6% 0 0 $72,908 0.1%
UNSPECIFIED NATURAL FORCE DAMAGE 3 0.6% 0 0 $16,070 0.0%
Sub Total 12 2.6% 0 0 $431,541 0.8%
OTHER OUTSIDE FORCE DAMAGE
FIRE/EXPLOSION AS PRIMARY CAUSE 1 0.2% 0 0 $255,000 0.4%
VEHICLE NOT ENGAGED IN EXCAVATION 2 0.4% 0 0 $11,483,777 22.2%
INTENTIONAL DAMAGE 3 0.6% 0 0 $81,519 0.1%
UNSPECIFIED OUTSIDE FORCE DAMAGE 2 0.4% 0 0 $4,715 0.0%
Sub Total 8 1.7% 0 0 $11,825,011 22.9%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 22 4.7% 0 0 $1,660,794 3.2%
UNKNOWN CAUSE 3 0.6% 0 0 $20,830 0.0%
UNSPECIFIED 8 1.7% 0 0 $85,259 0.1%
Sub Total 33 7.1% 0 0 $1,766,883 3.4%
Totals 454 98.9% 1 0 $49,738,337 96.3%
National, Hazardous Liquid Onshore, 2002
National Hazardous Liquid Offshore: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 2 0.4% 0 0 $900,000 1.7%
Sub Total 2 0.4% 0 0 $900,000 1.7%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 1 0.2% 0 0 $900,000 1.7%
PREVIOUS MECHANICAL DAMAGE 1 0.2% 0 0 $45,500 0.0%
Sub Total 2 0.4% 0 0 $945,500 1.8%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 1 0.2% 0 0 $50,010 0.1%
Sub Total 1 0.2% 0 0 $50,010 0.1%
Totals 5 1.0% 0 0 $1,895,510 3.6%
National, Hazardous Liquid Offshore, 2002
National Gas Transmission: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 5 6.8% 0 0 $911,871 3.5%
INTERNAL CORROSION 11 15.0% 0 0 $3,038,753 11.9%
Sub Total 16 21.9% 0 0 $3,950,624 15.5%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 2 2.7% 0 0 $53,810 0.2%
THIRD PARTY EXCAVATION DAMAGE 11 15.0% 1 1 $1,038,455 4.0%
Sub Total 13 17.8% 1 1 $1,092,265 4.3%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 1 1.3% 0 0 $2,000,000 7.8%
Sub Total 1 1.3% 0 0 $2,000,000 7.8%
MAT'L/WELD/EQUIP FAILURE
ENVIRONMENTAL CRACKING-RELATED 2 2.7% 0 0 $3,219,629 12.6%
BODY OF PIPE 4 5.4% 0 0 $2,517,000 9.9%
PIPE SEAM 4 5.4% 0 0 $463,791 1.8%
BUTT WELD 1 1.3% 0 0 $145,000 0.5%
FILLET WELD 2 2.7% 0 0 $360,215 1.4%
JOINT/FITTING/COMPONENT 7 9.5% 0 0 $1,068,001 4.2%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 1.3% 0 2 $140 0.0%
THREADED CONNECTION/COUPLING FAILURE 1 1.3% 0 1 $37,351 0.1%
Sub Total 22 30.1% 0 3 $7,811,127 30.7%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 2.7% 0 0 $3,022,879 11.9%
HEAVY RAINS/FLOODS 4 5.4% 0 0 $4,059,000 16.0%
HIGH WINDS 1 1.3% 0 0 $1,500,000 5.9%
Sub Total 7 9.5% 0 0 $8,581,879 33.8%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 4 5.4% 0 0 $812,826 3.2%
PREVIOUS MECHANICAL DAMAGE 1 1.3% 0 0 $148,000 0.5%
INTENTIONAL DAMAGE 1 1.3% 0 0 $73,000 0.2%
Sub Total 6 8.2% 0 0 $1,033,826 4.0%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 5 6.8% 0 0 $547,590 2.1%
UNKNOWN CAUSE 3 4.1% 0 0 $351,842 1.3%
Sub Total 8 10.9% 0 0 $899,432 3.5%
Totals 73 100.0% 1 4 $25,369,153 100.0%
National, Gas Transmission, 2002
National Gas Transmission Onshore: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 5 6.8% 0 0 $911,871 3.5%
INTERNAL CORROSION 3 4.1% 0 0 $557,683 2.2%
Sub Total 8 10.9% 0 0 $1,469,554 5.7%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 2 2.7% 0 0 $53,810 0.2%
THIRD PARTY EXCAVATION DAMAGE 11 15.0% 1 1 $1,038,455 4.0%
Sub Total 13 17.8% 1 1 $1,092,265 4.3%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 1 1.3% 0 0 $2,000,000 7.8%
Sub Total 1 1.3% 0 0 $2,000,000 7.8%
MAT'L/WELD/EQUIP FAILURE
ENVIRONMENTAL CRACKING-RELATED 2 2.7% 0 0 $3,219,629 12.6%
BODY OF PIPE 4 5.4% 0 0 $2,517,000 9.9%
PIPE SEAM 4 5.4% 0 0 $463,791 1.8%
BUTT WELD 1 1.3% 0 0 $145,000 0.5%
FILLET WELD 2 2.7% 0 0 $360,215 1.4%
JOINT/FITTING/COMPONENT 5 6.8% 0 0 $472,501 1.8%
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT 1 1.3% 0 2 $140 0.0%
THREADED CONNECTION/COUPLING FAILURE 1 1.3% 0 1 $37,351 0.1%
Sub Total 20 27.4% 0 3 $7,215,627 28.4%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 2 2.7% 0 0 $3,022,879 11.9%
HEAVY RAINS/FLOODS 3 4.1% 0 0 $209,000 0.8%
Sub Total 5 6.8% 0 0 $3,231,879 12.7%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 2 2.7% 0 0 $120,500 0.4%
PREVIOUS MECHANICAL DAMAGE 1 1.3% 0 0 $148,000 0.5%
INTENTIONAL DAMAGE 1 1.3% 0 0 $73,000 0.2%
Sub Total 4 5.4% 0 0 $341,500 1.3%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 4 5.4% 0 0 $347,590 1.3%
UNKNOWN CAUSE 2 2.7% 0 0 $180,500 0.7%
Sub Total 6 8.2% 0 0 $528,090 2.0%
Totals 57 78.0% 1 4 $15,878,915 62.5%
National, Gas Transmission Onshore, 2002
National Gas Transmission Offshore: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
INTERNAL CORROSION 8 10.9% 0 0 $2,481,070 9.7%
Sub Total 8 10.9% 0 0 $2,481,070 9.7%
MAT'L/WELD/EQUIP FAILURE
JOINT/FITTING/COMPONENT 2 2.7% 0 0 $595,500 2.3%
Sub Total 2 2.7% 0 0 $595,500 2.3%
NATURAL FORCE DAMAGE
HEAVY RAINS/FLOODS 1 1.3% 0 0 $3,850,000 15.1%
HIGH WINDS 1 1.3% 0 0 $1,500,000 5.9%
Sub Total 2 2.7% 0 0 $5,350,000 21.0%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 2 2.7% 0 0 $692,326 2.7%
Sub Total 2 2.7% 0 0 $692,326 2.7%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 1 1.3% 0 0 $200,000 0.7%
UNKNOWN CAUSE 1 1.3% 0 0 $171,342 0.6%
Sub Total 2 2.7% 0 0 $371,342 1.4%
Totals 16 21.9% 0 0 $9,490,238 37.4%
National, Gas Transmission Offshore, 2002
National Gas Gathering: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
INTERNAL CORROSION 4 44.4% 0 0 $905,660 69.6%
Sub Total 4 44.4% 0 0 $905,660 69.6%
EXCAVATION DAMAGE
THIRD PARTY EXCAVATION DAMAGE 2 22.2% 0 0 $24,000 1.8%
Sub Total 2 22.2% 0 0 $24,000 1.8%
MAT'L/WELD/EQUIP FAILURE
JOINT/FITTING/COMPONENT 1 11.1% 0 0 $40,878 3.1%
Sub Total 1 11.1% 0 0 $40,878 3.1%
NATURAL FORCE DAMAGE
HEAVY RAINS/FLOODS 1 11.1% 0 0 $300,000 23.0%
Sub Total 1 11.1% 0 0 $300,000 23.0%
OTHER OUTSIDE FORCE DAMAGE
VEHICLE NOT ENGAGED IN EXCAVATION 1 11.1% 0 1 $30,000 2.3%
Sub Total 1 11.1% 0 1 $30,000 2.3%
Totals 9 100.0% 0 1 $1,300,538 100.0%
National, Gas Gathering, 2002
National Gas Distribution: All Reported Incident Details: 2002
Reported Cause of Incident (A) Number % Fatalities Injuries Property Damage as Reported (B) (C) % of Property Damage
CORROSION
EXTERNAL CORROSION 1 0.9% 1 1 $60,000 0.2%
UNSPECIFIED CORROSION 1 0.9% 1 8 $0 0.0%
Sub Total 2 1.9% 2 9 $60,000 0.2%
EXCAVATION DAMAGE
OPERATOR/CONTRACTOR EXCAVATION DAMAGE 10 9.8% 0 6 $664,979 2.7%
THIRD PARTY EXCAVATION DAMAGE 34 33.3% 2 7 $9,340,723 39.2%
Sub Total 44 43.1% 2 13 $10,005,702 42.0%
INCORRECT OPERATION
UNSPECIFIED INCORRECT OPERATION 4 3.9% 0 7 $2,000,000 8.4%
Sub Total 4 3.9% 0 7 $2,000,000 8.4%
MAT'L/WELD/EQUIP FAILURE
UNSPECIFIED MAT'L/WELD/EQUIP FAILURE 3 2.9% 0 0 $156,000 0.6%
Sub Total 3 2.9% 0 0 $156,000 0.6%
NATURAL FORCE DAMAGE
EARTH MOVEMENT 3 2.9% 0 0 $275,000 1.1%
UNSPECIFIED NATURAL FORCE DAMAGE 2 1.9% 0 0 $15,500 0.0%
Sub Total 5 4.9% 0 0 $290,500 1.2%
OTHER OUTSIDE FORCE DAMAGE
UNSPECIFIED OUTSIDE FORCE DAMAGE 16 15.6% 0 0 $7,018,000 29.4%
Sub Total 16 15.6% 0 0 $7,018,000 29.4%
ALL OTHER CAUSES
MISCELLANEOUS CAUSE 28 27.4% 6 15 $4,274,000 17.9%
Sub Total 28 27.4% 6 15 $4,274,000 17.9%
Totals 102 100.0% 10 44 $23,804,202 100.0%
National, Gas Distribution, 2002

Notes

  1. PHMSA has gathered increasingly targeted incident cause data over time. As such, the available reportable categories of cause (eg: Internal/External Corrosion vs Corrosion in general) have increased over time. This report spans time periods over which the reportable cause categories have changed. The cause categories in this report should be taken as general and not specific for years prior to 2002 for Liquid and Gas Transmission, and prior to 2004 for Gas Distribution.
  2. The costs presented here are nominal (that is, as reported by the Operator at the time of the incident) and are not adjusted to account for commodity cost fluctuations or general inflation.
  3. For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report.

Sources

  1. PHMSA Flagged Incidents File - Apr 01, 2014. Note: Incidents occurring up to 30 days prior the Incident File source date may not appear in these reports due to the 30-day reporting period allowed by PHMSA regulation.

See Pipeline Incidents and Mileage Reports for more pipeline safety reports.

Feedback | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2014 PHMSA | DOT Home | PHMSA Home | PSA Forum | Generated: 04/02/14 11:33:35 PM